ATTN: _ Mr. Ted She�ard} CitX of Fort Collins_ __ ___ __ ___
FROM: Joyce Jilek, A.I.A.
DATE: December 2, 2002
RE: Bank One at Miramont Office Park, (Harmony 8� Boardwalk) Responses
The following is a summary of the responses to comments regarding the above referenced Bank
One project. The comments occur and are referenced per your attached Staff Project Review,
which is attached for reference.
ISSUES:
Department: Current Planning
Issue Contact Ted Shepard
Topic: General
62. The plans do indicate the upgraded features in the plaza area — 4 light bollards and 2
benches are to provided.
63. Sheet is deleted.
64. Street trees are shifted.
Department: Engineering
Topic: General
38.
54.
55.
60.
61.
62.
Bank One is working on this with the Church. It is understood that it is required prior
to mylar submittal.
Has been removed from Planning documents. Per subsequent conversations, sheet 3
of 3 was also removed.
Planning approval block was corrected.
Not applicable.
The titles have been changed to agreed upon language (subsequent to this
comment); except FP title is exact per the recommended verbage.
Trees have been shifted.
Topic: Landscaping:
6/19 Tree locations have been shifted.
53. Landscape plan no longer attached to the utility plan sheet.
MEMORANDUM
�
U
�
CLC A55OCIATE5
�
: Plat
49. A blanket vacation note has been added to the plat.
Topic: Utililty Plans
37. Exact patch limits have been negotiated referencing surveyed Harmony Boulevard
data. No blanket notes remain; except for detailed striping repair.
57. The second benchmark has been added.
Department: Light 8� Power
Issue Contact: Monica Moore
Topic: General
1. Not applicable as confirmed with Monica Moore (this was a blanket comment).
2. Not applicable as confirmed with Monica Moore (this was a blanket comment).
3. Streetlight preliminary design received and trees adjusted appropriately.
4. Blanket comment. Per subsequent discussions, required distance should be met.
Department: Stormwater Utility
Issue Contact: Wes Lamarque
Topic: Drainage
48. The plat and Construction Documents now reflect two 10 foot drainage easement on
the Bank property. In our research, we have been unable to identify any easements
on the church property where it is common with the Bank lot. We are in negotiations
with the Church to provide the required easements.
50. The water surfaces were incorrectly placed on the drawings. The revision should
clarify. Note that both the water quality orifices and the initial control orifice are
behind the trash area (screen).
51. Has been completed.
Topic: Erosion/Sediment Control
56. No action required.
Department: Transportation Planning
Issue Contact: Mark Jackson
Topic: General
20. Variations were emailed back and forth. Resulting design has been approved by all
parties.
�
L'�
CLC A550CIATE5
r
�_
ns were emailed back and forth. Resulting design has been approved by all
parties.
Department: Water Wastewater
Issue Contact: Jeff Hill
Topic: General
46. Has been coordinated.
47. No adjustment. Verbage to that effect is added to the utility plan.
Department: Water Wastewater
Issue Contact: Roger Buffington
Topic: Utility Plans
58. Clearance is available in current location.
Final Issues added by applicant:
Building footprint has been slightly modified per most recent bank plans.