HomeMy WebLinkAboutTRAIL HEAD TRACTS F & G TOWNHOMES - PDP - PDP170035 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCity of
Fort Callins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Coliins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.comidevelopmentreview
� �
�
November 14, 2017
JR Engineering
2900 S College Ave Suite 3D
Fort Collins, CO 80525
RE: Trail Head Tracts F& G Townhomes, PDP170035, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for the staff review meeting discussion. At the meeting, we can highlight whether any comments need
to be resolved prior to the P&Z hearing. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Clark Mapes, at 970-221-6225 or
cmapes@fcgov.com.
Comment Summarv:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
Topic: General
Comment Number: 4
Comment Originated: 10/03/2017
11/09/2017: There are still LID Basin labels shown on the site plan within the
Vine-adjacent utility easements. 10/03/2017: No LID basins should be located
within the Vine Drive utility easements or any ROW-adjacent utility easements.
Comment Number: 14 Comment Originated: 11/13/2017
11/13/2017: Once the LID Basin labels are addressed, Engineering will be
ready for the project to go to public hearing. Please note that there will likely be
additional FDP level comments at the time of FDP review.
Comment Number: 15
Comment Originated: 11/13/2017
11/13/2017: For FDP: Thank you for addressing the grade breaks on Green
Lake Drive. The two 80 foot vertical curves which were added are just shy of the
minimum 90 foot length requirement - please note that the connector has a 30
mph design speed.
Comment Number: 16 Comment Originated: 11/13/2017
11/13/2017: For FDP: please include the side title block on the cover sheet for
future use for revisions, etc.
Contact: Sheri Langenberger, 970-221-6573, slanqenberqer@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 09/15/2017
09/15/2017: Unable to verify the if the TDRF paid is correct as the plat did not
include the total acreage being platted. Assuming that is identified with the next
submittal the fees will be checked at that time.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 6
Comment Originated: 11/08/2017
11/08/2017: It appears that Tree #6 on the tree mitigation plan also requires
mitigation, so the total mitigation required should be 19. Please update plans
accordingly. (this can be addressed after hearing if needed).
Comment Number: 7
Comment Originated: 11/08/2017
11/08/2017: For reference: If this project is approved, Environmental Planning
will have Development Agreement requirements related to the raptor nest and
limits of development.
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
Comment Originated: 10/04/2017
10/03/2017: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2015 International Building Code (IBC)
2015 International Residential Code (IRC)
2015 International Energy Conservation Code (IECC)
2015 International Mechanical Code (IMC)
2015 International Fuel Gas Code (IFGC)
2015 International Plumbing Code (IPC� as amended by the State of Colorado
2017 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 129vu1t or 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Single Family; Duplex; Townhomes: 2015 IRC Chapter 11 or
2015 IECC.
r
�
�+�r
2
Comment Number: 2
Comment Originated: 10/04/2017
10/03/2017: Building code and State statute CRS 9-5 requires projects
provide accessible units. Please review the statute and provide a full
accessibility plan with any building permit submittals.
Department: Light And Power
Contact: Clint Reetz, 970-221-6326, creetz@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 09/27/2017
09/27/2017: Light and Power currently provides both single and three phase
power to surrounding developments. Electric facilities can be e�ended to serve
this development.
Comment Number: 2 Comment Originated: 09/27/2017
09/27/2017: Development charges, electric Capacity Fee, Building Site
charges and any system modification charges necessary will apply to this
development.
Please reference our policies, development charge processes, and use our fee
estimator at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees/electric-development-fee-estimator
Comment Number: 3
Comment Originated: 09/27/2017
09/27/2017: Multi family buildings are treated as commercial services;
therefore a C-1 form must be filled out and submitted to Light and Power
Engineering. Transformer and cable sizing will use the information on this form.
C-1 forms can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 5 Comment Originated: 09/27/2017
09/27/2017: You may contact FCU Light & Power, project engineering if you
have questions. (970j 221-6700. You may reference Light & Power�s Electric
Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FI NAL_18November2016_Amendment.pdf
Comment Number: 6 Comment Originated: 11/13/2017
11/13/2017: If ROW footage on Vine is reduced and Light and Power existing
facilities become stranded out of ROW, a Utilities easement may be required.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, '�lynxwiler@poudre-fire.org
Topic: General
Comment Number: 4 Comment Originated: 11/13/2017
11/13/2017: EMERGENCY ACCESS EASEMENT
For clarity and consistency, the proposed fire lane should be relabeled as
Emergency Access Easement (EAE), rather than an Emergency Vehicle
Access (EVA).
3
Comment Number: 5
11/13/2017: ADDRESS POSTING AND FIRE LANE SIGNAGE
To be resolved during FDP.
Department: Planning Services
Contact: Molly Roche, , mroche@fcqov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 11/13/2017
Comment Originated: 10/03/2017
11 /6/2017:
Continued:
Please clarify the origin of the additional notes under the General Landscape
Notes. The most current City of Fort Collins General Landscape Notes should
only include 13 notes.
10/03/2017:
Please use the most current version of the City of Fort Collins General
Landscape Notes (November 2015), which are available through City Forestry
(Molly Roche � mrcohe@fcgov.com).
Comment Number: 2 Comment Originated: 10/03/2017
11 /6/2017:
Continued:
The requested changes do not appear to have been implemented. The
symbology for tree removal/retention is a bit confusing. In effort to simplify the
symbols for tree removals, please show an `X' through all trees to be removed.
Please omit the separate symbol used to show replacement trees, as these can
be shown on the proposed landscape plans.
10/03/2017:
In some instances, it appears as though the symbology for existing deciduous
tree to be removed is inconsistent with the Tree Mitigation Matrix. Please
ensure that symbology reflects what is shown in the Tree Mitigation Matrix (one
example: Tree #6 is shown to REMOVE/REPLACE, but the symbol used is a
bold tree, instead of the faded symbol).
Comment Number: 4
11 /6/2017:
Continued:
Not addressed last round.
10/03/2017:
Is the interior street, Green Lake Drive, public or private?
Comment Originated: 10/03/2017
4
Comment Number: 5
11 /6/2017:
Continued:
Comment Originated: 10/03/2017
Please include symbols for stop signs and street lights in the legend.
10/03/2017:
Please show location of any stop signs and street lights. Identify these fixtures
with a distinct symbol. Space trees if needed as follows.
Stop Signs: 20 feet from sign
Street Light: 40 feet for canopy shade trees and 15 feet for ornamental trees
- Note that this can be done in Final Plans, and is not a hearing item.
Comment Number: 6 Comment Originated: 10/03/2017
11 /6/2017:
Continued:
Not addressed last round.
10/03/2017:
Currently, Turf Type A is shown in the right-of-way strip. Please use irrigated turf
within the right-of-way as well as update the Landscape Legend to display this
detail.
Comment Number: 7
11 /6/2017:
Continued:
Is the storm sewer line existing or proposed?
Comment Originated: 10/03/2017
10/03/2017:
Please include locations of any water or sewer lines on the landscape plan.
Please adjust street tree locations to provide for proper tree/utility separation.
10� between trees and public water, sanitary, and storm sewer main lines
6� between trees and public water, sanitary, and storm sewer service lines
4� between trees and gas lines
Comment Number: 10
11 /6/2017:
Continued:
Comment Originated: 10/03/2017
There are still quite a few redbuds proposed on the plans. To ensure
survivability of total species on the project, please limit the number of this
species on the plans and incorporate additional ornamental varieties, such as
Japanese Tree Lilac and Thunderchild Crabapple.
10/03/2017:
Species Selection
-City Forestry suggests significantly reducing the number of Lindens (especially
Boulevard Lindens) and increasing the number of Catalpa and Kentucky
Coffeetree on the landscape plans.
-Please consider using Red Barron Crabapple where Adirondack Crabapples
are currently proposed. Red Barron will likely have better availability.
5
- Redbuds are not well adapted to Fort Collins soils. You may want to consider
limiting the number of this species used on the plans.
Comment Number: 12
11 /6/2017:
Continued:
Comment Originated: 10/03/2017
There appears to be two mitigation trees missing their label on landscape plan
sheet 6.
10/03/2017:
Please show all upsized mitigation trees labeled with a bolded, capital �M� on
the landscape plans.
Comment Number: 13 Comment Originated: 10/03/2017
11 /6/2017:
Continued:
Please add trees #53 and #57 to the transplanted/relocated tree note and show
their new locations on the landscape plans. Please also label where specific
trees are being relocated using their assigned inventory numbers.
10/03/2017:
Please show transplanting locations for trees 23, 24, 25, 54, and 55. Add a note
that says: Transplanting trees #23, 24, 25, 54, and 55 shall follow the
recommendations of a qualified tree transplanting contractor in terms of size,
staking, mulching, and irrigation. Additionally, please display this transplant with
a bolded, capital �T� on the landscape plans and in the Tree Inventory table.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmoqen@fcqov.com
Topic: General
Comment Number: 2
Comment Originated: 10/03/2017
11/13/2017: Please see redlines regarding the included excerpts.
10/03/2017: Please include excerpts from the Trail Head Drainage Report to
show assumptions made for this area and demonstrate/state compliance with
these assumptions.
Comment Number: 4
Comment Originated: 10/03/2017
11/13/2017: I see now that easements are being dedicated. This comment is
left activate to ensure that proper easement area is dedicated once the LID
facilities being utilized are finalized.
10/03/2017: It appears that the plat is vacating existing easements that are
needed for infrastructure that that is currently in place. Are easements being
dedicated for either Tract H or Tract N?
Please clarify what easements are proposed and ensure that easements are
provided for existing and proposed public stormwater infrastructure as well as
for the proposed LID areas.
C�
Comment Number: 6 Comment Originated: 10/03/2017
10/03/2017: Please review the LID exhibit and show that those areas that are
being shown to be treated by a LID facility are actually reaching the LID facility
(see redlines).
Comment Number: 7 Comment Originated: 10/03/2017
11/13/2017: Please see redlines on the StormTech Isolator Row sizing as well
as bioretention sizing. Please contact me to discuss should there be any
questions.
10/03/2017: Please provide sizing calculations for the proposed LID facilities
so it can be ensured that adequate space is being allotted. Note that bioswales
are now treated as linear bioretention and need to be shown to have
appropriate volume within the swale.
Comment Number: 10 Comment Originated: 10/03/2017
11/13/2017: Please see updated drainage report redlines provided via PDF.
10/03/2017: Please see redlined utility plans and drainage report, provided via
PDF.
Comment Number: 11 Comment Originated: 11/13/2017
11/13/2017: From round 1 redline: Please show off-site grading. Are there
any off-site areas/flows to be accounted for?
Please be sure to address in the drainage report and show in the plans.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcqov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/26/2017
11/13/2017: The Erosion Control Materials will need to be submitted at time of
the first round of FDP. Please resubmit an Erosion Control Plans as the recently
received materials have comments and redlines that needed to be addressed
to meet City Criteria. Please submit an Erosion Control Plans as none were
included in the recently received materials and are required to be submitted to
meet City Criteria. Please submit an Erosion Control Escrow / Security
Calculation as none was inctuded in the recently received materials and is
required to be submitted to meet City Criteria. If you need clarification
concerning the Erosion Control Material Requirements or Comments presented
above please contact myself. Jesse Schlam (970) 224-6015
jschlam@fcgov.com
09/26/2017: Current Erosion Control Materials Submitted do not meet
requirements. The erosion control requirements are in the Stormwater Design
Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of
the erosion control requirements can be found at www.fcgov.com/eroison. The
Erosion Control Materials will need to be submitted at time of the first round of
FDP. Please resubmit an Erosion Control Plans as the recently received
materials have comments and redlines that needed to be addressed to meet
City Criteria. Please submit an Erosion Control Report as none was included in
the recently received materials and is required to be submitted to meet City
Criteria. Please submit an Erosion Control Escrow / Security Calculation as
none was included in the recently received materials and is required to be
submitted to meet City Criteria. The site disturbs more than 10,000 sq. ft. and
therefore Erosion and Sediment Control Materials need to be submitted. Based
�
upon the area of disturbance, State permits for stormwater will be required
since the site is over an acre and should be pulled before Construction
Activities begin. Erosion Control Materials will need to be produced, reviewed,
and accepted to meet City Erosion Control Criteria before Development
Agreement Language can be drafted. If you need clarification conceming the
Erosion Control Material Requirements or Comments presented above please
contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 12 Comment Originated: 11/13/2017
11/13/2017: Please revise the title to match the title on the Subdivision Plat.
Comment Number: 13
11/13/2017: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Originated: 11/13/2017
Comment Number: 14 Comment Originated: 11/13/2017
11/13/2017: Please revise the title to match the title on the Subdivision Plat.
Comment Number: 15 Comment Originated: 11/13/2017
11/13/2017: There are line over text issues. See redlines.
Comment Number: 16 Comment Originated: 11/13/2017
11/13/2017: There are te� over text issues. See redlines.
Comment Number: 17 Comment Originated: 11/13/2017
11/13/2017: Make sure the easement descriptions shown match what is shown
on the Subdivision Plat.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 11/13/2017
11/13/2017: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 11/13/2017
11/13/2017: Please revise the title to match the title on the Subdivision Plat.
Comment Number: 9 Comment Originated: 11/13/2017
11/13/2017: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 10
Comment Originated: 11/13/2017
11/13/2017: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 11 Comment Originated: 11/13/2017
11/13/2017: There are line over text issues. See redlines.
�
Topic: Plat
Comment Number: 1
11/13/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
10/05/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
Topic: Site Plan
Comment Number: 3 Comment Originated: 11/13/2017
11/13/2017: Please revise the title to match the title on the Subdivision Plat.
Comment Number: 4 Comment Originated: 11/13/2017
11/13/2017: The legal description is not necessary. The title & sub-title serves
as the legal description.
Comment Number: 5
11/13/2017: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
:�
Comment Number: 6
11/13/2017: There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkirtson@fcqov.com
Comment Originated: 10/05/2017
Comment Originated: 11/13/2017
Comment Originated: 11/13/2017
Topic: General
Comment Number: 5 Comment Originated: 11/14/2017
11/14/2017: The study a(and added memo) acknowledges LOS issues at
LemayNine and TimberlineNine. Please submit a variance request that
addresses these deficiencies in advance of the hearing.
10/03/2017: The Traffic Study has been received and reviewed.
Comment Number: 6
Comment Originated: 11/14/2017
11/14/2017: The study assumes signalization at Timberline and Vine in order
to meet LCUASS LOS requirements. The process to implement this mitigation
has begun; this development will be required to contribute a proportional share
toward the signalization project.
Comment Number: 7 Comment Originated: 11/14/2017
11/14/2017: We'll have striping comments at final.
�]
Contact: Nicole Hahn, 970-221-6820, nhahn@fcqov.com
Topic: General
Comment Number: 4 Comment Originated: 10/03/2017
10/03/2017: The study assumes signalization at Timberline and Vine in order
to meet LCUASS LOS requirements. The process to implement this mitigation
has begun; this development will be required to contribute a proportional share
toward the signalization project.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 09/25/2017
09/25/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com