HomeMy WebLinkAboutTHE LODGE AT MIRAMONT PUD - FINAL - 54-87AQ - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW.1�pr• :09-99 20:05
-�:
City of ]Fort Collins
P.02
� � ��-o[�
Community Planning and Environmental :�ervices
Current Planning
April 9, 1999
Ms. Linda Ripley
VF Ripley and Associat�s
1113 Stoney Hill Drive
Fort Collins, CO 80525
Dear Ms. Ripley:
For your information, I have attached a copy of Staff's preliminary comments
concerning the Development Plan on a site located on the northwest
intersection of Boardwalk Drive and Lemay Avenue. This potential development
of 96 dwelling units was presented before the Conceptual ReviewTeam on April
5, 1999.
The conceptual review comments are offered informally by Staff to assist you in
preparing the detailed components of the project application. Add,'tional
comments may be forthcoming as the various departments and reviewing
agencies continue to review this request. Modifications and additions to these
comments may be made at the time of formal review of this project and all code
Provisions of the Land Use Code must.be addressed in your burden of proof
narrative and development plans.
If'you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 970.2:21:6750.
Sincerel ,
�� � . 4
Ronald G. Fuehs
City Planner
cc: Eric Bracke
Stormwater Department
Engineering
File
C:1My Documentslf'lanning Document�Mvunta�n View Apartments concrpt review letter.doc
�, - - ---
2.L�1 Norlh Co11c�c AVci�tjc • T'C�. Rt�x 5Rf1 • F�rl Co11in�, CC.) $Q522d15RQ •(97A) 22'I-(,Tf1. • FAX (97(I) 4'lli�•?02��
APR-09-1999 20�20 98i P•02
+.Apr�09-99 20:05 � � P.03
iF TAFF , MNCGIVTS
CONCEi'TUA,L REV W S CO
Cily ciE Furt C'.ollin,
�
MEETING DATE:
ITEM;
APFLICANT:
April 5, 1999
Mountain View Apartments
Ms. linda Ripley
LAND USE DATA; Request to develop 96 dweiling units on a site located on the northwest
intersection of Boardwalk Drive and Lemay Avenue.
DEPARTMENTAL CONTACTS:
Current Planning-
Advance Planning-
Zoning Department-
Engineering Depariment-
Street Oversizirig Coordinator-
City Tra�fic Engineer-
Poudre Fire Aulhority-
Stormwater Utilities-
Stormwater Utilities-
Water & Sewer Utilities-
Natural Resources Development Planner-
Light and Power-
Historie Preservation-
Transportation Planning-
Transportation Services-
Farks and Recreation-
COMMENTS:
Ron Fuchs
Clark Mapes
Gary Lopez
Tim Blandford
Matt BaRer
Eric Bracke
Ron Gonzales
Glen Schlueter
Matt Fater
Roger Buffington
Kim Kreicneyer
Rob Irish
Karen McWilliams
John Daggett
Kathleen Reavis
Janet Meisel-Burns
970.221-6750
970.221.6754
970.221.6T6D
970.221.6605
970.224.6108
970.224.6062
970.221.6570
970.221.6681
970.416.2146
970.221.6681
970.221,6750
970.221.6700
970.221.6376
970.224.6190
970,224.6140
970.221.6367
Gary Lopez of the Zoning Department offered the following comments:
a. The site is located in the MMN Zone District and the project will be regulated under the
Land Use Code (LUC),
b. The proposed use(s) are subject to Type I review.
c. All modifications to code standards will be reviewed by the P(anning and Zoning Board,
d. This development must comply with all appticable General Development Standards as set
forth in Article 3 of the Land Use Code, including but not limited to the requirements for
vehicle and bicycle parking, parking, building setbacks, landscaping, et cetera. These
development standards are set forth in the following divisions:
1) Division 3.1 General Provisions
2) Division 3.2 Site Planning and Design Standa�ds
3) Division 3.3 Engineering Standards
4) Division 3.4 Environmental, Naturat Area, Recreational and Cultural Resource
Protection Standards
C�MMUNi�� ti� r�.nnn:inc: ANI7 F.NVIRUV�ICN1'AL SL'ItV1(�N:�;
<'I:RRF.NT I�i.ANNI\'t; l?1;1111:1'MF'.I�T
l?81 N. Cull��,� Avc. Cli. B�rx tiNU hnri ('cil�in:5, �'(.) HIl�,?,2 ll?AU {'9�ti)'1'.1-f,?;�U
APR-09-1999 20�20 9Bi P.03
�Rpr--09-99 20:05 � � P.04
5) Division 3.5 Building Standards
6) Division 3.6 Transpo�tation and Circulafion
7) Division 3.7 Compact Urban Growth Standards
8) Division 3;8 Supplementary Regulations
e. All sections of LUC Division 4.5 of the Land. Use Code need to be cornplied with.
2. Glen Schlueter o( the Stormwater Utility offered the following comments;
a. This site is in the McClellands/Mail Creek basin where the fees are $3,717/acre, which is
based on the amount of imperviousness. The site is als� located in inventory grid #9R.
b. The existing detention on this site does not serve this development sv the pond will need to
be enlarged to account for the additional irnperviousness created by this site.
c. There is a drainage easement along Lemay for a storm sewer and along #he north property
line of fhe site. The Building D location might be too close to that line. This sewer serves
the Courtyards at Miramont. `
d. The existing detention was sized with the old rainfafl criteria. This site might be able to use
the old criteria, as long as the model is with the new criteria to assess the impaet of that on
the site.
e. A water quality feature is required. The existing pond can be retrofitted to serve. that
purpose.
3. Tim Blandford of the Engineering DeparCment offered the following comments:
a. Street oversizing fees will apply to lhis developmeni. The streei oversizing fees wil! be as
follows�
o Multi-Family Residential -$1,021 per dweiling unit
Please contact Matt Baker for additional information regarding the actual fees related to
your proposed developrnent.
b. A Transportation Impact Sfudy (TIS) is reguired with your Froject Development Plan (PDP)
submittal, To coordinate the parameters of this study, please contact Eric Bracke, the
City's Traffic Engineer, and Kathleen Reavis, the City's Transportation Planner.
c. Categorization ot interior roadways will be based on traffic volumes per the TIS.
d. Roadway improvements to City standards along Boardwalk and Lemay are required.
e. Access points need to align with existing access points onto Boardwalk.
f. Pedestrian connection points are needed to the west and north properties.
g. The standard utility plan rnust be submitted to the Ciry forreview and approval. A
development agreement will be done for this project.
h. A development construction permit is required.
i. Coordinate all street engineering needs th�ough the En,gineering Department.
4. Kathleen Reavis of Transportatlon Planning offers the following comments`
a. A Transportation Impact Study (TIS) update is required with your submiital. Please call to
coordinate the parameters of this study.
b. All street, pedestrian and bike corridors shall be accommodated and connect fo adjacent
and proposed facilities.
5. Roger BuHington of the Water & Wastewater Utility offers the following comments:
a. Please note there may be re-pay agreement for infrastructure.
b. The water system will need to be looped with a minimum of two points.
z
APR-09-1999 20:21 98i P.04
�kpr-�9-99 20:05 P.05
,� �
c. All applicabie water rights, conservation standards; plant investment fees, et cetera apply tb
this development.
d: Coordinate infrastructure needs through the Wate� and Wastewater Utility Department.
6. Kim Kreimeyer the PVatural Resources Development Planner offers the following comments:.
a You will need #o file a fugitive dust control permit and coordinate this througti the Larimer
County Environmental Health Department. Please contact them directly.
b. Provide adequate dumpster and trash enclosure area to accommodate a reeycling
container(s}.
c. One trash hauler should be used to minimize traffic impact as well as impact on the roads.
d. Native grasses and plant materials should be used wherever appropriate and blueg�ass
should be minimized.
7. Poudre Fire Department:
a. Please contact Ron Gonzales with Poudre Fire Authority to discuss requirements.
8. Rob Irish from Light and Power offers the following comments:
a. Existing electric facilities along Lemay and Boardwalk.
b. All utilities shali be placed underground.
c. Any modi�cation of existing electrical facilities will be at the developer's expense.
d. The applicanUdeveloper shall acquire all necessary access corridors/easements..
e. The normal electric development charges will apply to this project.
f. Coordinate all utility loeations with Light and Power.
9. Janet Meisel-Burns frorn Parks and Recreation offers the following;
a. Neighborhood Park and Community Park fees will apply to this project.
b. Consider 6erming, vegetation, and wrought iron fencing to separate this site from pa�klands
to the west and north.
c. Accommodate fhe need for trail connections into che park areas.
d. Coordinate all park concerns with Parlcs and Recreatlon.
12. The Current Planning Department offers the following comments:
a. This development request will be subject to the Development Review Fee Schedule that is
available in the Current Ptanning Department office. The fees are due at the time of
submittal of the required Project Development Plan and compliance phases of the
development review by City staff and affected outside reviewing agencies.
b. This development proposal is subject to all the requirements as set forth in the City's Land
Use Cvde (LUC), specifically: Articles 2. Administration (Development Review Procedures);
Article 3. General Development Standards; and, Article 4. (Zoning] Districts (Section 4.5).
c. Section 3.5.1(A)-(H) requires all buildings to achieve a compatible design characteristic.
d. Per Section 3.5.2(C)(1) —(2) requires that multi-family entrances be orientated to an
adjacent street to the maximum extent practicable. The front fa�ade's primary entrance
needs to be connected via a walkway to a sfreet within two hundred (200) feet. Note the
private drive lanes may not suffice to meet these criteria.
3
APR-09-1999 20�21 98i P.05
�Pr-V9-99 20:06
�
�
P.06
e. Per LUC Section 3.5.2 (E) -(F) the design of the garage elevations must be sensitive to the
overall development and dormers or gables should break up the roofline. Note fhat the
backside should feature architectural details to break up long blank walls.
f. The site plan should include building envelopelfootprint dimensions and disiance to nearest
property lines.
g. Landscape and utility plans, including street tree locations shall meet spacing distances
according to Land Use Code Section 3.2.1.
h. Please address Section 4.5 Medium Density Mixed-Use Neighborhofld District (M-M-N)
since it requires adherence to specific dens'ity and block standards..
i, Show existing trees (including species and diameter) and designate whether they are to
remain or be removed.
j. A neighborhood meeting should be held for this developrnent proposal prior to formal
submittal of the request (Section 2.2.2 of fhe LUC). Please contact Ron Fuchs of this office
to assist you in the scheduling of this meeting.
k. All modifications to code standards will be reviewed by the Planning and Zoning Board.
I. The burden of demonstrating compliance with all Land Use Code eriteria is with the
applicant:
4
�
�PQ_DIQ_1 QQQ �c,:» 98X P, 06