Staff has reviewed your revisions for the Miramont Self Storage PUD, �inal that were
submitted on June 24, 1997, and would like to offer the following comments;
1. Comments from the Engineering Depar4ment are attached.
2. Comments from the Sto�water Utility are attached.
3. Comments from the Water and Wastewater Utility are attached.
4. The Zoning Department requests that the lengths of all buildings be shown.
5. The Current Planning Department offers the following comments:
a. Does a four foot separation between buildings D and E comply with the
Bu. ilding Code? Please verify with Building Inspections.
b. Please clarify the discrepancy on relocated trees. Staff was unable to find
the relocated oak tree symbol(s) for the finro oak trees. It appears that their
are more linden trees being relocated than currently exist. Should the
relocated linden tree symbols either on the south side of Building M or the
southwest corner of Building L be the relocated oak tree symbol(s)?
c. Additional evergreen trees are needed on the east side of Building A on Lot
1 and the offce building on Lot 2 to provide a visual screen from Boardwalk
Drive.
281 North College Aye.nue • P.O. Box 580 • Fort Collins, CO 80522=0580 �(970) 221-6750 • FAX (970) 416-2020
�
�
�
d. Are the oolors referenoed on the building elevations real? They seem to be
oddly named.
e. Off-site easements must be submitted no later than Tuesday July 22, 1997
in orderfor this item to be scheduled for the August 21, 1997 P8Z hearing.
f. If scheduled for the August 21, 1997 P&Z hearing, PMT's, renderings,
perspectives, and prints will be due by noon on August 4� 1997.
This completes the review comments at this time. Additional comments may be
_ _
forthcoming as the various departments and reviewing agencies continue to review this
request.
As you ane aware, the City is implementing a new development review process. Plan
revisions may now be submitted at any time. Planning and Zoning Board da4es will
be assigned by City Staff when all 6ssues have been addresseci. Please contact me
for the number of folded revisions required for each document prior to the submit�al
of plan revisions.
Please contact me at 221-6206 if you have any questions or concems related to these
comments. I would like to schedule a meeting with you as soon as possible, if necessary,
to discuss these comments.
Sincerely,
%��;r � � _ _ �
.
Michael Ludwig, AIGP
Project Planner
xc: Sheri Wamhoff
Stormwater Utility
file/Project Planner
e
��TISIOl�T
C Ol�//IMEl\T� S � IEET �
DATE: June 26, 1997 DEPT: Engineering �
�
�
PI�OJECT:
PLANNER;
#54-87A0 Miramont
Final (LDGS) . .
Mike Ludwig
Self Storage P.0 D. -
All comments must be recieved no later than the staff review meeting:
Wednesday, July 16, 1997
Miramont Self Storage PUD - F'inal � July 16, 1997
Off site access and utility easement is needed-prior to this project going to the P& Z Board.
Plat
Provide reception number for existing us w�st easement. OR if it is not an existing
easement. than US West w'ill need to sign the plat as acceptance of the easement.
Utility Plans
� Section BB on sheets 3 and 4- What is the slope going toward the concrete pan.
• '�he aceess drive into the storage place now has a radius entrance, where in the previous
submittal it had been shown as the standard driveway cut for a vertical curb, A radius
access is allowed: The radius can be 15 feet maximum and a new detail needs to be
provided for this drive as the one shown on the detail sheet is for the previous type of cut.
� The sidewalk along the northern edge ofthe site needs to be 6 foot in accordance with the
site plan not 4.5 feet as shown. Also please label the width of the drive for the offiee's
parking lot.
o Modify details as shown" �
• Provide the new access rainp detail for the Board��valk/ private dr'ive access. (Across from
Oakridge Dr)
• Frovide a entrance detail for Boardwalk/ private drive entrance across from Oakridge Dr.
• See plans for additional comments
' `7'� .� /,, % S,
Date: (��. l� �:�'`� Signature. , CI'� ��'L:�. '�'%
� -- ,l/
, .
CI�CK HERE IF YOU W1SH TO RE�EIVE COPIES OF REVISIONS
�lat �-Si� _ D�e R�rt _ O�a�
v(jl�1�j► . I.��1D8 Uil�l(j► ��C City of Fort Collins .
I�E�TISIOI�T
C Ol�1VIEI0T.T S HEE T
DATE: .July 9, 1997 DEPT: Water/Wastewater
FROJECT: .#54-87A0 Miramont Self Storage PUD -
Final(LDGS) �
PLANNER: Mike Ludwig�
All comments must be received no later than the staff review meeting:
� Wednesday, July 16, 1997
-Provide required landscape utility separations.
-Provide prof les of all sanitary sewer and storm sewer _main. Show all
water andlor sewer crossings ir� the profiles. " �
-Provide detail notes on the abandonment of all services.
-Include the following standard details: �
*Man hole . .
*Man hole adjustment � . �
*Traffic area clean-out
*Concrete encaseineilt (if needed)
=See overall utility and landscape plans for other comments.
Date: _ �'! : -i� "� :� Signature:
� /'
CtiECK F1ERE IF 1'OU1VISli TO RECEIVE COPIES OF RE�7SIONS
X_ Plat _.Site _ Drainage Report _
X Utility- � X Redline Utility X Landscape
�
�
� S�ORNIVI/ATE�
1�VISI�I�T ��" � G '��'
COl�/Il�/IEl�TT S
DATE: June 26, 1997 DEPT: S�ormwater LTtili�
PROJECT: #54-87A01VIiramont Self Storage P.IJ D. -
Final (L.DGS)
PLANNER: Mike Ludwig
All comments must be recieved z��later than the staff review meeting:
' Wednesday, July 16, 1997
1. SubbaSin delineations are needed for the areas used to calculate flow for design point 7
and 8. Please show the basin delineations and the design point flows on the plans.
RESPONSE:
2. The clearance between the storm sewer from Lot 2 and the sanitary sewer should be
checked. Please call out this on the plans.
RESPONSE:.
Date• 7 � � %—" �1_� _ Signature.
_ _ . __ _
GC� /►/�I_IYP � vdwiy
,JY/��/4r'1�1 d'�' :
CgEECg HERE � YOU W�H TO RECEEtV�E COP�S OF ON5 �n � k; h�
Pl� Si6o ' : Re� _ 08�'
�l� �C � _ City of Fort Collins
� � � ' � a
3. The design of the access road needs to be further considered to allow for ttie futule
suirounding developmem. It appears the cuirent design is above the existing surrounding
ground surface. The flowline elevations should be at or below the elevation of the off-site
area to allow for the: future site to drain into the access road. Please call out spot
elevations and check capacity of the access road to convey flows from future development
to the northwest.
RESONSE:
4. Please show the design point 8 cross-section on the plans and show the spot elevations
used in the cross-section.
RESPONSE:
5. The erosion control escrow is 1.5 tiines the greatest between the cost. of the erosion
control measures and the cost of revegetating the site. The cost of the: sedirnent trap
needs to be included in the erosion control cost.
RESPONSE:
6. Subbasin B should be broken up into two basins. One basin drains to Boardwalk and
the other drains to Miramont First Filing. The basin should be broken up to show that the
proposed area draining to the First Filing is less than the e�sting area draining to the First
Filing.
RESPONSE:
7. Ple.ase show supporting topography for off-site basins OS2 and OS3.
RESPONSE;
8. Please provide the easement for the north acces road.
RESPONSE:
Please refer to the redlined plans and report for additional review comments.