June 3, 1997
Camr�iit;� Planning and Environi��enf�ei�vices
Cu�r�1t� I��ai�i�iit�
SecurCare Self Storage, Inc.
c/o Eldon Ward
Cityscape Urban Design, Inc.
3555 Stanford Road, Suite 105
Fort Collins, CO 80525
Dear Eldon,
Staff has reviewed your documents for the Miramont Self Storage PUD, Finai that were
submitted on �cp-30, 1997, and would like to offer the following comments:
�1�/L V �
. `
The Light and Power Utility offers the following comments:
0
0
The transformer needs to be located within 10 feet of a paved surface.
Any relocation of existing facilities along Boardwalk Drive will be at the
developer's expense.
2. U S West offers the following comments:
a. Review of these plans should not be construed as a commitment that
telephone facilities sufficient to serve this project are presently available.
U S West will provide telephone service in accordance with the rates and
tariffs on file with the Colorado Public Utilities Commission.
b. The owner is responsible for provision of all conduit, ditch crossings, and
street for telephone facilities within the project. In commercial buildings, the
owner also provides terminal space (usually 8' x 4') and power for the
telephone terminal, generally in a utility room. For residences, the owner
provides conduit from the location where the inside wiring is stubbed out of
the building wall to the telephone pedestal. Contact th.e U S West engineer
for conduit specifications for the telephone entrance cable.
c. Any relocation of existing telephone facilities required by these plans will be
paid for by the developer.
281 :����rtn College A��ent;e • PO. Box 5S(1 • Fort Collin�, CO 8Q�2?-0�80 •(970) 227-67�0 • FAX (970) �16-20�0
. • •
d. The 15' x 30' U S West easement at the southeast corner of the site is
shown in different locations on the Plat and on the grading and drainage
control plans. Please resolve this discrepancy.
e. No general utility easement nor drainage easement may be platted over the
existing U S West easement.
3. The Park Planning Division stated that parkland fees will be assessed to the mini-
storage managers residence.
4. The Poudre Fire Authority offers the following comments:
a. Fire hydrants as shown on the site plan meet Fire Code minimum
requirements.
�b j Building "D" is out of access and must be fire sprinklered or separated as
� building "I" and "K" are shown.
c. Storage units greater than 5,000 square feet must be fire sprinklered or fire
contained.
5. The Zoning Department offers the following comments:
a. The building envelope dimensions for buildings A, B, and C are incomplete.
Please clarify.
b. It appears that buildings "D" thru "K" are all in one building envelope. This
makes it difficult to know where buildings are supposed to be located.
Please provide building dimensions and distances between buildings in order
to clarify their location.
c. No building permits will be issued for buildings "A" thru "K" until these
classifications have been made.
6. The Building Inspections Department offers the following comments:
a. Buildings which exceed 5,000 square feet in area must be equipped with an
automated fire suppression system or be compartmentalized by fire-resistive
construction as required by Section 3802, Uniform Building Code as
amended by the City of Fort Collins.
b. The site shall be accessible to persons with disabilities in accordance with
Uniform Building Code Section 3103 and UBC Appendix Section 3106.
Provide a designated and marked "accessib(e route of travel" between all the
buildings on the site and building exits and entrances and the public way
(public sidewalk). Accessible routes shall comply with ANSI A117:1-1992
• •
with running slopes no greater than 1:20 and cross slopes no steeper than
1:50. Where routes cross lanes for vehicle traffic they shall be designated
and marked as a cross walk. Provide parking and signs per Appendix
Section 3107. Parking and access aisles shall comply with ANSI A117.1-
1992 with slopes no greater than 1:50 in any direction.
c. Buildings shall be designed to comply with the Fort Collins Non-residential
Energy Code (ASHRAE 90..1 with local amendments) or Residential Energy
Code (1995 Model Energy Code with local amendments) whichever is
applicable.
d. Storage or use of hazardous materials must be in compliance with the Fire
Code and Chapter 9 of the 1991 Uniform Building Code as adopted by the
City of Fort Collins. If used or stored, a list of such materials with quantities
and classifications should be submitted for review at the time of building
permit application.
7. The Current Planning Department offers the following comments:
Site Plan
,�. General Note #4 on the Site Plan references that the number and location
of building entries maq vary. If entries vary from the building elevations, an
Administrative Change will be required. Please modify General Note #4 to
reflect this comment.
� The last sentence of General Note 7 should be revised to state: "All building
and/or pole mounted fixtures to feature sharp cut-off, down directional
luminaries."
� Only one trash enclosure is shown for the mini-storage facility. Is this
adequate?
d. Please revise the Land Use Table on the Site Plan:
� The existing zoning is "H-C, Harmony Corridor District".
�,,� The Floor Area Data should be broken down by lot.
The maximum height of any building per the building elevations is
approximately 28 feet, not 36 feet.
� The zoning districts designated on the Vicinity Map no longer exist. Please
revise according to the CityPlan zoning map.
.f! The zoning districts designated for surrounding properties on the. Site Plan
no longer exist. Please revise according to the CityPlan zoning map.
b
• •
g� Staff suggests that the sidewalk along the access. drive from Boardwalk Drive
� to the Lot 2 parking area be detached. In addition, the entire walk should be
6 feet wide, not tapering to a four foot width.
,q� Please label the height of the wrought iron fence on the site plan.
i. The sidewalk in front of the mini-storage office/residence should be 6 feet
wide to accommodate vehicle overhang. Please revise and dimension this
sidewalk.
Landscape Plan
�� The Landscape Plan indicates that several trees are to be relocateci. Where
are they being relocated? Other existing trees are shown but are not labefed
"to remain". Will these trees be impacted by grading of the detention pond?
Please add the attached Tree Protection Notes to the Landscape Plan.
,
�K.
W
�-- :
4m�
;'n;�
��
r�p,.
��_�
G'J
Plant Note 17 should be revised to state: "If work done on the water and
sewer service lines causes shrubs to be removed, they must be replaced in
accordance with this PUD document at the property owner's expense.
As stated in comment "g", Staff suggests that the sidewalk along the private
drive to Lot 2 be detached. Street trees are requested between the curb and
the back of the walk.
A landscaped parking lot island is needed at the mid-point of each side of the
Lot 2 parking lot.
The landscaping around the mini-storage office/residence is very minimal.
Additional trees and shrubs are needed.
Additional trees are needed on south and east sides of the office building on
Lot 2.
The sidewalk on the north side of building "D" should be tree lined to create
an attractive pedestrian corridor.
Please provide a perspective drawing of the pedestrian corridor north of
building "D".
Building Elevations
Roofing materials should be designated as "high-profile, heavy dimensional"
on all elevations (including the mini-storage elevations).
• •
� S
�
:
��
i�
11.
�
�
�
kni.�
Other
Please provide a paint schedule on the elevation sheet which provides
detailed paint colors�and product names and stock numbers.
Please provide overall building dimensions on the elevation sheet.
Please delete the Notes on the Elevation sheet. The building materials and
colors of the buildings must be decided now as this is a Final PUD.
Please provide an elevation of the proposed wrought iron fence.
Please provide an elevation of the trash enclosures on the elevation plan
sheet. �
x. Off-site easements are needed for the access to Lot 2. Final easements
must be submitted with plan revisions. This application will not be scheduled
for a Planning and Zoning Board Hearing until final easements are
submitted.
The Mapping Department offers the following comments:
a.
b.
c.
d.
The existing utility easement near the S.E. corner of Lot 1 needs to be
dimensioned.
How was Boardwalk Drive dedicated? Please clarify.
Please be aware of the new City subdivision requirements regarding
monument records.
The legal does not match the map (first bearing after the point of beginning).
Comments and redline plans from the Engineering Department are attached.
Please return the redline plans to Mike Ludwig with plan revisions.
Comments and redline plans from the Water and Wastewater Utility are attached.
Please return the redline plans to Mike Ludwig with plan revisions.
Comments and redline plans from the Stormwater Utility are attached. Please
return the redline plans to Mike Ludwig with plan revisions.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request.
•
•
As you are aware, the City is implementing a new development review process. Plan
revisions may now be submitted at any time. Planning and Zoning Board dates will
be assigned by City Staff when all issues have been addressed. Please contact me
for the number of folded revisions required for each document prior to the submittal
ofplan revisions.
Please contact me at 221-6206 if you have any questions or concerns related to these
comments. I would like to schedule a meeting with you as soon as possible, if necessary,
to discuss these comments.
Sincerely,
.
Michael Ludwig
Project Planner
xc: Sheri Wamhoff
Stormwater Utility
file/Project Planner
12.
I3.
.:E
�'f1'
.ILB 14.
OWN�R TO QU�-^.�IT7 CN�CK AL� DL�+NT I�IAT; r2i.�L PRICR TO IN57,r:�L�'+TION.
ALL EY.IS7ING i R��S S�-I„LL B� �'RUNtD TO TI-�E Gi-f1' rOR�S7�R'S "M�DIUM
PRUNE ST:-�ND.:R�S"_
�XISTING T��S �O a,� 5�,��� SNOLJLD BE M,�,RK�D W11'N �'ROMIN�NT
�D�NTI�IG.'=�TION. W!-I� R� TR�� TRUNKS AR� APT TD BE D�41�lACzED, TN�1'
SNOULD �� `��,7T�CT�� WI'�-; "'i�T."�,L POSTS .�^-+ND SNOW ��.NG�.
��IS. ���'��l �G�U!n �'' cNT SNOUL✓ NOT �E ALLOW�D 70 GOMP.^1CT DY�R
TN� SOIL O'.��!�'' i�-ic ROOT �CN� Or- Ei%ISTING TRE�S.
1�. •{`✓OID GUT � I1�:G 5���.=��� � OC� � S WN�Rc'✓�R POSSI�LE. 51D�W.�,LKS
.�N:� P�.�,�IrdG- -� ��LS SNOU��� �c CO�ITOUR�D SLJ�FIGI�NTLl" TO
:�,`✓OIC 5L1G:: �1.:�71NG
I� r�00T GU � S�'r='C-'�1 �,�..� ...� ,,�' : S�IDULG `��� GON` R�,PI:✓! `'. SIi00 i N
r=LUS�-I GU*S Sr;C�'�L: �� '"��=,✓� �•�;GKFIL� ��FOR� Tr-IE �OOYS �,�-,'✓�
:'. Cr-;,"1�1G� '� :��� n�` ,_,N:� �:.:�=;T�r2 7N� *rK�� IMMLDi,�.T�L �'.
18. :•�L L-'-.N^SG��'Ii�1G- ''iUS� .:�� '.'�:S�r;LL�G GR S�GURCG '�lll �;--I �N
12R�vOGN.=��� _�T � �R o= ��._:�,`, �SGROW O� P�Rro��r�1C� �OrtiD
��JR 1���� G�= TI-� .-'.'����,TiOi�; .'_S I?dvIGAT�.� ON TNIS PLAN Pt210r�
TO TN� !SS:�.;NC� O� .=. C��--�=!C�,T� 0= OGGU�ANC1'".
I�;. �"+-i� II�T; NT Or= 'N� ir'I��' R'_��K S�r IP �-,LONG Pt�OSP=�T r�G.'�D 15 TO
:�R:'.�I :� �. T�'�'t='C�='.�.r=' SU� :=�,G� TR: .=Ti i��iT r=OR �iN� SUMI"1�R 1`�`��
;.,ROWlldr: 5�.��-�N ONL� ..=;5 'i�� GNOIG�:� 'Q� INTcpS�CTION II"f�ROV�' i�N`S
..-,R� GURR�N ; �' �C�i�:✓U:_�� =0R SF'r211�lG '��3. I�, Pr�lOr2 TO ?1-I�
II�:c`':.�LL.�-.TI��N •�" I!-iIG, ty`.1�.�-� .�I)�l� !�It..�i�..�I'v'�' �O'✓�iR, I I ✓��OI liG �`✓iLi'�i�1
i i-;.�:,? '�-;� I� ;-`-- �. �'_'I��t, ,^'=. ,' .'�!"i�iv i �, WI�L �� �EL•'.Y�L� FG� TW�� Gr
._1,`�r�i= ,��C`U,.!li,!'__ ���._, i����!`= � -�'��S�1F'OIv�C' ��1��lD �;U.�_-.L'ST G� i993�, i.=�CG
� � !E� ! i � .•_3'='�� � i ` !'• : .-,_� !Ri;l�3�,�_.1 T'Jt< < �LU: �:!=�.�.SS 5C•;✓ ''
���`. � ��lJ '�.�1r �`J` � . �.��_.-..r-'� , ./`` i '(�I� Y� . '
h . , � � ... ' y�..� �� - .
� � . �� .� '��,. -�;,..._
�, .
. ' -,
F;€~i!'�;��!'."�t. �i
�:i��:�i`t'..
�' � �;:;
,r
��. ;'
y ��
,,y.v;.a�
.�� �a�t:�; .
tt;.��.;' �"�'
f"�'. �4 �
y� �w-�A
;y
";:
•
:'� :,»%s3 :�
.� S{
,,�
A,,
�� �'i«
.C�..�,. . �:,j, r�.
: i t� r� �:
'r��'�•.
����f!
:��.„ ��«
a
�;
;:;�,,: ;,,.
.
i 4�1 •
' ,.,.,�,�' ,�,.
'��; _
r: / ?i..
�.y,��� .i� � ( �
0
•
•
PROJECT
C OMMENT S HEET
�i�y af Forf Collins
Current Planning
DATE: April 30, 1997 DEPT: Engineering
PROJECT: #54-87AN Miramon�t Self Storage PUD
Final (LDGS)
PLANNER: Mike Ludwig
All comments must be received no later than the staff review meeting on:
Wednesday, May 28,1997
Miramont Self Storage PUD - Final May 26, 1997
Off site access and utility easement is needed prior to this project going to the P& Z Board.
Site Plan
Maximum driveway width for a commercial use is 35 feet.
Provide a type III barricade at the end of the private drive.
Plat
• Provide reception number for existing us west easement.
• show access/ utility easement to the north of the property that is to be provided and
indicate that it is to be by separate document.
Utility Plans
• Correct general note.
• Maximum driveway width for a commercial use is 35 feet.
• Provide a type III barricade at the end of the private drive.
• Modify details as shown
• Provide the new access ramp detail for the Boardwalk/ private drive access. (Across from
Oakridge Dr)
• Provide a entrance detail for Boardwalk/ private drive entrance across from Oakridge Dr.
• See plans for additional comments �, �, J
Date: �i�� Signature: - �i �-- D� C � -
CHECK HERE � YOU WISTH TO RECQVE COP�S OF REVISIONS
XP�t XSite _ Drainage Report X(}d�er � 5��' ,
— �
.L U�`1 ��� U....'1 _�""""!'" .��`�'�''""`"� � Citv of Fort Collins
•
•
�
. :. PROJECT
�� fF ��o�li� COMMENT SHEET
..
DATE: May 28, 1997 DEPT: Water & Wastewater
PROJECT: #54-87AN Miramont Self Storage PUD
Final(LDGS)
PLANNER: Mike Ludwig
All comments must be received no later than the staff review meeting:
� VVednesday, May 28, 1997
-Will storage units be fire sprinklered? If so, sho��v taps for such.
-Sewer mains may only be studded out 2' or must be extended to next manhole. Provide
manhole at west end of extended sewer main.
-Provide utility easement for irrigation service curb stop.
-Will offsite easement be required to extend water and se���er mains ��vest of Oakridge Dr.
-Maintain 5' separation from water and sewer mains and curb and gutter flow lines.
-See landscape and overall utility plans for other comments.
,� �
� �,
Date: � r7 � % Signature: .�;c.-�-� �t-� �`�, ,`-,`����;• �- .�r ,
. ,
;,' �
CHECK HERE IF 1'OU �1'ISH TO RECE1�'E COPlES OF REVISIO\S ��
X Plat _ Site _ Drainage Report _Other
X Utility X Redline Utility X Landscape City of Fort Collins
. � � ^r •
•
e
PROJECT
C O NT S HEET
C.ity of Fort Cnllins
Current Planning
DATE: � 5���� � DEPT: Stormwater Utility
PROJECT: rl-t i�'�N�,�`-r ,5��� s�cer�y�
PI,��NNER: 6V1 J� E L �D �� ��
ENGINEER: 5� E e � �,� �1 �t !�o r�
All commenfs rrrust be received by:
�No Probiems �
Problems or Concerns (see below or attached)
1. Erosion control notes should be on erosion control plan.
RESPONSE:
2. Refer to the Overall Drainage Study for Oak/Cottonwood Farm by RBD revised in
March 1995 for the allowable release from the detention pond. For this site, the allowable
2-year release is .12 cfs/acre and .5 cfs/acre for the 100-year release. Therefore a staged
release outlet structure should be designed.
RESPONSE:
� - � u - �r � r�'%'� �- =t-�
Signature:� '
P�L tEASE SEN� COPIES OF I�TARKED REVI�SIONS: � PLAT �G � �'r�ll�C ��'c���
Q SITE � .loE+�c/ l�. ,t�i�.'� �-
� j� UTILITY
_ ❑ LAIv'DSCAPE
. � I�z.��,va.yE
•
•
and effectiveness shall also be discussed in the report. Please provide all performance
standard and effectiveness calculations in the report. The erosion control escrow also
needs to be calculated.
RESPONSE:
10. Please show a detail of the pond outlet structure. The outlet structure shall be
iiesigned for the staged release.
RESPONSE:
Please refer to the redlined report and plans for additional review comments.