HomeMy WebLinkAboutFRONT RANGE STORAGE - PDP230011 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTDevelopment Application
Complete Submittal Checklist
Development Review Center | 281 N College Ave | Fort Collins CO 80522 | 970.221.6689 | DRCoord@fcgov.com
Submittal Instructions
• A City Development Review Coordinator will be assigned to all projects - Your Development Review
Coordinator is available to assist you with the review process. If you do not have a review coordinator
assigned to your project, please contact us at 970-221-6689 or DRCoord@fcgov.com for assistance.
• Advanced notice of Submittal and resubmittals is appreciated - A completed copy of this checklist, all
submittal materials and fee payments are due at the time of project submittal. Please contact your
Development Review Coordinator at 970-221-6689 or DRCoord@fcgov.com for more submittal details
including turnaround times and next steps.
• Only complete submittals are accepted - The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
• City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
• Larimer County Urban Area Street Standards:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standards
3/30/2023 2 PDP/MJA Development Application Submittal Checklist
Project Type:________________________ Project Number (if assigned): _________________
New Submittal Revision -- Review Round:_____ Submittal Date:________________
Project Review Meeting Date: _______________
Development Review Coordinator:____________________________________________________
Complete Submittal Checklist:
Project Development Plan (PDP) · Major Amendment (MJA)
Project Name:
Applicant Name:
This checklist is for the Project Review phase for all development projects (see Step 5 of the process
flowchart). This checklist may be used for the pre-hearing review of Project Development Plans (PDP),
Major Amendments (MJA) Addition of Permitted Uses (APU), Basic Development Reviews (BDR) and Site
Plan Advisory Reviews (SPAR) as determined by staff.
All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (N/A) Not
Applicable or already (R)eceived. If the staff code is blank, then the item is required.
This checklist must be reviewed, completed, and accepted by staff prior to project routing. Additional
information may be requested from the applicant during the review process, if necessary, to address
specific issues that arise. Please note that all application materials, once submitted, become a matter of
public record.
Checklist, Submittal Forms and Fees:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
One copy of this checklist, completed and signed by applicant Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
One signed copy of Development Application Form
Payment for the above application form
Payments can be made by check or credit card.
Check: Make payable to City of Fort Collins. Mail to the Development
Review Center, 281 N College Ave, Fort Collins, CO 80524, OR place in
the blue drop box located at the west side of the building.
Credit Card: Would be processed over the phone. Credit card
payments include a convenience fee of 2% + $0.25 added to all
payments under $2,500.00, and 2.75% added to all payments over
$2,500.00.
3/30/2023 3 PDP/MJA Development Application Submittal Checklist
Electronic Copies*
All copies must be provided per City file naming standards and submitted electronically. All copies must be
prepared per city PDF formatting standards.
See: Submittal Requirements Section M – File Naming Standards & PDF formatting standards
*Paper copies of plans and reports are not required during development review. See Submittal Requirements,
Section D for drawing format guidelines. All plan elements shall be clearly drawn and labelled. A scale bar must
be provided on all scaled drawings. Paper copies of plan sheets may be requested to complete a timely
review, including instances when the drawing scale is not accurately depicted.
1)General Information:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
A comment response letter from the project's Conceptual
Review or Preliminary Development Review staff meeting;
or for resubmittals include a comment response letter from
the prior round of review. To receive a final copy of the
project review comment letter, contact your Development
Review Coordinator
Section C
Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
Project Information and Design Narrative
2)Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Title Block information on all plan sheets
Section D Cover Page, including:
Title Block
Land Use Table Section E
Sheet Index
Section D Signature Blocks
Site Plan Notes
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Site Location Map
Section D Legal Description
3/30/2023 4 PDP/MJA Development Application Submittal Checklist
Site Plan Sheet(s) (and related hardscape design detail
sheets, See Section I for Requirements) Section F
Architectural Elevation Sheet(s), Materials and other detail
sheets (color elevations recommended)
Section G
Landscape Plan Sheet(s)
Standard city landscape notes, and related planting detail
sheets (See Section I for planting detail requirements)
Section H and I
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Lighting Plan, Photometric Plan and Lighting Detail
Sheets
Section ITrash and Recycling Enclosure Details
(include these details with the site plan sheets or elevation
sheets)
Confirmation that all Sheets provided incorporate City
drafting and format standards Section D
Staff Comments:
3/30/2023 5 PDP/MJA Development Application Submittal Checklist
3)Subdivision Plat:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
A subdivision plat of the site at an appropriate scale on one
or more sheets, with outer dimensions printable at 24" x
36" and appurtenant documents prepared according to the
requirements described in the submittal requirements.
The plat must conform to the subdivision requirements of the
City, except as waived by the approved project development
plan for the development. Final Plan review and subdivision
plat approval, and complete execution, together with all
necessary certifications, shall be required before filing of the
subdivision plat or issuance of building permits.
Each residential lot on the subdivision plat shall identify if
the garage door(s) is recessed behind the front face of the
building, located on one of the other sides of the building,
detached from the building or located to the front of the front
face of the building.
Section J
LUC Division 3.3 –
Engineering Standards
City Contact(s):
•Technical Services –
Jeff County,
JCounty@fgov.com
•Surveying –
John Von Nieda
JVonNieda@fcgov.com
Monument Records
Closure Report
4)Utility Plans (Civil Construction Plans):
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Existing Conditions and/or Demolition Plan Utility Plans Checklist.pdf
City Contact: Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
Overall Grading Plan
Overall Utility Plan Sheet
Drainage Plan
Street Plan
Including horizontal alignment and centerline profiles for public
streets
3/30/2023 6 PDP/MJA Development Application Submittal Checklist
5)Preliminary Drainage and Erosion Control Report:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Preliminary Drainage and Erosion Control Report may
include the following:
Detention Requirements and Calculations
Offsite Flows
Floodplain Zone -- Contact Floodplain Administration
staff at 970-416-2632 for questions
Hydraulic Calculations
Detention Basin Calculations
Standard Water Quality and LID Calculations
Include Drainage Plan or Exhibit in the report
Note: All items shown above are components that may
be necessary with a drainage report analysis. Not all
components may be necessary. The drainage report
analysis must be prepared by a professional engineer.
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
A.Required Submittal
Content
B.Stormwater Facilities
Landscape Standards
C.LID Implementation
D.Erosion Control
Guidance
E.Erosion Control
Construction Measures
Fact Sheets
F.Erosion Control
Construction Measures
Standard Notes
City Utilities:
Development Forms,
Guidelines & Regulations
For Stormwater or
Floodplain questions,
contact:
waterutilitieseng@
fcgov.com
970-221-6689
Erosion Control Information:
www.fcgov.com/erosion
3/30/2023 7 PDP/MJA Development Application Submittal Checklist
6)Reports and Supporting Documents:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Planning Services:
Perspective views of the Building Exterior
(Incorporated into the building elevation sheets) Section G
Electronic Building Material Sample Board
(Physical board maybe required upon request)
Neighborhood Context Plan
(Overall site plan diagram indicating surrounding
neighborhood features, to be incorporated into Site
Plan sheets or cover page)
Section C
Land Use Code Modification and Alternative Compliance
Requests; staff review, and approval required prior to
Development Review Completion
(If Modifications are proposed)
LUC Division 2.8
City Contact: Planning
Services
planning@fcgov.com
970-416-4311
Parking Alternative Compliance Studies
Guidelines for these studies are held by the Director
Parking Impact Study Guidelines
(If Alternative Compliance is proposed)
LUC Section 3.2.2(K)
City Contact: Planning
Services
planning@fcgov.com
970-416-4311
Certification of Notice to Mineral Owner(s)
Certification of Mineral Estate
Owner Notification
C.R.S.A § 24-65.5-103
Building Services:
FOR INFORMATION: THIS MEETING IS REQUIRED FOR
COMMERCIAL PROJECTS PRIOR TO FINAL PLAN
SUBMITTAL, but generally not prior to hearing.
Building Services Presubmittal Meeting:
Confirmation of completed Pre-Submittal Code Feasibility
Meeting with Building Services will be included with the Final
Plan (FDP) Checklist, but not with this checklist.
New Commercial Projects require a pre-submittal meeting for
building code feasibility. This typically takes place when
drawings are 50% complete and in the mid phases of the
Development Review Process, and prior to Building Permit
Submittal.
Applicants are encouraged to review building requirements as
early as possible in the process. For questions or to schedule
this meeting please reach out to your Development Review
Coordinator.
Please Note: Building
Permits will not be reviewed
until Development Plan
review process is completed
Building Codes and
Standards
Building Permit Fees
3/30/2023 8 PDP/MJA Development Application Submittal Checklist
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Development Review Engineering:
Soils Report
In conformance with the Larimer County Urban Area
Street Standards
Larimer County Urban Area
Street Standards
Subsurface Hydrologic Study
Signed letters of intent from impacted off-site
property owner(s) indicating generating agreements
and that all required off-site easement and off-site
rights-of-way can be finalized in conjunction with the
Final Development Plan Submittal
Required prior to scheduling hearing
City Contact: Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
Draft legal descriptions for accompanying deeds of
dedication by separate document
Easement and Right-of-Way
Dedication Process
Draft legal descriptions for accompanying easement
vacation request by separate document
Vacation of Easements
Process
Closure Report for any Easements and/or Right of Ways
submitted for review
Engineering or Utility Variance Requests
City review and approval required prior to scheduling
hearing
Larimer County Urban Area
Street Standards
Traffic Operations:
Transportation Impact Study (TIS) OR waiver
indicated from Traffic Operations staff
Waiver indication to be provided with initial submittal
Traffic Operations
Resource Page
City Contact:
Traffic Operations
970-221-6630
3/30/2023 9 PDP/MJA Development Application Submittal Checklist
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Environmental Planning:
Ecological Characterization Study (ECS)
If an ECS is required, this must be submitted at least
ten days prior to the development review application. A
copy shall also be submitted at the time of the
application with this checklist.
Section J
Section H
LUC Section 3.4.1
City Contact:
Environmental Planning
970-416-4311
Phase 1 Environmental Site Assessment
Has there been previous uses on the site that could
cause contamination of some sort? i.e., mechanic
shops, quick lube shops, chemical storage/processing,
manufacturing, gas stations or anything with fuel
storage (above or below ground), dry cleaners, etc.
To be provided by qualified
third-party consultant
City Forestry:
Existing Tree Inventory Plan
Prior to the review submittal, the applicant must
schedule an on- site meeting with City Forestry to
obtain tree inventory information for all existing trees
within the development area. The meeting is also
intended to discuss any proposed tree removal.
PLEASE NOTE THAT EXISTING TREES SHOULD
NOT BE REMOVED OR DAMAGED PRIOR TO
SUBMITTAL, REVIEW AND APPROVAL OF THE
PROPOSED DEVELOPMENT.
See Submittal Requirements
Sections H and L for more
information regarding
documentation of existing and
proposed trees on landscape
plans
City Contact:
City Forestry
forestry@fcgov.com
970.221.6660
City Forestry Resources:
www.fcgov.com/forestry
Land Use Code Section:
3.2.1(F) Tree Protection and
Replacement
Existing Tree Removal Feasibility Request
Provide a letter to City Forestry outlining the justification
for the removal of any existing trees, if proposed.
Existing Tree Mitigation Plan
At your site meeting, City Forestry will determine the
characteristics and mitigation requirements for all
existing trees within the project's proposed Limits of
Disturbance.
(If tree removal is proposed).
3/30/2023 10 PDP/MJA Development Application Submittal Checklist
Other information and data as required for the full
and complete consideration of the development (to
be completed by City staff):
Hazardous Materials Impact Analysis.
Any special wildlife, wetland, natural habitats, and
features, ecological or environmental study or mapping
pursuant to Section 3.3 and 3.4 of the Land Use Code
as requested by the Director.
Other items required: City Contact: Development
Review Coordination
DRCoord@fcgov.com
970-221-6689
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports.
I understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Signature: ______________________________________________________ Date: ______________________________
Phone: ______________________________________ Email: ________________________________________________________
(See Development Application Submittal Requirements for detailed description of requirements)