Project Information and Design Narrative
Front Range Storage Project Development Plan
Introduction
The proposed site is located east of the I-25 frontage road approximately a quarter mile south of
Mountain Vista Drive. The overall property is approximately 105 acres in size and is currently a
legal parcel in the City or Fort Collins with the address 1312 NE FRONTAGE RD FORT
COLLINS, CO 80524. The majority of the site is currently being utilized for agricultural uses.
Additionally there is a U-Haul Rental facility being operated out of the existing 1,170 sf residence
and a 430 sf Garage/Storage shed.
The property is currently annexed to the City of Fort Collins and is Zoned I, Industrial.
Outdoor RV & Boat storage facilities are permitted in the I Zoning District, as a Type I
Administrative Review.
The intent of the applicant (Freedom Storage, LLC) is to subdivide the property into a total of 1
Lot, 2 Tracts, 1 Outlot, and a portion of ROW dedication. Lot 1 (10 acres) shall be developed as
an RV & Boat storage facility, Lot 2 with the remainder of the property (~88 acres) to continue
being utilized for agricultural uses. Tract A (1.14 acres) will include the 80’ I-25 setback &
landscape buffer and Tract B (1.03 acres) shall be used for the 50’ Public Trail and Access Easement
for a future Trail along the south side of the site. Outlot 1 (3.56 acres) will serve as a drainage
and access easement and is intended to act as a placeholder for a future industrial local street.
1.21 acres of land along the north boundary of the site is being dedicated as ROW for a future
industrial local street.
Property & Development Ownership
Freedom Storage, LLC is the current owner of the property and has been since December of
2022. The ownership of Lot 1 (RV & Boat Storage Facility), , Tract A (I-25 Landscape Buffer),
Tract B (future Trail & Access Easement)and Outlot 1 (Drainage & Access Easement) as well as
the remainder of the agricultural property (~88 Acres) shall be owned, maintained and farmed by
Freedom Storage, LLC Colorado Limited Liability Corporation.
Site Planning and Overall Design Concept
The Front Range RV & Boat Storage Facility will be locally owned and operated and represents a
much needed service for the Fort Collins Community. The lack of sufficient RV & boat storage
rental space requires that Fort Collins residences travel outside the City in order to find storage
rental opportunities. It is expected that the current “Economic Leakage” which Fort Collins is
2
currently experiencing in the RV & Boat Storage market place will be reversed by the Front Range
Storage development.
Front Range Storage will represent a low intensity land use that is identified as a Permitted Use
within the Industrial Zoning District. This use is adequately buffered from the surrounding areas
by the Larimer and Weld Canal to the south and extensive landscaping within the 80’ wide I-25
buffer zone. The outdoor storage land use represents one of the very lowest impact and low
intensity land uses that could be considered within the Industrial Zoning District thus generating
very few vehicle trips to and from the site. As such the proposed uses provide for a strong land
use transitions along the edges of the industrial district.
Front Range Storage will establish a new standard for adjacent industrial properties regarding
landscape buffering from the interstate and native grass plantings around the facility.
The RV & Boat Storage area was intentionally designed to have access drives running north to
south to utilize solar exposure to assist with snow removal.
The Front Range Storage facility will offer a wastewater dumping station and 24/7 access and
security to its clients.
Finally the site has been designed in such a way as to exceed the City’s desired LID goals. The
Grading and Storm Drainage Design will allow more than 75% of the new impervious area of the
site to pass through an LID Stormwater Quality feature thus reducing impacts to the urban
watershed and nearby streams and downstream drainage conveyances.
Amenities on Site
The Developers vision and plan is to create and operate a modern and sophisticated RV & Boat
Storage facility. The Developers are planning to offer (2) separate Wastewater Dump Stations for
their tenants, 24/7 video surveillance , spacious parking and circulation layout in a variety of parking
space size options as well as planning for future covered canopy parking. We have worked
countless hours performing industry research on the design of the parking and circulation “flow”
and have created “angled” parking stalls and drive lanes that best meet the needs of the RV &
Boating Community. Our varied parking sizes will accommodate a variety of unit types —
motorhomes, 5th wheels, tow behinds, etc. Additionally the Developer will provide 6’ high
security fencing around the property coupled with computerized access gates offering 24 hour
access security lighting placed throughout the RV/Boat Parking Lot. We feel security and safety
are of great importance.
Landscape and Site Design
Tree Planting Standard – The project will provide an 80’ wide Landscape Setback Buffer along
the I-25 Frontage road and a 25’ Landscape Setback Buffer on the north side of the facility adjacent
3
to the 71’ ROW dedication. Tree planting as per city standards shall be met in order to add to
the urban tree canopy of the immediate area.
Landscape Standards – It is the intent for the development’s landscaping to meet or exceed
the City’s standards for building, site, streetscape and parking lot landscaping. All areas that are
landscaped shall be irrigated with a permanent automatic underground irrigation system unless
they are intended to be non-irrigated. Any areas identified on the Landscape Plan to be non-
irrigated shall be irrigated with a temporary above ground irrigation system and irrigated until
such time that proper establishment of seeded areas has been achieved, a minimum of two growing
season.
Tree Protection and Replacement – An existing tree analysis was conducted with the City
Forester. There are currently 14 existing trees within the development area that will need to be
removed in order to accommodate the proposed development and its improvements. The
landscape plans accurately identify the locations of all existing trees each labeled showing the
applicant’s intent for these trees and appropriate mitigation values if they are to be removed.
Bicycle Parking – Given the nature of the proposed development the Developer has provided
the required number of fixed rack outdoor bicycle parking spaces and enclosed bike parking
spaces for employees.
Transportation Impact Study – Based on a previously meeting with the City’s Transportation
Department it was determined that the proposed development would be required to submit a
Traffic Memo which has been included with this PDP submittal.
Vehicular Site Access – Site access to Lot 1 shall be provided via a public access drive
connected to the I-25 Frontage Road at the same location as the existing access location. The
on-site vehicular drives have been designed to be safe, efficient, and convenient considering the
use of larger modes of transportation that will utilize the site.
Trash and Recycling – Trash and Recycling containers shall be provided to accommodate the
collection, separation, storage, loading and pickup of trash and recyclable materials. Trash and
Recycling containers for Lot 1 will be stored in the existing garage/ storage shed adjacent to the
existing bldg. Trash and Recycling shall be put outside for pickup and removal on the designated
trash collection day.
Emergency Vehicle Access – To ensure that emergency vehicles can gain access and maneuver
within the facility, and so that emergency personnel can provide fire protection and emergency
services, all drive isles have been designated as emergency access easements. A secondary
emergency access is provided at the northwest corner of the proposed site, which will include an
emergency access Knox Box.
Parking
The parking needs of the facility will be met on-site and shall meet or exceed the City’s required
parking standards.
All required parking is to be provided on-site. See site plan of the Project Development Plan for
a detailed accounting of vehicle parking proposed.
4
Access, emergency access, utility, and drainage easements have been provided and are shown on
the proposed Plat.
Parking lot drive lanes, Emergency Vehicle Access, turnaround and parking space layout have been
designed in order to provide for a well-defined circulation system for vehicles and pedestrians.
Storm Drainage & LID Design
The overall design concept related to site drainage for the Front Range Storage Facility is to
convey all developed runoff through LID isolator rows which are located near the detention pond
in order to accomplish the required LID goals as established by the City of Fort Collins.
Developed runoff from the site will then be conveyed into a detention pond designed to meet the
detention requirements of the proposed project at full build out. The detention pond will
discharge the detained release from the site at the south east corner of the property into an
existing outfall into the Larimer and Weld Canal.
The Front Range Storage Facility has been designed in such a way as to exceed the City’s desired
LID goals. The Grading and storm drainage design will allow more than 75% of the new impervious
area of the site to passes through an LID Stormwater Quality feature thus reducing impacts to
the urban watershed and nearby streams and downstream drainage conveyances.
Development Schedule
Construction Start: Spring/Summer 2024
Construction Completion: Fall 2024/Winter 2024
Closing Comments
We are excited to get this project started and appreciate any feedback and commentary from the
City of Fort Collins. This is not an investment project for us but rather a new income and job.
Transferring our “open and honest” ways of conducting business (from our success with the
Freedom Self-Storage Facility in Loveland) to the RV/Boat Storage industry. We plan on hiring
full time employees and staff from the nearby communities. We have already met with Planning
Staff and submitted several ideas and visions for the property and the best way to proceed. We
feel we have identified the “right use” for the land and location. We look forward to working
with you all. Please let us know if you need any additional information regarding this project. We
appreciate your time and guidance