Loading...
HomeMy WebLinkAboutTRAIL HEAD TRACTS F & G TOWNHOMES - PDP - PDP170035 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCity of Fort Callins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Coliins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.comidevelopmentreview � � � November 14, 2017 JR Engineering 2900 S College Ave Suite 3D Fort Collins, CO 80525 RE: Trail Head Tracts F& G Townhomes, PDP170035, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for the staff review meeting discussion. At the meeting, we can highlight whether any comments need to be resolved prior to the P&Z hearing. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clark Mapes, at 970-221-6225 or cmapes@fcgov.com. Comment Summarv: Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com Topic: General Comment Number: 4 Comment Originated: 10/03/2017 11/09/2017: There are still LID Basin labels shown on the site plan within the Vine-adjacent utility easements. 10/03/2017: No LID basins should be located within the Vine Drive utility easements or any ROW-adjacent utility easements. Comment Number: 14 Comment Originated: 11/13/2017 11/13/2017: Once the LID Basin labels are addressed, Engineering will be ready for the project to go to public hearing. Please note that there will likely be additional FDP level comments at the time of FDP review. Comment Number: 15 Comment Originated: 11/13/2017 11/13/2017: For FDP: Thank you for addressing the grade breaks on Green Lake Drive. The two 80 foot vertical curves which were added are just shy of the minimum 90 foot length requirement - please note that the connector has a 30 mph design speed. Comment Number: 16 Comment Originated: 11/13/2017 11/13/2017: For FDP: please include the side title block on the cover sheet for future use for revisions, etc. Contact: Sheri Langenberger, 970-221-6573, slanqenberqer@fcqov.com Topic: General Comment Number: 1 Comment Originated: 09/15/2017 09/15/2017: Unable to verify the if the TDRF paid is correct as the plat did not include the total acreage being platted. Assuming that is identified with the next submittal the fees will be checked at that time. Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General Comment Number: 6 Comment Originated: 11/08/2017 11/08/2017: It appears that Tree #6 on the tree mitigation plan also requires mitigation, so the total mitigation required should be 19. Please update plans accordingly. (this can be addressed after hearing if needed). Comment Number: 7 Comment Originated: 11/08/2017 11/08/2017: For reference: If this project is approved, Environmental Planning will have Development Agreement requirements related to the raptor nest and limits of development. Department: Internal Services Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 10/04/2017 10/03/2017: Construction shall comply with adopted codes as amended. Current adopted codes are: 2015 International Building Code (IBC) 2015 International Residential Code (IRC) 2015 International Energy Conservation Code (IECC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC� as amended by the State of Colorado 2017 National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com/building web page to view them. Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 129vu1t or 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Single Family; Duplex; Townhomes: 2015 IRC Chapter 11 or 2015 IECC. r � �+�r 2 Comment Number: 2 Comment Originated: 10/04/2017 10/03/2017: Building code and State statute CRS 9-5 requires projects provide accessible units. Please review the statute and provide a full accessibility plan with any building permit submittals. Department: Light And Power Contact: Clint Reetz, 970-221-6326, creetz@fcqov.com Topic: General Comment Number: 1 Comment Originated: 09/27/2017 09/27/2017: Light and Power currently provides both single and three phase power to surrounding developments. Electric facilities can be e�ended to serve this development. Comment Number: 2 Comment Originated: 09/27/2017 09/27/2017: Development charges, electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen t-development-fees/electric-development-fee-estimator Comment Number: 3 Comment Originated: 09/27/2017 09/27/2017: Multi family buildings are treated as commercial services; therefore a C-1 form must be filled out and submitted to Light and Power Engineering. Transformer and cable sizing will use the information on this form. C-1 forms can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf Comment Number: 5 Comment Originated: 09/27/2017 09/27/2017: You may contact FCU Light & Power, project engineering if you have questions. (970j 221-6700. You may reference Light & Power�s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FI NAL_18November2016_Amendment.pdf Comment Number: 6 Comment Originated: 11/13/2017 11/13/2017: If ROW footage on Vine is reduced and Light and Power existing facilities become stranded out of ROW, a Utilities easement may be required. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, '�lynxwiler@poudre-fire.org Topic: General Comment Number: 4 Comment Originated: 11/13/2017 11/13/2017: EMERGENCY ACCESS EASEMENT For clarity and consistency, the proposed fire lane should be relabeled as Emergency Access Easement (EAE), rather than an Emergency Vehicle Access (EVA). 3 Comment Number: 5 11/13/2017: ADDRESS POSTING AND FIRE LANE SIGNAGE To be resolved during FDP. Department: Planning Services Contact: Molly Roche, , mroche@fcqov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 11/13/2017 Comment Originated: 10/03/2017 11 /6/2017: Continued: Please clarify the origin of the additional notes under the General Landscape Notes. The most current City of Fort Collins General Landscape Notes should only include 13 notes. 10/03/2017: Please use the most current version of the City of Fort Collins General Landscape Notes (November 2015), which are available through City Forestry (Molly Roche � mrcohe@fcgov.com). Comment Number: 2 Comment Originated: 10/03/2017 11 /6/2017: Continued: The requested changes do not appear to have been implemented. The symbology for tree removal/retention is a bit confusing. In effort to simplify the symbols for tree removals, please show an `X' through all trees to be removed. Please omit the separate symbol used to show replacement trees, as these can be shown on the proposed landscape plans. 10/03/2017: In some instances, it appears as though the symbology for existing deciduous tree to be removed is inconsistent with the Tree Mitigation Matrix. Please ensure that symbology reflects what is shown in the Tree Mitigation Matrix (one example: Tree #6 is shown to REMOVE/REPLACE, but the symbol used is a bold tree, instead of the faded symbol). Comment Number: 4 11 /6/2017: Continued: Not addressed last round. 10/03/2017: Is the interior street, Green Lake Drive, public or private? Comment Originated: 10/03/2017 4 Comment Number: 5 11 /6/2017: Continued: Comment Originated: 10/03/2017 Please include symbols for stop signs and street lights in the legend. 10/03/2017: Please show location of any stop signs and street lights. Identify these fixtures with a distinct symbol. Space trees if needed as follows. Stop Signs: 20 feet from sign Street Light: 40 feet for canopy shade trees and 15 feet for ornamental trees - Note that this can be done in Final Plans, and is not a hearing item. Comment Number: 6 Comment Originated: 10/03/2017 11 /6/2017: Continued: Not addressed last round. 10/03/2017: Currently, Turf Type A is shown in the right-of-way strip. Please use irrigated turf within the right-of-way as well as update the Landscape Legend to display this detail. Comment Number: 7 11 /6/2017: Continued: Is the storm sewer line existing or proposed? Comment Originated: 10/03/2017 10/03/2017: Please include locations of any water or sewer lines on the landscape plan. Please adjust street tree locations to provide for proper tree/utility separation. 10� between trees and public water, sanitary, and storm sewer main lines 6� between trees and public water, sanitary, and storm sewer service lines 4� between trees and gas lines Comment Number: 10 11 /6/2017: Continued: Comment Originated: 10/03/2017 There are still quite a few redbuds proposed on the plans. To ensure survivability of total species on the project, please limit the number of this species on the plans and incorporate additional ornamental varieties, such as Japanese Tree Lilac and Thunderchild Crabapple. 10/03/2017: Species Selection -City Forestry suggests significantly reducing the number of Lindens (especially Boulevard Lindens) and increasing the number of Catalpa and Kentucky Coffeetree on the landscape plans. -Please consider using Red Barron Crabapple where Adirondack Crabapples are currently proposed. Red Barron will likely have better availability. 5 - Redbuds are not well adapted to Fort Collins soils. You may want to consider limiting the number of this species used on the plans. Comment Number: 12 11 /6/2017: Continued: Comment Originated: 10/03/2017 There appears to be two mitigation trees missing their label on landscape plan sheet 6. 10/03/2017: Please show all upsized mitigation trees labeled with a bolded, capital �M� on the landscape plans. Comment Number: 13 Comment Originated: 10/03/2017 11 /6/2017: Continued: Please add trees #53 and #57 to the transplanted/relocated tree note and show their new locations on the landscape plans. Please also label where specific trees are being relocated using their assigned inventory numbers. 10/03/2017: Please show transplanting locations for trees 23, 24, 25, 54, and 55. Add a note that says: Transplanting trees #23, 24, 25, 54, and 55 shall follow the recommendations of a qualified tree transplanting contractor in terms of size, staking, mulching, and irrigation. Additionally, please display this transplant with a bolded, capital �T� on the landscape plans and in the Tree Inventory table. Department: Stormwater Engineering Contact: Dan Mogen, 970-224-6192, dmoqen@fcqov.com Topic: General Comment Number: 2 Comment Originated: 10/03/2017 11/13/2017: Please see redlines regarding the included excerpts. 10/03/2017: Please include excerpts from the Trail Head Drainage Report to show assumptions made for this area and demonstrate/state compliance with these assumptions. Comment Number: 4 Comment Originated: 10/03/2017 11/13/2017: I see now that easements are being dedicated. This comment is left activate to ensure that proper easement area is dedicated once the LID facilities being utilized are finalized. 10/03/2017: It appears that the plat is vacating existing easements that are needed for infrastructure that that is currently in place. Are easements being dedicated for either Tract H or Tract N? Please clarify what easements are proposed and ensure that easements are provided for existing and proposed public stormwater infrastructure as well as for the proposed LID areas. C� Comment Number: 6 Comment Originated: 10/03/2017 10/03/2017: Please review the LID exhibit and show that those areas that are being shown to be treated by a LID facility are actually reaching the LID facility (see redlines). Comment Number: 7 Comment Originated: 10/03/2017 11/13/2017: Please see redlines on the StormTech Isolator Row sizing as well as bioretention sizing. Please contact me to discuss should there be any questions. 10/03/2017: Please provide sizing calculations for the proposed LID facilities so it can be ensured that adequate space is being allotted. Note that bioswales are now treated as linear bioretention and need to be shown to have appropriate volume within the swale. Comment Number: 10 Comment Originated: 10/03/2017 11/13/2017: Please see updated drainage report redlines provided via PDF. 10/03/2017: Please see redlined utility plans and drainage report, provided via PDF. Comment Number: 11 Comment Originated: 11/13/2017 11/13/2017: From round 1 redline: Please show off-site grading. Are there any off-site areas/flows to be accounted for? Please be sure to address in the drainage report and show in the plans. Contact: Jesse Schlam, 970-218-2932, jschlam@fcqov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 09/26/2017 11/13/2017: The Erosion Control Materials will need to be submitted at time of the first round of FDP. Please resubmit an Erosion Control Plans as the recently received materials have comments and redlines that needed to be addressed to meet City Criteria. Please submit an Erosion Control Plans as none were included in the recently received materials and are required to be submitted to meet City Criteria. Please submit an Erosion Control Escrow / Security Calculation as none was inctuded in the recently received materials and is required to be submitted to meet City Criteria. If you need clarification concerning the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com 09/26/2017: Current Erosion Control Materials Submitted do not meet requirements. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be found at www.fcgov.com/eroison. The Erosion Control Materials will need to be submitted at time of the first round of FDP. Please resubmit an Erosion Control Plans as the recently received materials have comments and redlines that needed to be addressed to meet City Criteria. Please submit an Erosion Control Report as none was included in the recently received materials and is required to be submitted to meet City Criteria. Please submit an Erosion Control Escrow / Security Calculation as none was included in the recently received materials and is required to be submitted to meet City Criteria. The site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment Control Materials need to be submitted. Based � upon the area of disturbance, State permits for stormwater will be required since the site is over an acre and should be pulled before Construction Activities begin. Erosion Control Materials will need to be produced, reviewed, and accepted to meet City Erosion Control Criteria before Development Agreement Language can be drafted. If you need clarification conceming the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations Comment Number: 12 Comment Originated: 11/13/2017 11/13/2017: Please revise the title to match the title on the Subdivision Plat. Comment Number: 13 11/13/2017: There are line over text issues. See redlines. Topic: Construction Drawings Comment Originated: 11/13/2017 Comment Number: 14 Comment Originated: 11/13/2017 11/13/2017: Please revise the title to match the title on the Subdivision Plat. Comment Number: 15 Comment Originated: 11/13/2017 11/13/2017: There are line over text issues. See redlines. Comment Number: 16 Comment Originated: 11/13/2017 11/13/2017: There are te� over text issues. See redlines. Comment Number: 17 Comment Originated: 11/13/2017 11/13/2017: Make sure the easement descriptions shown match what is shown on the Subdivision Plat. Topic: Landscape Plans Comment Number: 7 Comment Originated: 11/13/2017 11/13/2017: There are line over text issues. See redlines. Comment Number: 8 Comment Originated: 11/13/2017 11/13/2017: Please revise the title to match the title on the Subdivision Plat. Comment Number: 9 Comment Originated: 11/13/2017 11/13/2017: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 10 Comment Originated: 11/13/2017 11/13/2017: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 11 Comment Originated: 11/13/2017 11/13/2017: There are line over text issues. See redlines. � Topic: Plat Comment Number: 1 11/13/2017: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. 10/05/2017: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Topic: Site Plan Comment Number: 3 Comment Originated: 11/13/2017 11/13/2017: Please revise the title to match the title on the Subdivision Plat. Comment Number: 4 Comment Originated: 11/13/2017 11/13/2017: The legal description is not necessary. The title & sub-title serves as the legal description. Comment Number: 5 11/13/2017: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. :� Comment Number: 6 11/13/2017: There are line over text issues. See redlines. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkirtson@fcqov.com Comment Originated: 10/05/2017 Comment Originated: 11/13/2017 Comment Originated: 11/13/2017 Topic: General Comment Number: 5 Comment Originated: 11/14/2017 11/14/2017: The study a(and added memo) acknowledges LOS issues at LemayNine and TimberlineNine. Please submit a variance request that addresses these deficiencies in advance of the hearing. 10/03/2017: The Traffic Study has been received and reviewed. Comment Number: 6 Comment Originated: 11/14/2017 11/14/2017: The study assumes signalization at Timberline and Vine in order to meet LCUASS LOS requirements. The process to implement this mitigation has begun; this development will be required to contribute a proportional share toward the signalization project. Comment Number: 7 Comment Originated: 11/14/2017 11/14/2017: We'll have striping comments at final. �] Contact: Nicole Hahn, 970-221-6820, nhahn@fcqov.com Topic: General Comment Number: 4 Comment Originated: 10/03/2017 10/03/2017: The study assumes signalization at Timberline and Vine in order to meet LCUASS LOS requirements. The process to implement this mitigation has begun; this development will be required to contribute a proportional share toward the signalization project. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcqov.com Topic: General Comment Number: 1 Comment Originated: 09/25/2017 09/25/2017: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com u 0 10