Loading...
HomeMy WebLinkAboutBANK ONE FORT COLLINS AT MIRAMONT OFFICE PARK - PDP - 54-87AR - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTCLC Associates, Inc. saao e. o�n�a ea. Suire 2000 G�eenwood V i1G age, t:.'1� UC� L�� 303/'770-560(i soai��o-2sas =.ix c9c-inc.co�et Ptanning Engineering Architecture � February 28, 2002 Ms. Ginger podge Current Planning Department City of Fort Collins 281 N. College Avenue Fort Collins CO 80522-0580 RE: Bank One at Harmony Road and Boardwalk Drive Submittal Checklist Summary Dear Ms. Dodge: We are submitting the following documents for the Project Development Plan with subdivision Plat for the Proposed Bank One branch banking facility at the southwest corner of Harmony and Boardwalk: • Application form is enclosed, along with a check for a portion of the filing fee ($50.00 for sign posting and $.50 per label for 62 labels for a total of $81. 00). P/ease note that the Project Development Plan (PDP) with Subdivision Plat Fee of $5, 879.00 was paid by Bank One directfy to the City of Fort Collins, as was reconfirmed this week. Therefore, the fotal amounts paid are $5, 960. 00. • Three lists of names and address of all owners of record of real property within at least 500 feet of the property lines for the parcel of land for which the project is proposed exclusive of public right-of-way. Two sets mailing labels and one reproducible copy are included as requested.. • Complete list of proposed Street Names for the development. (This is not applicable as no streets are proposed for this development). • Certification of Type 1 or Type II review: Per the enclosed copy of the Conceptual Review staff Comments for the meeting dated August 27, 2001, item 1 indicates this will be a Type One review. • Landscape Plans: 20 cr�pies, folded are included. • Statement of Planning Objectives: 26 copies are included of our letter referencing this. • Transportation Impact Analysis (TIA) — 6 copies prepared by Eugene Coppola are included. • Site Plan drawings: 30 sets, folded are included. • Subdivision plat: 23 copies, folded are included. • Architectural Elevations: 6 copies, folded are included. • Utility Plans (13 sets, rolled are included). • Requirements for utlity plans checklist (1 copy is included) • Drainage and erosion control report (4 copies are included) • Soils Report (2 copies are included). � Landscape Archi;ecr ir€� I.a:�� Sa:-veying CJ Ms. Ginger podge February 28, 2002 Page 2 i • Context Diagram (5 copies — 8 1/2" x 11 " are included) • Lighting Plans (5 copies, folded are included.) • Hazardous Materials Impact Analysis: As confirmed by Bank One, the bank will not have a Hazardous Materials impact on the above mentioned site and therefore this is not applicable. • Street cross sections schematics: No new streets are proposed in this development and thus this is not applicable. � Copy of applicable conceptual letter and explanation of how issues have been addressed. A copy of the conceptual letter is included, along with our response letter addressing the proposed resolutions to the issues. • Legal description of the site: Lots 1 and 2, Bank One at Harmony Market P.U.D., Cify of Fort Collins, County of Larimer, State of Colorado. See attached letter. • Name and address of each owner of property within the boundaries of the development plan area. The owner of all property withrn the development plan area is Bank One Colorado, N.A. 1125 17"' Sfreet, Suite 200 Denver, CO 80202. • List of names of all general and limited partners and/or officers involved as either applicants or owners. Owner: Bank One Colorado, N.A. 1125 17�h Street, Suite 200 Denver, CO 80202 Steve Schaffer, SVP — Market Manager Dave Trefz, VP — District Manager Joe Davis, VP — District Manager Bank One Contact: Jim Ransco Bank One Corporate Real Estate Services Mail Code AZ1-1167 PO Box 71 Phoenix AZ 85001-0071 Telephone: 602.221.1426 Fax: 602.221.1275 • Development of Phasing Schedule: Construction and development of this will be as a single phase. • Explanation of any variance requests: A copy of a vanance requesf is included with full explanation. • Signed letters of intent indicating that all required off-site easement and off-site rights-of-way can be negotiated in time for final development plan submittal: None are anticipated at this time, not applicable. • Ms. Ginger podge February 28, 2002 Page 3 • Other information that the Director may require: No other requirements have been established at this time. I believe this should guide you as to all the documents being provided, and except for the rolled Utility Drawings, they should be in order as called for on the checklist. Again, thank you for your help with this process. Sincerely, CLC ASSOCIATES, INC. � __... � _� - �y ��? � " .�, � Joyce (Donaldso Jilek, A.I.A. Associate JAJ:cst