HomeMy WebLinkAboutHEARTSIDE HILL RESIDENTIAL DEVELOPMENT - FDP230007 - SUBMITTAL DOCUMENTS - ROUND 4 - UTILITY PLANSSITE
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLCOVER SHEET8/28/23
N/A
N/A
JTC
JTC
21-1045-00
C0.00
1 27
CIVIL PLANS FOR
HEARTSIDE HILL
HEART OF THE ROCKIES THIRD SUBDIVISION
SITUATED IN THE SOUTHEAST QUARTER OF SECTION 12, TOWNSHIP 6 NORTH,RANGE 69 WEST OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE COLORADO
AUGUST 2023
PROPOSED STREET LIGHT
PROPOSED STORM SEWER
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
PROPOSED SPOT ELEVATIONEXISTING SPOT ELEVATION
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
PROPOSED ELECTRIC LINEEXISTING ELECTRIC LINE
EXISTING TELEPHONE LINE
PROPOSED FIRE HYDRANTEXISTING FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MAIN
PROPOSED WATER MAIN
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF CONSTRUCTION
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED WATER VALVE
PROPOSED MANHOLE
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
EXISTING FIBER OPTIC LINE
PROPOSED HANDICAP RAMP
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV LINE PROPOSED CABLE TV
PROPOSED WATER SERVICE W/
CURB STOP AND METER PIT
PROPOSED SANITARY SEWER SERVICE W/
CLEANOUT
EXISTING ROW
Vicinity Map
Scale: 1" = 1000'
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #24-94
ON THE NORTHEAST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND PORTNER DRIVE, ON TOP OF THE WEST END
OF A CONCRETE HEADWALL
ELEV= 4960.69
CITY OF FORT COLLINS BENCHMARK #25-94
ON THE NORTHWEST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND SOUTH LEMAY AVENUE, ON TOP OF THE
SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE
ELEV= 4913.16
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4960.69 (NAVD88 DATUM) - 3.19'
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4913.16 (NAVD88 DATUM) - 3.19'
UTILITY CONTACTS:
ABBREVIATION LIST
ABC AGGREGATE BASE COURSE
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARCH ARCHITECT
ARV AIR RELEASE VALVE
ASPH ASPHALT
A&EAE ACCESS & EMERGENCY ACCESS EASEMENT
BLDG BUILDING
BE BUILDING ENVELOPE
BFV BUTTERFLY VALVE
BOV BLOW OFF VALVE
BOS BOTTOM OF STEP
BOW BACK OF WALK
BVC BEGINNING VERTICAL CURVE
BW BOTTOM OF WALL
C&G CURB & GUTTER
CATV CABLE TELEVISION
CDOT COLORADO DEPARTMENT OF
TRANSPORTATION
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
COMM COMMUNICATION
CON CONDENSATE
CONC CONCRETE
COORD COORDINATION
DE DRAINAGE EASEMENT
D&UE DRAINAGE & UTILITY EASEMENT
D,U,AE DRAINAGE, UTILITY & ACCESS EASEMENT
DEMO DEMOLITION
DIA DIAMETER
DIP DUCTILE IRON PIPE
E EAST(ING)
EAE EMERGENCY ACCESS EASEMENT
EEA EASEMENT EXCLUSION AREA
EG EXISTING GROUND
EL ELEVATION
ELEC ELECTRIC
EM ELECTRIC METER
ENV ENVELOPE
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
ESMT EASEMENT
EST ESTIMATE(D)
EX EXISTING
EV ELECTRIC VEHICLE (CHARGING STATION)
EVC END VERTICAL CURVE
F FIRE LINE
FCLWD FORT COLLINS LOVELAND WATER DISTRICT
FDC FIRE DEPARTMENT CONNECTION
FES FLARED END SECTION
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
G GAS
GB GRADE BREAK
GF GARAGE FLOOR
GM GAS METER
GND GROUND
GV GATE VALVE
HBP HOT BITUMINOUS PAVEMENT
HH HEARTSIDE HILL
HORZ HORIZONTAL
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
HW HEADWALL
H4H HABITAT FOR HUMANITY
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LA LANDSCAPE (PLAN/ACRH)
LCUASS LARIMER COUNTY URBAN AREA STREET
STANDARDS
LF LINEAR FEET
LP LOW POINT
LT LEFT
MAX MAXIMUM
ME MATCH EXISTING
MEP MECHANICAL, ELECTRICAL, PLUMBING
ENGINEER
MH MANHOLE
MIN MINIMUM
N NORTH(ING)
NA NOT APPLICABLE
NTS NOT TO SCALE
OC ON CENTER
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
P&UE PEDESTRIAN & UTILITY EASEMENT
PE PEDESTRIAN EASEMENT
PERF PERFORATED
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCR POINT OF CURB RETURN
PH POTHOLE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PP POWER POLE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
R&R REMOVAL & REPLACEMENT
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RE REFERENCE
RG RAIN GARDEN
RJ RESTRAINT JOINT
ROW RIGHT-OF-WAY
RT RIGHT
SCH SCHEDULE
S SOUTH
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SFCSD SOUTH FORT COLLINS SANITATION DISTRICT
SRVC SERVICE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN-OUT
SSMH SANITARY SEWER MANHOLE
SSWR SANITARY SEWER
STA STATION
SWMP STORMWATER MANAGEMENT PLAN
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBV TO BE VACATED
TBR TO BE REMOVED
TELE TELEPHONE
TEMP TEMPORARY
TF TOP OF FOUNDATION
TOS TOP OF STEP
TS TOP OF SLAB
TW TOP OF WALL
TYP TYPICAL
XS CROSS SECTION
UD UNDERDRAIN
UE UTILITY EASEMENT
U&DE UTILITY & DRAINAGE EASEMENT
UGE UNDERGROUND ELECTRIC
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VIF VERIFY IN FIELD
VERT VERTICAL
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE OR WEST
WL WATERLINE
WQCE WATER QUALITY CONTROL ELEVATION
WSE WATER SURFACE ELEVATION
XFMR ELECTRIC TRANSFORMER
LIGHT & POWER
Fort Collins Light & Power
700 Wood Street
Fort Collins, Colorado 80522
Contact: Luke Unruh
Ph. 970.416.2724
STORMWATER
Fort Collins Utilities
700 Wood Street
Fort Collins, Colorado 80522
Contact: Matt Simpson
Ph. 970.221.6192
NATURAL GAS
Xcel Energy
1901 E. Horsetooth Road
Fort Collins, Colorado 80525
Contact: Stephanie Rich
Ph. 970.225.7828
TELEPHONE SERVICE
Century Link (Qwest)
3351 Eastbrook Drive
Fort Collins, Colorado 80525
Contact: Bill Johnson
Ph. 970.490.7501
CABLE SERVICE
Comcast
1201 University Dr.
Fort Collins, Colorado 80521
Contact: Don Kapperman
Ph. 970.567.0245
WATER & WASTEWATER
FCLWD/SFCSD
5150 Snead Drive
Fort Collins, Colorado 80525
Contact: Sam Lowe
Ph. 970.226.3104
DEVELOPER
CARE Housing
1303 West Swallow Rd, Bldg 11
Fort Collins, CO 80526
Ph. 970.282.7522
ENGINEER
Highland Development Services
6355 Fairgrounds Ave, Ste 100
Windsor, CO 80550
Ph. 970.674.7550
LANDSCAPE ARCHITECT
The Birdsall Group
444 Mountain Ave
Berthoud CO, 80513
Ph. 970.532.5891
SURVEYOR
Intermill Land Surveying
1301 Cleveland Ave
Loveland, CO 80537
Ph. 970.669.0516
ARCHITECT
alm2S
712 Whalers Way, Bldg B, Ste 100
Fort Collins, CO 80525
Ph. 970.223.1820
PROJECT CONTACTS:
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
INDEX OF SHEETS
Sheet No.Discipline No.Description of Sheets
1 C0.00 COVER SHEET
2 C0.01 GENERAL NOTES
3 C0.02 EXISTING CONDITIONS & DEMOLITION PLAN
4 C0.03 PHASING PLAN
5 C0.04 PHASING DETAIL
6 - 7 C1.00 - C1.01 HORIZONTAL CONTROL PLAN
8 C1.02 BRITTANY STREET STRIPING PLAN
9 C2.00 DRAINAGE PLAN
10 - 13 C2.01 - C2.04 EROSION & SEDIMENT CONTROL PLAN
14 C2.05 GRADING PLAN
15 C3.00 OVERALL UTILITY PLAN
16 - 17 C3.01 - C3.02 SANITARY SEWER PLAN & PROFILES
18 - 19 C3.03 - C3.04 STORM DRAIN PLAN & PROFILES
20 C4.00 PRELIMINARY LEMAY AVENUE STREET PLAN & PROFILE
21 - 27 C5.00 - C5.06 DETAILS
E TRILBY RDS LEMAY AVEBRIT
T
A
N
Y
S
T
AUTUMN RIDGE DRBRITTANY DRI HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY
DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS
AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM
FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD
CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE
REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL
ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS
ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE
CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE
LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED
DURING THE CONSTRUCTION PHASE.
JASON T. CLAEYS
P.E. NO. 42122
EXISTING COMMUNICATIONS VAULT
EXISTING ELECTRIC VAULT
EXISTING TRAFFIC CONTROL BOX
EXISTING STORM DRAIN MANHOLE
EXISTING TEE POST
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland Water District.
District Engineer Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the South Fort Collins Sanitation District.
District Engineer Date
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Traffic Operations,
Park Planning and Development,
Stormwater Utility,
Water & Wastewater Utility,
City Engineer,
APPROVED:
Environmental Planner,
Approved Sheets Date
APPROVED:
Approved Sheets Date
APPROVED:
Approved Sheets Date
APPROVED:
Approved Sheets Date
APPROVED:
Approved Sheets Date
APPROVED:
Approved Sheets Date
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA
STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST
RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER
THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK,
FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE
PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND
EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND
SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER.
6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO
VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE
FOR UNKNOWN UNDERGROUND UTILITIES.
7.THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING,
TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE
REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL
EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS
REQUIRED.
9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE
DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION.
10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND
WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL
AS THE UTILITY COMPANIES.
11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A
MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO
COMMENCEMENT OF ANY WORK.
12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE
CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY.
14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER,
CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY
CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN.
16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL
BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17.PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE
STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY
FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY
BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM
GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN
ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR HEARTSIDE HILL BY HIGHLAND DEVELOPMENT SERVICES SHALL BE FOLLOWED
AND IMPLEMENTED.
20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD
REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING.
21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24
HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF
APPLICABLE.
23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY
THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO
THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF
CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE
IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO
THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL
REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS
SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED
TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE
LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.
25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS,
INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO
THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT
WILL BE ALLOWED ON THE STREETS.
26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF
THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO
REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS.
27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE
DISTRICTS.
28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD
AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING
A PERMIT.
30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA
PUBLICATION 2226, EXCAVATING AND TRENCHING.
31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE),
FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL
DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES.
32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT,
WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE
CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET
OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR
HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED
TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE.
36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND
ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF
ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER
SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S
INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40.PROJECT BENCHMARKS:
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #24-94
ON THE NORTHEAST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND PORTNER DRIVE, ON TOP OF THE WEST END OF A CONCRETE HEADWALL
ELEV= 4960.69
CITY OF FORT COLLINS BENCHMARK #25-94
ON THE NORTHEWEST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND SOUTH LEMAY AVENUE, ON TOP OF THE SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE
ELEV= 4913.16
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM
(PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4960.69 (NAVD88 DATUM) - 3.19
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4913.16 (NAVD88 DATUM) - 3.19
HORIZONTAL DATUM: COLORADO STATE PLAN COORDINATES NAD 83(2007) DATUM. HORIZONTAL CONTROL BASED VRS.
41.ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED.
42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND
IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS
OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE
DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS.
THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE
CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE
LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE
GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS.
46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM
PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE
FOLLOWING PRIVATE STREETS: NO PRIVATE STREET PROPOSED.
48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: N/A
CITY OF FORT COLLINS CONSTRUCTION NOTES
A.STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
GENERAL EROSION CONTROL REQUIREMENTS
THESE NOTES ARE A SUMMARY FOR THE LEGAL REQUIREMENTS, THAT ARE SET FORTH IN THE FORT COLLINS STORMWATER CRITERIA MANUAL (FCSCM), AND THAT ANY CONFLICT IS RESOLVED BY THE
MORE STRINGENT REQUIREMENT CONTROLLING.
1.THE PROPERTY OWNER, OWNER'S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER
REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO
IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE
PROJECT SITE AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE
USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT.
2.THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT,
THE EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT.
3.THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE
CONSTRUCTION SITE.
4.THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW
ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM
SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT
DEMOLITION, CLEARING, GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES
COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS.
5.THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT
LIMITED TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR
REPLACEMENT IN THE COURSE OF CONSTRUCTION.
6.AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY
REMOVED IN ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH
THIS PROJECT.
7.ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING.
8.AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT
IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF
CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER
SHALL INSURE THAT ALL EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE
SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY.
9.ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE
EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE, AND
FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL
OF THESE AFOREMENTIONED LAWS AND REGULATIONS.
10.THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER
ACT, ARMY CORPS OF ENGINEERS' 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE
AVAILABLE UPON REQUEST BY THE CITY.
11.THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF
THE CONTROL MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES.
12.THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE
CONDITIONS AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY
EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS.
13.ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL.
14.THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY.
15.AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES,
A VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL.
16.INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN
24 HOURS FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR.
17.ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO
ANY DRAINAGE WAY.
18.ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE
ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE
SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC.
19.ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND
ACCEPTANCE BY THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES' DETAILS SHALL BE SUBMITTED, REVIEWED
AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND
HYDROLOGICAL PRACTICES
LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS
20.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY.
DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION.
21.PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A
WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE
SCHEDULE ON STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS
POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE.
22.ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING
THE SITE.
23.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY
EQUIPMENT TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED.
24.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING,
AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL
STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT
OF THE PROJECT. ALL OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE
MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED.
25.ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL
MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION
CONTROL REPORT.
26.ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL
MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY
CLEANED OUT.
27.ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF
CONTROL MEASURES.
28.ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM
OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL.
29.ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL
MEASURES.
30.NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT
EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY
HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN
SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR PERMANENT EROSION CONTROL
CAN BE PERFORMED.
31.ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE
CASES WHERE HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT
DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER CLARIFICATION.
VEHICLE TRACKING
32.AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST
ONE STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE
VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES).
33.IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS
LOCATED NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM.
34.CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE.
CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF
SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND
LEGALLY DISPOSED OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE
PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE).
35.IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR.
LOADING AND UNLOADING OPERATIONS
36.THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE
WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD
IMPACT WATER QUALITY.
OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS
37.ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL
GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS.
38.ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS,
SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE
(VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH
SPOTS OR ON PALLETS), COVERED (PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY CONTAINMENT OR OTHER
CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND
SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS.
VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING
39.PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL
BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE
ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE.
SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS
40.THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT
IN FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE
IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS
DETERMINED BY ANY CITY INSPECTORS.
CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT
41.ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE
LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE
INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL
MEASURE IS TO OCCUR, A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY CLEANED OUT.
42.THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER
ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS.
DEDICATED ASPHALT AND CONCRETE BATCH PLANTS
43.DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO
REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM
THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO BE USED ON SITE.
CONCRETE SAW CUTTING MATERIALS
44.SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM
LEAVING THE IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL.
WASTE MATERIALS STORAGE AND SANITARY FACILITIES
45.TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE
WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER,
LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS
REQUIRED TO PRACTICE GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS.
46.SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED
AS FAR AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS
OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS.
OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS
47.SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE'S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER
CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE
CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH
LARIMER COUNTY SHERIFF DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED
TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY.
48.SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE
ENTRAPMENT ISSUES.
FINAL STABILIZATION AND PROJECT COMPLETION
49.ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE
TURNING THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY.
50.ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
51.ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL
GRADING.
52.SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF
THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE.
53.ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS REQUIREMENTS.
54.ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND
SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL
SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING AND TACKIFICATION.
55.ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED
MULCH OR TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF
EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE
STEEP SLOPES. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL,
TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED.
56.THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN
ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
57.THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES
MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE
DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED
STABILIZED AND VERIFIED BY CITY EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER
FINAL STABILIZATION IS ACHIEVED.
58.THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED
AND 2) ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED
COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES.
B.STREET IMPROVEMENT NOTES
1.ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE.
2.A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET
CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO
PLACEMENT OF ANY ASPHALT.
3.WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN
CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE
ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER.
4.STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED
AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5.FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED.
6.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE
DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED
PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK
SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK.
7.ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE
RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8.THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE
THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9.PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS
PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE
MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES
INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS
EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING
SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PREFORMED IN THE PRESENCE OF AN INSPECTOR.
C.TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1.ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE.
2.ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC.
3.ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD.
4.ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS.
5.ALL LANE LINES SHALL BE LATEX PAINT.
6.PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR
PLACEMENT SHALL BE APPROVED BY THE LOCAL TRAFFIC ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7.PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS.
8.LATEX PAINT APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS.
10.ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS.
11.A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE
CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN.
12.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES.
13.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN.
14.SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE
RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE
MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR
ON TRAFFIC MARKINGS).
15.SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL.
16.CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS IN CONSTRUCTION AREA. CONTRACTOR MAY KEEP THE SIGNS, OR CALL THE CITY TRAFFIC
DIVISION TO HAVE THEM REMOVED.
17.NO "RESET" ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS WILL BE ACCEPTED.
18.ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS SHALL BE NEW AND BE CONSISTENT WITH THE LCUASS CRITERIA.
D.STORM DRAINAGE NOTES
1.THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES
SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
2.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR HEARTSIDE HILL BY HIGHLAND DEVELOPMENT SERVICES, SHALL BE FOLLOWED
AND IMPLEMENTED.
3.SEE CITY OF FORT COLLINS STORMWATER CRITERIA MANUAL - APPENDIX F CONSTRUCTION CONTROL MEASURES STANDARD NOTES AND STANDARD EROSION CONTROL NOTES.
FORT COLLINS - LOVELAND WATER DISTRICT AND SOUTH FORT COLLINS SANITATION DISTRICT NOTES
1.ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE FORT COLLINS - LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION DISTRICT
STANDARDS AND SPECIFICATIONS.
2.CONSTRUCTION OF WATER AND SEWER FACILITIES REQUIRE A PRECON MEETING WITH DISTRICT OPERATIONS STAFF PRIOR TO CONSTRUCTION.
3.CONTRACTOR SHALL NOTIFY DISTRICT INSPECTORS PRIOR TO STARTING WORK.
4.CONTRACTOR SHALL CONTACT THE SANITATION DISTRICT FOR SEWER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING SEWER STUBS.
5.ALL COMMERCIAL DOMESTIC SERVICES REQUIRE A REDUCED PRESSURE BACKFLOW PREVENTION DEVICE.
6.ALL WATER LINES SHALL BE A MINIMUM OF (5) FIVE FEET AND A MAXIMUM OF (6) SIX FEET BELOW FINAL GRADE.
7.ALL DISTRICT VALVES SHALL ONLY BE OPERATED BY DISTRICT OPERATIONS STAFF.
8.PIPE PRESSURE AND VACUUM TESTING SHALL BE WITNESSED BY DISTRICT INSPECTORS. WATERLINE BACTERIA TESTS SHALL ALSO BE TAKEN BY DISTRICT INSPECTORS.
9.ONCE THE SYSTEM IS OPERATIONAL AND ALL TESTS HAVE PASSED, CONTRACTOR SHALL REQUEST SUBSTANTIAL COMPLETION WITH A LETTER TO THE DISTRICT THAT INCLUDES THE DOLLAR VALUE OF
THE WATER AND SEWER IMPROVEMENTS LISTED SEPARATELY.
10.AS-BUILTS SHALL BE SUBMITTED IN PDF AND DWG TO THE DISTRICT FOR SUBSTANTIAL COMPLETION.
11.IF GROUNDWATER IS ENCOUNTERED WITHIN THE DEPTH OF SEWER CONSTRUCTION, MANHOLES MUST BE WATER-PROOFED.
12.A REDUCED PRESSURE PRINCIPLE BACK-FLOW-PREVENTION-DEVICE (BFPD) IS REQUIRED ON THE FIRE LINE AND THE DOMESTIC WATER SERVICE LINE.
13.TREES AND OTHER LANDSCAPING ARE NOT ALLOWED WITHIN 10 FEET OF DISTRICT FACILITIES.
14.CONTRACTOR SHALL CONTACT THE WATER DISTRICT FOR WATER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING INFRASTRUCTURE.
15.ONCE ALL PUNCH LIST ITEMS ARE COMPLETE, EASEMENTS ARE RECORDED, AND AS-BUILT FILES ARE APPROVED, THE CONTRACTOR SHALL REQUEST FINAL COMPLETION WITH A LETTER TO THE
DISTRICT THAT INCLUDES THE DOLLAR VALUE OF THE WATER AND SEWER IMPROVEMENTS LISTED SEPARATELY.
CITY OF FORT COLLINS GENERAL NOTES
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLGENERAL NOTES8/28/23
N/A
N/A
ZMW
JTC
21-1045-00
C0.01
2 27
LOT 2
363,964 sq.ft.±
8.35 acres±
BLOCK 1
Heart of the Rockies
Second Subdivision
LOT 1
105,661 sq. ft.±
2.43 acres±
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEREVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEXISTING CONDITIONS & DEMOLITION PLAN8/28/23
1" = 40'
N/A
JTC
JTC
21-1045-00
C0.02
3 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
N
W E
S
0
SCALE: 1" = 40'
80402040
APPROX LIMITS OF SAWCUT LINE
DEMO UTILITIES / FENCE / ETC
DEMO STRUCTURE/UTILITY/
LIGHT/ ETC
DEMO ASPHALT / CONCRETE
TREE REMOVAL/RELOCATION
(RE: LA)
PROTECT EXISTING TREE
(RE: LA)
LEGEND
NOTES:
1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION
OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS.
THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN
THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION
AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK.
THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING
UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER
AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS
SHOWN.
2.COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS,
PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND
RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOTION OF PAVING,
TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED.
3.ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
4.CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE
SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK.
REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT
CONTRACTOR EXPENSE.
5.EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO
EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT.
6.CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING
CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING
INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION
SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND
IS ADEQUATELY VEGETATED.
7.LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF
REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED
IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS.
ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR
EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS
STANDARDS.
8.REFER TO LANDSCAPE TREE MITIGATION PLAN (IF APPLICABLE) FOR TREE REMOVAL,
RELOCATION AND PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR
COORDINATION PURPOSES ONLY.
9.REFERENCE LANDSCAPE PLANS FOR ADDITIONAL SITE DEMOLITION.
10.ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
TREE PROTECTION NOTES:
1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL
AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS
FOR REMOVAL.
2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL
OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED
AND APPROVED THE DISTURBANCE.
3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY
STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT
HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL
PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM
OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET
FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL
BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE
FENCED TREE PROTECTION ZONE.
5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE
CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE
MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY
OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED
TREE OR GROUP OF TREES.
6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY
PROTECTED TREE.
7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM
CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY
EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING
AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE
ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART
AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF
SUCH AREAS BEING CLEARED.
8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE
REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY
BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF
TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE
TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED
IN THE CHART BELOW:
9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO
JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST
COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT
SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS
ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL
REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL
AND CONSTRUCTION APPLY.
TREE DIAMETER AT BREAST HEIGHT
(INCHES)
AUGER DISTANCE FROM FACE OF TREE
(FEET)
0 - 2 1
3 - 4 2
5 - 9 5
10 - 14 10
15 - 19 12
OVER 19 15
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETPOND D
LOT 1
HEART OF THE ROCKIES 2ND
BLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
BLDG 1
(TYPE B, RE: ARCH)
BLDG 3
(TYPE A, RE: ARCH)BLDG 4
(TYPE B, RE: ARCH)BLDG 5
(TYPE C, RE: ARCH)
BLDG 6
(TYPE A, RE: ARCH)
BLOCK 3
LOT 1
TRACT A
BLDG 2
(TYPE C, RE: ARCH)BUCHANANSTREETEDGEWARESTREETC
O
U
R
T
E
N
A
Y
C
I
R
C
L
E
WESTBOURN
CIRCLE REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLPHASING PLAN8/28/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C0.03
4 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
N
W E
S
0
SCALE: 1" = 40'
80402040
PHASE 1
PHASE 2
PHASE 4
PHASE 3
LEGEND
NOTES:
1.PHASES MAY BE COMBINED SEQUENTIALLY AS
NECESSARY
2.ALL OVERLOT GRADING & UTILITY INSTALLATION
(WATER/SEWER/STORM) WILL BE OCCUR IN PHASE 1
3.COMPLETION OF PARK IMPROVEMENTS ANTICIPATE
TO OCCUR AS SOON AS POSSIBLE AND PRIOR TO THE
ISSUANCE OF THE LAST APARTMENT BUILDING
CERTIFICATE OF OCCUPANCY.
4.CHURCH MODULAR REMOVAL WILL OCCUR WITH
PHASE 4
5.MODIFICATION OF NW RAIN GARDEN OUTFALL WILL
OCCUR WITH PHASE 4
6.PHASE 4 IS ANTICIPATED TO COINCIDE WITH FUTURE
COMMUNITY CENTER
7.RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION
OF CONSTRUCTION ACTIVITIES AND CONCURRENT
WITH LANDSCAPE INSTALLATION. PLACE NECESSARY
EROSION CONTROL PROTECTION TO MINIMIZE RISK OF
NATIVE SOILS MIGRATING TO THE RAIN GARDEN
GROWING MEDIA. THE RAIN GARDEN GRADING MAY
BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE
INSTALLATION OF THE DRAINAGE COURSE AND
GROWING MEDIA.
RAIN GARDEN OS1
BRITTANY STREET
LOT 1
HEART OF THE ROCKIES 2ND
BLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
TRACT A
RAIN GARDEN OS1
BRITTANY STREET
LOT 1
HEART OF THE ROCKIES 2ND
BLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
TRACT A REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLPHASING DETAIL8/28/23
1" = 20'
N/A
JTC
JTC
21-1045-00
C0.04
5 27
INTERIM CONDITION
ULTIMATE CONDITION
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
N
W E
S
0
SCALE: 1" = 20'
40201020
NOTE:
1.SEE SHEETS 10 - 13 FOR APPLICABLE EROSION CONTROL MEASURES & NOTES
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETPOND D
LOT 1
HEART OF THE ROCKIES 2ND
BLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
BLDG 1
(TYPE B, RE: ARCH)
BLDG 3
(TYPE A, RE: ARCH)BLDG 4
(TYPE B, RE: ARCH)BLDG 5
(TYPE C, RE: ARCH)
BLDG 6
(TYPE A, RE: ARCH)
BLOCK 3
LOT 1
TRACT A
BLDG 2
(TYPE C, RE: ARCH)BUCHANANSTREETEDGEWARESTREETC
O
U
R
T
E
N
A
Y
C
I
R
C
L
E
WESTBOURN
CIRCLE
AREA RESERVED
FOR STORMWATER
FACILITIES
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLHORIZONTAL CONTROL PLAN8/28/23
1" = 40'
N/A
JTC
JTC
21-1045-00
C1.00
6 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
CONCRETE SIDEWALK
CONCRETE PAVEMENT
HEAVY DUTY ASPHALT PAVEMENT
LIGHT DUTY ASPHALT PAVEMENT
NOTES:
1.ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY
BUILDING PLAN DIMENSIONS PRIOR TO CONSTRUCTION.
2.CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET
RIGHT-OF-WAY WORK.
3.TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE
RIGHT-OF-WAY WORK, ARE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
4.ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL
REPORT FOR THE SITE.
5.ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET
STANDARDS.
6.COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES
WITH LANDSCAPE ARCHITECT.
7.DURING SIDEWALK INSTALLATION ALONG BRITTANY DRIVE, PLEASE
HYDRO_EXCAVATE/POTHOLE SIDEWALK EDGE CLOSEST TO EXISTING TREES.
HYDRO_EXCAVATION SHALL BE USED TO DETERMINE WHAT, IF ANY, SIGNIFICANT
ROOTS MAY BE IN CONFLICT WITH THE NEW SIDEWALK. PLEASE CONTACT CITY
FORESTRY (FORESTRY@FCGOV.COM) PRIOR TO HYDRO_EXCAVATION AND AFTER
WORK IS COMPLETED TO REVIEW CRITICAL ROOT ZONE AREA. ANY ROOTS EQUAL
TO OR GREATER THAN 2 INCHES IN DIAMETER SHALL BE PRESERVED AND
PROTECTED TO THE EXTENT FEASIBLE. CUTTING OF ANY ROOTS 2 INCHES IN
DIAMETER AND GREATER, THEY MUST BE APPROVED BY CITY FORESTRY.
STOP
ONLY
STOP
EV INSTALLED
N
W E
S
0
SCALE: 1" = 40'
80402040
LEGEND
EV READY
EV CAPABLE
4" MOUNTABLE CURB W/ 1' SPILL GUTTER
6" VERTICAL CURB W/ 1' SPILL GUTTER
6" VERTICAL CURB W/ 1' CATCH GUTTER
6" VERTICAL CURB W/ 2' CATCH GUTTER
12" FLUSH CONCRETE CURB
2.0' CURB TRANSITION
CURB RAMP
2.0' SOFT PAN
1.0' CONCRETE PAN (TYP)
4.0' CONCRETE PAN (TYP)
6.0' CONCRETE PAN
APPROXIMATE SAW CUT
INSTALLED EV CHARGING STATION (RE: ELEC)
EV PEDESTAL MOUNT CURB (TYP)
WHEEL STOPS (TYP)
TRASH ENCLOSURE (RE: ARCH)
BIKE RACK (RE: LA)
BIKE SHELTER (RE: LA)
PARK AMENITY (RE: LA)
P
FIRE LANE
RESERVED
PARKING
VAN
ACCESSIBLE
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLHORIZONTAL CONTROL PLAN8/28/23
N/A
N/A
JTC
JTC
21-1045-00
C1.01
7 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
STOP
BRITTA
N
Y
S
T
R
E
E
T
BLOCK 1
LOT 1
LOT 2 LOT 3
LOT 4
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7BLOCK 2BUCHANANSTREETMATCHLINESEE ABOVELEMAY AVENUEEDGEWARESTREETCOURTENAYCIRCLEBRITTANY STREET
MATCHLINESEE ABOVEMATCHLINESEE BELOWWESTBOURNCIRCLEMATCHLINESEE BELOWBRITTANY STREET
TRILBY ROADLINE TABLE
LINE LENGTH DIRECTION START (N,E)
CURVE TABLE
CURVE LENGTH RADIUS DELTA CHORD DIRECTION CHORD LENGTH START (N,E)
NOTES:
1.ALL LONGITUDINAL PAVEMENT MARKINGS TO BE DONE IN LATEX
PAVEMENT MARKING PAINT. ALL TRANSVERSE PAVEMENT MARKINGS AND
SYMBOLS TO BE DONE IN PREFORMED THERMOPLASTIC.
2.DIMENSIONS SHOWN FOR STRIPING ARE FROM CENTER OF STRIPE TO
CENTER OF STRIPE OR FROM CENTER OF STRIPE TO FLOWLINE OF CURB.
3.ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF
FORT COLLINS AND/OR MUTCD STANDARDS.
4.THERMOPLASTIC ARROWS SHALL BE 12' ELONGATED FHWA.
5.THERMOPLASTIC BIKE STENCILS SHALL BE 6'-6" W/ 6' ARROW.
6.ALL SIGNS PLACED IN HARDSCAPE SHALL HAVE A SLEEVE INSTALLED.
7.RESTRIPE AREAS OF PAVEMENT REPLACEMENT AS NECCESSARY.REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLBRITTANY STREET STRIPING PLAN8/28/23
1" = 20'
N/A
ZMW
JTC
21-1045-00
C1.02
8 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
0
SCALE: 1" = 20'
40201020
N
W
E
S
N
W E
SNWES
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETBRITTANY KNOLLS
BRITTANY KNOLLS
PARAGON POINTBLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
BLOCK 3
LOT 1
TRACT A
BLDG 1
BLDG 2 BLDG 3
BLDG 4
BLDG 5 BLDG 6
DETENTION POND D
100 YR PEAK INFLOW = 44.16 CFS
100 YR RELEASE RATE = 13.2 CFS
100-YR VOLUME = 0.90 AC-FT
100-YR WSE = 4911.03 FT
WQCV (40-HR) = 0.08 AC-FT
WQCV WSE = 4908.85 FT
(STANDARD WQ - AREA NOT
TREATED BY LID)
RAIN GARDEN D1
WQCV (12-HR) = 2,914 CU-FT
RAIN GARDEN OS1
WQCV (12-HR) = 1,845 CU-FT AREA RESERVED
FOR STORMWATER
FACILITIES
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLDRAINAGE PLAN8/28/23
1" = 40'
N/A
JTC
JTC
21-1045-00
C2.00
9 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
N
W E
S
0
SCALE: 1" = 40'
80402040
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY
EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT
CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT
ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION
AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN
PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED
GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE
OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION
BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE
EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY
SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM
WATERWAY POLLUTION.
3.LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL
BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS
NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL
DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED,
SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL
AND SOIL MIGRATION.
4.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND
SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION
COMMENCEMENT.
5.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND
DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND
NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND
MULCHED PER LCUASS STANDARDS.
6.ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES
OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO
ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE
RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE
SOIL.
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 1 - GRADING8/28/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.01
10 27
0
40'
80402040
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL
MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION
SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION
PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER
POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED
TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR
THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED
CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH,
VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN
AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND
DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED
TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH,
LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE
STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND
DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST
IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING
DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED
AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT
AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR
INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED
ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND
LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES
SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING,
WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER
30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS
OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY
INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE
CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION
CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE
UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY
VEGETATED WITH APPROVAL FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND
THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY
SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL
MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED
AND/OR NOT DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE
TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS
SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY
THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY
DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT
LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION
SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION
RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING
SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE
THE SOIL.
PHASE 1 - GRADING PHASE NOTES
1.THIS PLAN IS A LIVING DOCUMENT THAT MAY CHANGE AS WORK PROGRESSES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING THESE EROSION CONTROL
PLANS AS NEEDED DURING CONSTRUCTION ACTIVITIES TO REFLECT ACTUAL BMPS
USED ONSITE, REASONS FOR CHANGES AND ANY DISTURBED AREAS.
2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO
INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION AND
TEMPORARY SEEDING.
3.THE CONTRACTOR MAY USE SUCH BMPS AS SILT FENCE OR COMPACTED EARTH
BERM AS FORMAL CONSTRUCTION MARKER PERIMETER CONTROL AS APPROVED BY
THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.ALL ONSITE AND OFFSITE DRAINAGE PATTERNS ARE TO BE VERIFIED IN THE FIELD.
PROVIDE ALL NECESSARY BMPS TO PROTECT IMMEDIATE DOWNSTREAM INLETS,
CULVERTS, DRAINAGE WAYS, ETC.
5.OFFSITE INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET
PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH
CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
6.ALL PERIMETER CONTROL BMPS SHALL INSTALLED IN PHASE 1. CONTRACTOR SHALL
NOT PROCEED WITH CONSTRUCTION ACTIVITIES UNTIL ALL PHASE 1 BMPS ARE
INSTALLED, INSPECTED, AND APPROVED BY THE CITY OF FORT COLLINS EROSION
CONTROL INSPECTOR.
7.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD
AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE
CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER
MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE
CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
CONSTRUCTION FENCE
CULVERT PROTECTION
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 2 - INFRASTRUCTURE8/28/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.02
11 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING
ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION
CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS
UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL
REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL
(E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL
LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN
FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE
INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH
RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL
STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE
ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE
REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF
SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE.
ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY
THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE
CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT
SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT
DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT
DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST
EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY
ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE
FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
PHASE 2 - INFRASTRUCTURE PHASE NOTES
1.CONTRACTOR SHALL GRADE AND INSTALL SEDIMENT BASINS BEFORE PROCEEDING
WITH ANY PHASE 2 INFRASTRUCTURE CONSTRUCTION ACTIVITIES.
2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO
INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION, TEMPORARY
SEEDING AND MULCHING.
3.ONSITE & OFFSITE INLET PROTECTIONS SHALL BE COMPLETED PROTECTED BY CURB
INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN
CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY
THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.INFILTRATION GALLERIES TO BE CONSTRUCTED CONCURRENT WITH STORM SYSTEM
INFRASTRUCTURE. CONSTRUCT TEMPORARY SEDIMENT BASIN AROUND OUTLET
STRUCTURE. SEDIMENT SHALL BE REMOVED FROM INFILTRATION GALLERY ONCE SITE IS
STABILIZED.
5.RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES
AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION
CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN
GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A
SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND
GROWING MEDIA.
6.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD
AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE
CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER
MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE
BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 3 - VERTICAL CONSTRUCTION8/28/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.03
12 27
PHASE 3 - VERTICAL CONSTRUCTION PHASE NOTES
1.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL
BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT
LIMITED TO INLET PROTECTION, SEDIMENT BASINS, PROTECTION, AND
TEMPORARY SEEDING.
2.ANY COMMISSIONED STORM SEWER SYSTEM SHALL INLET AND OUTLET
PROTECTION INSTALLED FOR ALL PHASE 3 OPERATIONS.
3.INLET PROTECTION SHALL BE COMPLETED BY CURB INLET OR DROP INLET
PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH
CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF
FORT COLLINS EROSION CONTROL INSPECTOR.
4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF
PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION.
5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED
LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS EROSION
CONTROL INSPECTOR.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING
ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION
CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS
UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL
REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL
(E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL
LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN
FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE
INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH
RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL
STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE
ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE
REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF
SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE.
ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY
THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE
CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT
SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT
DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT
DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST
EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY
ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE
FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 4 - PERMANENT BMP & FINAL STABILIZATION8/28/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.04
13 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT
LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES
MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS
INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION
CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE.
REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY
INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION
BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT
STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE
THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION
CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION
ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES
SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT
PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND
REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14
DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL
BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE
THEIR RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND
PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE
SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY
OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT
DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL
PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA.
EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS
NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE
OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION
CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS
NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON
THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO
AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS
SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE
BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING,
ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND
MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE
SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION
RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON
SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL.
PHASE 4 - PERMANENT BMP AND FINAL STABILIZATION NOTES
1.LOTS AND BLOCKS ANTICIPATING CONSTRUCTION MAY UTILIZE SLOPE PROTECTION IN LIEU
OF TEMPORARY SEEDING AND MULCHING AS APPROVED BY THE CITY OF FORT COLLINS
EROSION CONTROL INSPECTOR.
2.INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION
WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR
OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL
INSPECTOR.
3.CONTRACTOR SHALL REMOVE ALL TEMPORARY BMPS PRIOR TO FINAL DEMOBILIZATION
OR AS DIRECTED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF
PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION.
5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING AS
APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
6.CONTRACTOR TO INSTALL PROPOSED PERMANENT OUTLET PROTECTION WHEN FINALIZING
STORM SEWER CONSTRUCTION WHICH MAY HAVE OCCURRED IN EARLIER PHASES.
7.CONTRACTOR TO CLEAN AND LEGALLY DISPOSE OF ALL SEDIMENT COLLECTED ONSITE
DURING CONSTRUCTION PRIOR TO FINAL ACCEPTANCE.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
NA GREEN VMAX C350
PROPEX PYRAMAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
SEEDING, MULCHING & CRIMPING
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
BLDG 1
BLDG 2 BLDG 3
BLDG 4
BLDG 5 BLDG 6
TRILBY ROAD LEMAY AVENUEBRITTANY STREETWESTBOURN
CIRCLE
BLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
TRACT A
POND D
BRI
T
T
A
N
Y
S
T
R
E
E
T
AREA RESERVED
FOR STORMWATER
FACILITIES
LOT 4
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLGRADING PLAN8/28/23
VARIES
N/A
ZMW
JTC
21-1045-00
C2.05
14 27
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NOTES:
1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE
MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM
THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS
SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR
STORM ELEVATION OF ADJACENT STREETS, CHANNELS,
DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES.
MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR
WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES,
OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL
GRADING PLAN ARE TO BE SHOWN.
2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY
EROSION CONTROL MEASURES PRIOR TO AND
THROUGHOUT CONSTRUCTION.
3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF
WALK UNLESS OTHERWISE LABELED.
4.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR
TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE
SHOWN ON THE HIGH SIDE OF THE WALK.
5.ALL SUBGRADE TO BE PLACED/COMPACTED PER
GEOTECHNICAL ENGINEER RECOMMENDATIONS.
6.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT
ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY
OF FT. COLLINS BUILDING DIVISION.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
LIMITS OF 18" FOUNDATION
STEM WALL (RE: STRUCT)
0
SCALE: 1" = 40'
80402040
N
W E
S
N
W E
S
SCALE: 1" = 20'
N
W E
S
SCALE: 1" = 20'
WATERLINE FITTING TABLE
FITTING DESCRIPTION GND ELEV NORTHING EASTING
WATERLINE FITTING TABLE
FITTING DESCRIPTION GND ELEV NORTHING EASTING
WATERLINE FITTING TABLE
FITTING DESCRIPTION GND ELEV NORTHING EASTING
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON
NYLOPLAST
HEART OF THE ROCKIES 2ND
LOT 1
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETBLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2 LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
BLDG 1
BLDG 3
BLDG 4
BLDG 5
BLDG 6
BLOCK 3
LOT 1
TRACT A
BLDG 2
SD-01
SEE SHEET 18
SD-02
SEE SHEET 18
SD-03
SEE SHEET 19
SD-10
SEE SHEET 19
SD-11
SEE SHEET 19
ADDITIONAL ESMT
DEDICATED FOR
FUTURE UTILITY
RELOCATION
AREA RESERVED
FOR STORMWATER
FACILITIES
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLOVERALL UTILITY PLAN8/28/23
1" = 40'
N/A
JTC
JTC
21-1045-00
C3.00
15 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
N
W E
S
0
SCALE: 1" = 40'
80402040
NOTES:
1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND
DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD
MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON
THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE,
THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN
THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE
FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH
MIGHT OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE
ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE
UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR
TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN
THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE
REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING
DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION, AND FOR
RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR
SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE
RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE
CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS
COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING
NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE
COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY
CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT
LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE
UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG).
2.IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL
MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND
WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET
FORTH IN THE FCLWD/SFCSD STANDARDS.
3.IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS,
THE MOST RESTRICTIVE STANDARD SHALL APPLY.
4.ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE
(DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL HAVE TRACER WIRE
PER STANDARDS. ALL FITTINGS SHALL BE FULLY RESTRAINED JOINTS PER FCLWD
STANDARDS (MEGA-LUG OR APPROVED EQUAL).
5.ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER.
6.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING
CONNECTION ELEVATION (RE: MEP).
7.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT
SHALL BE TRAFFIC RATED CLEANOUTS.
8.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
9.SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH
BUILDING CONTRACTOR.
10.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE
CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
11.STORM PIPES SHALL BE ADS HP STORM PIPE UNLESS OTHERWISE NOTED.
12.SEE GRADING PLAN (SHEET 14) FOR INLET GRATE AND CULVERT INVERT ELEVATIONS.
13.COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING,
RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT,
AND OWNER.
14.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE.
CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
15.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS.
16.ELECTRIC SERVICE CONDUIT AND CONDUCTOR SHALL BE INSTALLED, OWNED, AND
MAINTAINED BY THE OWNER.
17.THE PROJECT GEOTECHNICAL ENGINEER OBSERVED VARIABLE GROUNDWATER
LEVELS THROUGHOUT THE SITE. IT IS LIKELY THAT GROUND WATER WILL BE
ENCOUNTERED DURING UTILITY INSTALLATION AND THE CONTRACTOR WILL NEED TO
ACCOMMODATE AS NEEDED.
BLOCK 1
LOT 1
LOT 2
LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4
LOT 5
LOT 6 LOT 7BLOCK 2
TRACT A
BRITTANY STREET
LEMAY
AVENUE
SSWR-01 PROFILE
4900
4905
4910
4915
4920
4925
4930
4935
4940
9+009+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+00 REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSANITARY SEWER PLAN & PROFILESSSWR-018/28/23
1" = 40'
1" = 4'
ZMW
JTC
21-1045-00
C3.01
16 27
N
W
E
S
SSWR-02
SEE SHEET 17
KEY MAP
NTS
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETCALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
SSWR-01
NOTES:
1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY
BUILDING CONNECTION ELEVATION (RE: MEP).
2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL
ELEVATIONS PRIOR TO INSTALLATION.
5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE.
6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF
INTERVALS ON WATERLINES CONSISTING OF COMPACTED CLAY MATERIAL
EXTENDING 12" ABOVE THE TOP OF THE PIPE.
0
SCALE: 1" = 40'
80402040
HORIZONTAL
VERTICAL
SCALE: 1" =4'
SSWR-02 PROFILE
4900
4905
4910
4915
4920
4925
4930
4935
4940
4945
4950
4900
4905
4910
4915
4920
4925
4930
4935
4940
4945
4950
9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+50
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON NYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRONNYLOPLAST
DDONOTPOLLUTE
RAINSTOWATERWAYS
DUCTILEIRON NYLOPLAST
BLDG 1 BLDG 3
BLDG 4
BLDG 5 BLDG 6
BLOCK 3
LOT 1
BLDG 2
TRACT A
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSANITARY SEWER PLAN & PROFILESSSWR-028/28/23
1" = 40'
1" = 4'
ZMW
JTC
21-1045-00
C3.02
17 27
N
W E
S
KEY MAP
NTS
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETCALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
SSWR-02
NOTES:
1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY
BUILDING CONNECTION ELEVATION (RE: MEP).
2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE
PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS.
3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE.
4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL
ELEVATIONS PRIOR TO INSTALLATION.
5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE.
6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF
INTERVALS ON WATERLINES CONSISTING OF COMPACTED CLAY MATERIAL
EXTENDING 12" ABOVE THE TOP OF THE PIPE.
0
SCALE: 1" = 40'
80402040
HORIZONTAL
VERTICAL
SCALE: 1" =4'
SD-01 PROFILE
4905
4910
4915
4920
4905
4910
4915
4920
9+5010+0010+5011+0011+5012+00
SD-02 PROFILE
4925
4930
4935
4925
4930
4935
9+5010+0010+5011+0011+50 REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSTORM DRAIN PLAN & PROFILESSD-01, SD-02, SD-038/28/23
1" = 20'
1" = 2'
ZMW
JTC
21-1045-00
C3.03
18 27NWESN
W E
S
KEY MAP
NTS
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETSD-01
SD-02
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
NOTES:
1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH
THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED.
3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE.
CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS.
5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED
EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC.
6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS
CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE
SPRINGLINE OF THE PIPE.
0
SCALE: 1" = 20'
40201020
HORIZONTAL
VERTICAL
SCALE: 1" =2'
SD-02
SD-01
EAST RG UD
EAST RG UD
N
W E
S
SD-10 PROFILE
4910
4915
4920
4910
4915
4920
9+7510+0010+5010+75
SD-11 PROFILE
4910
4915
4920
4910
4915
4920
9+5010+0010+5011+00
SD-03 PROFILE
4925
4930
4935
4925
4930
4935
9+7510+0010+5011+0011+5011+60 REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSTORM DRAIN PLAN & PROFILESSD-10 & SD-118/28/23
1" = 20'
1" = 2'
ZMW
JTC
21-1045-00
C3.04
19 27
N
W E
S
KEY MAP
NTS
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETSD-11
SD-10
N
WE
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
SD-11
SEE SHEET 19
NOTES:
1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH
THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS.
2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED.
3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE.
CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION.
4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS.
5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED
EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC.
6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS
CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE
SPRINGLINE OF THE PIPE.
0
SCALE: 1" = 20'
40201020
HORIZONTAL
VERTICAL
SCALE: 1" =2'
N
W
E
SSD-03
SD-03
SD-10
SD-11
KEY MAP
NTS
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETTRAFFIC SIGNAL
LEMAY AVENUE
POND D
TRILBY ROADBRITTANY STREETLEMAY L-FL PROFILE
4910
4915
4920
4910
4915
4920
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50
LINE TABLE
LINE LENGTH DIRECTION START (N,E)
CURVE TABLE
CURVE LENGTH RADIUS DELTA CHORD DIRECTION CHORD LENGTH START (N,E)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLPRELIMINARY LEMAY AVENUE STREET PLAN & PROFILE(NOT FOR CONSTRUCTION)8/28/23
1" = 30'
1" = 3'
ZMW
JTC
21-1045-00
C4.00
20 27
NOTES:
1.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO
BE DETERMINED IN THE FIELD BY CITY ENGINEER INSPECTOR. ALL
REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS
2.THIS PLAN HAS BEEN PREPARED FOR CONCEPTUAL REFERENCE
OF FUTURE LEMAY SOUTHBOUND RIGHT TURN IMPROVEMENTS.
NOT FOR CONSTRUCTION NWESCALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
CONCRETE SIDEWALK
HEAVY DUTY ASPHALT
PAVEMENT
LEGEND
EXISTING SLOPE
APPROX LIMITS OF
SAWCUT
0
SCALE: 1" = 30'
60301530
HORIZONTAL
VERTICAL
SCALE: 1" =3'
TYPICAL MODIFIED STREET SECTION
NTS
PROPOSED SLOPE
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION CONTROL DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.00
21 27
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION CONTROL DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.01
22 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
STABILIZED BURIED RIPRAP
ALL RIPRAP IS TO BE BURIED
PER BURIED RIPRAP DETAIL
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSITE DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.02
23 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
6" CURB AND 1' SPILL GUTTER
6" CURB AND 1' CATCH GUTTER
SIGN DETAIL
CONTRACTION JOINT DETAIL EXPANSION JOINT DETAIL
CONCRETE PAN DETAIL
CURB AND GUTTER DETAIL (ON-SITE ONLY)
SECTION VIEW
DRAIN DETAIL
PINNING DETAIL
SEGMENTAL RETAINING WALL DETAIL
STEPPING BASE DETAIL
CURB RAMP DETAIL (ONSITE ONLY)
STORM DRAIN OUTLET
ISOMETRIC VIEW
SECTION B-B
STORM DRAIN HEADWALL RIPRAP DETAIL
SECTION A-A
SOFT BOTTOM PAN
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSITE DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.03
24 27
SEE DETAIL 1606a FOR RAMP DETAIL
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLUTILITY DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.04
25 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSTORM DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.05
26 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
SANITARY / STORM CLEANOUT DETAIL
PLAN VIEW
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLSTORM DETAILS8/28/23
NA
N/A
ZMW
JTC
21-1045-00
C5.06
27 27
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.Call
Know what's below.
R
CONCRETE HEADWALL DETAIL
NTS
RAIN GARDEN FOREBAY DETAIL
CITY OF FORT COLLINS
BIORETENTION SAND MEDIA SPECIFICATION
PART 1 - GENERAL
PART 2 - SOIL MATERIALS
PART 3 - EXECUTION
SOFT BOTTOM PAN
NOTE: SEE SHEETS 18 & 19 FOR
UNDERDRAIN DETAILED ELEVATIONS