Loading...
HomeMy WebLinkAboutIMPALA MEADOWS (FORMERLY MOUNTAIN VIEW SUBDIVISION) - BDR220008 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview August 28, 2023 Michael Botelho POUDRE SCHOOL DISTRICT 2445 LAPORTE AVE Fort Collins, CO 805212211 RE: Mountain View Subdivision, BDR220008, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Mountain View Subdivision. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744 Topic: General Comment Number: 1 12/29/2022: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Comment Number: 2 12/29/2022: SUBMITTAL: As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Comments requiring action 2 should NOT have a response such as noted or acknowledged. You will need to provide references to specific project plans, pages, reports, or explanations of why comments have not been addressed [when applicable]. Comment Number: 3 12/29/2022: SUBMITTAL: Please follow the Electronic Submittal Requirements and File Naming Standards found at https://www.fcgov.com/developmentreview/files/electronic submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888. File names should begin with the file type, followed by the project information, and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf File type acronyms maybe appropriate to avoid extremely long file names. Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study. Reach out to me if you would like a list of suggested names. *Please disregard any references to paper copies, flash drives, or CDs. Comment Number: 4 12/29/2022: SUBMITTAL: All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s. AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be removed prior to submittal as they can cause issues with the PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and newer) in the command line and enter "0". Read this article at Autodesk.com for more on this topic: https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html Comment Number: 5 12/29/2022: SUBMITTAL: Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. When you are preparing to resubmit your plans, please notify me with an expected submittal date with as much advanced notice as possible. Comment Number: 6 12/29/2022: INFORMATION: Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project. Comment Number: 7 12/29/2022: INFORMATION: ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00. 3 Comment Number: 8 12/29/2022: FOR FINAL APPROVAL: The Director shall issue a written decision to approve, approve with conditions, or deny the development application based on compliance with the standards referenced in Step 8 of the Common Development Review Procedures (Section 2.2.8). The written decision shall be mailed to the applicant, to any person who provided comments during the comment period and to the abutting property owners and shall also be posted on the City's website at www.fcgov.com. Comment Number: 9 12/29/2022: FOR FINAL APPROVAL: If the project is approved by the Director, there is a two-week appeal period from the date of the decision. The project is not able to be recorded until it is confirmed there are no appeals. Comment Number: 10 12/29/2022: FOR FINAL APPROVAL: All "For Final Approval / For Approval" comments need to be addressed and resolved prior to moving forward with the final documents and recording of this project. I will provide a recording checklist and process information when we are closer to this step. Department: Planning Services Contact: Arlo Schumann aschumann@fcgov.com 970-221-6599 Topic: General Comment Number: 2 08/23/2023: FOR APPROVAL: The plat labels the new subdivision plat plan as Lot 1 and also shows Parcel A and Parcel B, but does not seem to show a parcel dividing line on the plan. It is unclear to planning staff what the intent is. There was an assumption that this was intended to be a single lot and parcel and the intent was to use it as a single property. The issue for planning is that a parcel line would be used as a property line for determining setbacks, and would need to be shown not to conflict with the existing building placement and setback requirements. We would like to get clarity on the intent and revise the plat documents to avoid confusion. Possible options we had are: Revise the plat to only have 1 lot/ 1 parcel Or If both parcels are under common ownership provide notes on the plans that these two parcels are to be used as a single property and that a transfer of ownership of a parcel would require a new plat. 4 Updated on Plat Document Department: Water-Wastewater Engineering Contact: Stephen Agenbroad sagenbroad@fcgov.com Topic: General Comment Number: 2 08/21/2023: INFORMATION ONLY: After doing a site visit and looking at the provided site plan, it appears that the fire hydrant is located within the dedicated ROW. In addition, the required 15-ft of public utility easement provides the necessary easement width for the existing fire hydrant. It looks as though the "Waterline Easement" extends up to the water meter which is considered private. Therefore, the additional "waterline easement" is not necessary. Therefore, once the easement is removed then no other requirements apply at this time necessary. Updated on Plat Document Department: Light And Power Contact: Rob Irish rirish@fcgov.com 970-224-6167 Topic: General Comment Number: 1 08/21/2023: FOR APPROVAL - UPDATED: Comment responses indicate the easement has been shown on the plat but I am not seeing the easement and it does not appear to exist. This easement would be along the west edge of Parcel A to encompass the existing electric facilities feeding 2540 W. LaPorte. A 10-foot easement would be preferred for future upgrade but could go with an 8 foot if needed. Please reach out to me directly if this is confusing or I missed the easement somehow. Thanks! 12/29/2022: FOR APPPROVAL: Light & Power has existing electric facilities feeding 2540 LaPorte Ave. With the platting of the property, we would like to see the existing transformer and electric primary placed in a Utility easement. Updated on Plat Document Department: Building Services Contact: Russell Hovland rhovland@fcgov.com 970-416-2341 Topic: Building Insp Plan Review Comment Number: 1 08/21/2023: If this is PSD school property and buildings, then it is not regulated by the City building dept and permits should go thru the school districts normal process. Comment Number: 2 5 08/21/2023: I noticed that the main building on the site is built against its east property line and does not provide the minimum fire separation distance required by the building code. If re-platting, I strongly suggest removing the PL that divides the the lots so that the fire separation is no longer an issue. Updated on Plat Document Department: Technical Services Contact: Jeff County jcounty@fcgov.com 970-221-6588 Topic: Plat Comment Number: 1 08/22/2023: FOR FINAL APPROVAL-UPDATED: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. If you have any specific questions about the redlines, please contact John Von Nieda at 970-221-6565 or jvonnieda@fcgov.com