Loading...
HomeMy WebLinkAboutFISCHER PROPERTIES - FDP230010 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORT FINAL DRAINAGE REPORT FISCHER PROPERTIES FORT COLLINS, COLORADO MARCH 15, 2023 NORTHERNENGINEERING.COM 970.221.4158 FORT COLLINS GREELEY This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is necessary, we recommend double-sided printing. NORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY FINAL DRAINAGE REPORT: FISCHER PROPERTIES 12 | 16 water quality. In order to meet the water quality requirement, the existing impervious area of off- site basins OS-2, OS-4 and OS-5 are proposed to be treated in exchange. Rain Gardens/Underground Chambers 3. Rain Gardens A and B provides Low Impact Development (LID) for Basins 301, 302, 303, 304, OS-2 and OS-5. This rain garden was sized to provide 120% of the calculated 12-hour volume. 4. Stormtech Underground Chambers provides Low Impact Development (LID) for Basins 200-208 and OS-4. This underground chamber system was sized to provide 120% of the calculated 12-hour volume. 5. Overflow inlets will be provided in both rain gardens to pass storms greater than the WQCV to Detention Pond 3. 6. An overflow weir is provided in the underground chambers to pass storms greater than the WQCV into the detention portion of the underground chambers (Detention Pond 2). 7. The site is required to treat 75% of new impervious area with LID treatment. Due to site constraints stated previously, Basins OF-1 and OF-2 are unable to be captured and treated for water quality. In order to meet the water quality requirement, the existing impervious area of off-site basins OS-2, OS-4 and OS-5 are proposed to be treated in exchange. This site treats 87.15% of the on-site impervious area with LID and an additional 10,714 ft2 of offsite area for an effective percent of impervious area treated of 94.64%. Water Quality Pond 1. Pond 1 provide water quality for Basins 100-105 through a traditional 40-hour extended detention basin. The WQCV for Pond 1 was sized to 120% of the calculated 40-hour volume. Total WQ Treatment 1. Using a combination of LID and Traditional Extended Detention Basins of both on-site and off-site basins, this site is able to treat 106% of the required site impervious area. LID Site Summary - New Impervious Area Total Area of Current Development 234,073 ft2 Total On-site Impervious Area 143,103 ft2 75% Required Minimum Area to be Treated by LID 107,327 ft2 Total On-site Impervious Area Treated by LID 103,480 ft2 Percent On-site Impervious Treated by LID 72.31% Additional Off-site Impervious Area Treated by LID 10,714 ft2 Percent Total Impervious Area Treated by LID 79.80% Total Impervious Area Treated by Traditional WQ 36,977 ft2 Percent Impervious Treated by Traditional Water Quality 25.84% Percent Impervious Area Treated by Traditional WQ or LID 105.64% Table 3 - LID Summary Vault ID Required Detention Volume by FAA Method (cf) Flow, 100-yr (cfs) Chamber Type Chamber Release Ratea (cfs) Chamber Volumeb (cf) Installed Chamber w/ Aggregatec (cf) Minimum No. of Chambersd Total Release Ratee (cfs) Required Storage Volume by FAA Method (cf) Minimum No. of Chambersf Provided Number of Chambers Provided Release Rate (cfs) Storage Provided within the Chambersg (cf) Total Installed System Volumeh (cf) Pond 2 12053 18.73 MC-3500 N/A 109.90 161.70 75 N/A N/A N/A 75 N/A 8243 12128 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (30%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Chamber Detention Configuration Summary FDCUDUD NYLOPLAST DO NOT POLLUTEDRAINS TOWATERWAYSDO NOT POLLUTE DRAINS TO WA T E R W A Y S NYLOPLAST DUCTILE IRON NYLOPLAST DO NOT POLLUTEDRAINS TOWATERWAYS DO NOT POLLUTE DRAINS TO WA T E R W A Y S NYLOPLAST DUCTILE IRON DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS NYLOPLAST DO NOT POLLUTEDRAINS TOWATERWAYS DO NOT POLLUTE DRAINS TO WA T E R W A Y SNYLOPLAST DUCTILE IRON XX XXXXXXXX X D D D D D D STSTSTST6" ABD N W 6" ABDN W RAIN GARDEN B WQ DETENTION POND 3 100-YR WSEL = 5031.11 RAIN GARDEN A 0.31 ac. OS-2 0.46 ac. 200 0.80 305 0.93 ac. OS-4 0.13 ac. OS-1 0.40 ac. OS-3 0.08 ac. 100 0.23 ac. OF-1 0.04 ac. OF-2 0.97 ac. 304 0.20 ac. 302 0.21 ac. OS-5 0.09 ac. 303 0.37 ac. 300 0.21 ac. 301 0.18 ac. 201 0.26 ac. 202 0.07 ac. 203 0.02 ac. 204 0.28 ac. 205 0.27 ac. 206 0.21 ac. 207 0.12 ac. 208 0.26 ac. 101 0.05 ac. 102 0.02 ac. 103 0.06 ac. 104 0.14 ac. 105 200 300 OS-5 OS-1 OS-3 OS-4 OF 301 302 OS-2 201 202 203 204 205206 207 208 303 304 305 WQ DETENTION POND 1 100-yr WSEL = 5029.31 STORMTECH CHAMBERS 2 DRAWN BY: SCALE: ISSUED: FISCHER PROPERTIES SHEET NO: FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 E N G I N E E R N GI EHTRON R N 970.221.4158 northernengineering.com LID EXHIBIT A. Boese 1in=100ft 03/09/23 PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET ADESIGN POINT DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY A LEGEND: ( IN FEET ) 1 inch = ft. Feet0100100 100 RAIN GARDEN LIMITS STORMTECH CHAMBERS FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION LID Site Summary - New Impervious Area Total Area of Current Development 234,073 ft2 Total On-site Impervious Area 143,103 ft2 75% Required Minimum Area to be Treated by LID 107,327 ft2 Total On-site Impervious Area Treated by LID 103,480 ft2 Percent On-site Impervious Treated by LID 72.31% Additional Off-site Impervious Area Treated by LID 10,714 ft2 Percent Total Impervious Area Treated by LID 79.80% Total Impervious Area Treated by Traditional WQ 36,977 Percent Impervious Treated by Traditional Water Quality 25.84% Percent Impervious Area Treated by Traditional WQ or LID 105.64% Project Number:Project: Project Location: Calculations By:Date: Sq. Ft. Acres 100 3,599 0.08 32%n/a Traditional 0 1,152 101 11,385 0.26 58%n/a Traditional 0 6,603 102 1,983 0.05 73%n/a Traditional 0 1,448 103 674 0.02 76%n/a Traditional 0 512 104 2,480 0.06 71%n/a Traditional 0 1,761 105 6,071 0.14 37%n/a Traditional 0 2,246 200 19,824 0.46 85%Stormtech 2 Stormtech 479 16,850 201 7,699 0.18 86%Stormtech 2 Stormtech 190 6,621 202 11,368 0.26 80%Stormtech 2 Stormtech 249 9,094 203 3,196 0.07 60%Stormtech 2 Stormtech 50 1,918 204 1,051 0.02 63%Stormtech 2 Stormtech 17 662 205 12,287 0.28 74%Stormtech 2 Stormtech 241 9,092 206 11,663 0.27 69%Stormtech 2 Stormtech 210 8,047 207 9,003 0.21 86%Stormtech 2 Stormtech 222 7,743 208 5,021 0.12 78%Stormtech 2 Stormtech 106 3,916 300 15,967 0.37 14%n/a Traditional 0 2,235 301 9,258 0.21 71%Rain Garden B Rain Garden 173 6,573 302 8,811 0.20 63%Rain Garden A Rain Garden 145 5,551 303 4,007 0.09 51%Rain Garden A Rain Garden 56 2,044 304* 42,279 0.97 60% 58/42 split Rain Garden A/B Rain Garden 666 25,367 305 34,809 0.80 61%n/a Traditional 0 21,233 OF-1 9,836 0.23 13%n/a n/a 0 1,279 OF-2 1,803 0.04 64%n/a n/a 0 1,154 Total On-site 234,073 5.37 143,103 OS-1 5,772 0.13 80%n/a n/a 0 4,617 OS-2* 13,395 0.31 26% 58/42 split Rain Garden A/B Rain Garden 124 3,483 OS-3 17,304 0.40 25%n/a n/a 0 4,326 OS-4 40,418 0.93 12%Stormtech 2 Stormtech 210 4,850 OS-5 9,158 0.21 26%Rain Garden A Rain Garden 84 2,381 Total Off-Site 86,047 1.98 19,657 Sq. Ft. Acres Rain Garden A 54,267 1.25 49% 26,709 302, 303, 304*, OS-2*, OS-5 Rain Garden 738 886 Rain Garden B 32,641 0.75 57% 18,690 301, 304*, OS-2* Rain Garden 495 594 Stormtech 2 121,530 2.79 57% 69,272 200, 201, 202, 203, 204, 205, 206, 207, 208, OS- 4 Stormtech 1,835 2,202 Total 208,438 4.79 114,671 3,682 Sq. Ft. Acres WQ Pond 1 26,192 0.60 52% 13,620 100, 101, 102, 103, 104, 105 Standard 462 555 WQ Pond 3 50,776 1.17 46%23,357 300, 305 Standard 828 993 Total 76,968 1.77 36,977 1,548 234,073 ft2 143,103 ft2 107,327 ft2 103,480 ft2 72.31% 10,714 ft2 79.80% 36,977 ft2 25.84% 105.64% Water Quality Treatment via Traditional Water Quality LID Summary AreaBasin ID WQ Treatment TypePercent Impervious LID ID Fischer Subdivision 3/9/2023 1382-002 Fort Collins, Colorado A. Boese Total Impervious Area (ft2) Required Volume (ft3) LID Summary per Basin Tributary Area Weighted % Impervious Impervious Area (ft2) Vol. w/20% Increase per Fort Collins Manual (ft3) Subbasin ID Treatment TypeWQ Treatment Volume per UD-BMP (ft3) Water Quality Treatment via LID Percent Impervious Area Treated by Traditional WQ or LID Total On-site Impervious Area Treated by LID 75% Required Minimum Area to be Treated by LID Total Area of Current Development Total On-site Impervious Area Vol. w/20% Increase per Fort Collins Manual (ft3) Total Impervious Area Treated by Traditional WQ Percent Impervious Treated by Traditional Water Quality WQ Treatment Tributary Area Weighted % Impervious LID Site Summary - New Impervious Area Treatment Type Volume per UD-BMP (ft3) Additional Off-site Impervious Area Treated by LID Percent On-site Impervious Treated by LID Subbasin IDImpervious Area (ft2) Percent Total Impervious Area Treated by LID Circular D or Da, Pipe Diameter (ft) H or Ha, Culvert Height (ft) W, Culvert Width (ft) Yt/D Q/D1.5 Q/D2.5 Yt/H Q/WH0.5 Storm Line C 7.76 1.50 0.60 0.40 4.22 2.82 N/A N/A 4.60 2.82 1.10 1.54 Type L 2.00 6.00 1.5 Storm Line D 2.24 1.00 0.40 0.40 2.24 2.24 N/A N/A 5.40 2.24 0.56 2.14 Type L 3.00 4.00 1.5 Storm Line E 9.08 1.50 0.60 0.40 4.94 3.30 N/A N/A 4.20 3.30 1.47 4.00 Type L 5.00 6.00 1.5 Storm Line F 9.06 1.25 0.50 0.40 6.48 5.19 N/A N/A 2.30 5.19 1.19 2.59 Type L 3.00 5.00 1.5 Design Discharge (cfs) Expansion Factor 1/(2tanq) (From Figure MD-23 or MD-24) Yt, Tailwater Depth (ft) Culvert Parameters At=Q/V (ft) Froude Parameter Q/D2.5 Max 6.0 or Q/WH1.5 Max 8.0 Riprap Type (From Figure MD-21 or MD-22) By: Adam Boese CALCULATE Date: 02/23/2023 Project: 1382-002 Urban Drainage pg MD-107 L= 1/(2tanq)* [At/Yt)-W] (ft) INPUT Storm Line/Culvert Label OUTPUT Spec Length of Riprap (ft) Box Culvert CALCULATIONS FOR RIPRAP PROTECTION AT PIPE OUTLETS Circular Pipe (Figure MD-21) Rectangular Pipe (Figure MD-22)Spec Width of Riprap (ft) 2*d50, Depth of Riprap (ft) for L/2