HomeMy WebLinkAboutPROSPECT SPORTS CLUB - PDP230009 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDY
PROSPECT SPORTS
INTERMEDIATE TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JULY 2023
Prepared for:
RB + B Architects
315 E. Mountain Avenue, Suite 100
Fort Collins, CO 80524
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project #2301
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 2
Existing Operation ........................................................................................................... 6
Pedestrian Facilities ........................................................................................................ 6
Bicycle Facilities .............................................................................................................. 6
Transit Facilities .............................................................................................................. 7
III. PROPOSED DEVELOPMENT ................................................................................. 8
Trip Generation ............................................................................................................... 8
Trip Distribution/Trip Assignment .................................................................................... 8
Background Traffic Projections ..................................................................................... 13
Total Traffic Projections ................................................................................................. 13
Signal Warrants ............................................................................................................. 13
Geometry ...................................................................................................................... 15
Operation Analysis ........................................................................................................ 15
Pedestrian Level of Service ........................................................................................... 15
Bicycle Level of Service ................................................................................................ 19
Transit Level of Service ................................................................................................. 19
IV. CONCLUSIONS .................................................................................................... 20
LIST OF TABLES
1. Current Afternoon Peak Hour Operation ................................................................... 7
2. Trip Generation ....................................................................................................... 10
3. Short Range (2028) Background Peak Hour Operation .......................................... 17
4. Short Range (2028) Total Peak Hour Operation ..................................................... 18
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic fo the Street (7:15-8:15am & 4:15-5:15pm) ...................... 5
4. Recent Peak Hour Traffic fo the Land Use (8:00-9:00am & 5:00-6:00pm) ................ 5
5. Site Plan .................................................................................................................... 9
6. Trip Distribution ....................................................................................................... 11
7. Site Generated Peak Hour Traffic ........................................................................... 12
8. Short Range (2028) Background Peak Hour Traffic ................................................ 14
9. Short Range (2028) Total Peak Hour Traffic ........................................................... 14
10. Short Range (2028) Geometry ................................................................................ 16
APPENDICES
A. Base Assumptions Form
B. Recent Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor Vehicle
LOS Standards (Intersections)
D. Peak Hour Signal Warrants
E. Short Range (2028) Background Peak Hour Operation
F. Short Range (2028) Total Peak Hour Operation
G. Pedestrian/Bicycle Level of Service Worksheets
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 1
I. INTRODUCTION
This Intermediate transportation impact study (ITIS) addresses the capacity,
geometric, and control requirements for the proposed Prospect Sports facility. The
proposed Prospect Sports site is located in the southwest quadrant of the Prospect/Sharp
Point intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the architect
(RB+B Architects), the project civil engineering consultant (United Civil Group), and Fort
Collins Traffic Engineering. This study generally conforms to the format set forth in the Fort
Collins ITIS Guidelines in the “Larimer County Urban Area Street Standards” (LCUASS). A
scoping discussion was held with the Fort Collins Traffic Engineering staff. The
Transportation Impact Study Base Assumptions form and related documents are provided
in Appendix A. The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
This TIS is a revision of the “Prospect Sports Intermediate Transportation Impact
Study,” dated May 2023. It addresses City of Fort Collins staff comments and
conversations with the project team and City staff.
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Prospect Sports is shown in Figure 1. It is important that a
thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial and institutional (Larimer County
Detention Center/related facilities and Liberty Commons School). There are commercial
uses to the north, south, and west of the site. The center of Fort Collins lies to the west
of the proposed Prospect Sports site.
Streets
The primary streets near the Prospect Sports site are Prospect Road and Sharp
Point Drive. Figure 2 shows a schematic of the existing geometry at the Prospect/Sharp
Point intersection.
Prospect Road is to the north (adjacent to) of the proposed Prospect Sports site.
It is an east-west street classified as a four-lane arterial on the Fort Collins Master Street
Plan. Currently, Prospect Road has a two-lane cross section, plus a center median lane
in this area. There is a design to expand Prospect Road to a four-lane facility. However,
the funding for this infrastructure improvement has not been secured. At the
Prospect/Sharp Point intersection, Prospect Road has eastbound and westbound left-
turn lanes, one through lane in each direction, and eastbound and westbound right-turn
lanes. The Prospect/Sharp Point intersection has stop sign control on Sharp Point Drive.
The posted speed limit on Prospect Road is 40 mph in this area.
Sharp Point Drive is east of (adjacent to) the proposed Prospect Sports site. It is
a north-south street classified as a collector street on the Fort Collins Master Street Plan.
Currently, Sharp Point Drive has a two-lane cross section with parking on the east side
of the street. At the Prospect/Sharp Point intersection, Sharp Point Drive is set up with
all northbound and southbound movements in a single lane. The posted speed on Sharp
Point Drive is 25 mph.
Existing Traffic
Recent morning and afternoon peak hour traffic volumes at the Prospect/Sharp
Point intersection are shown in Figure 3. The counts at the Prospect/Sharp Point
intersection were obtained in January and May 2023. Raw traffic data is provided in
Appendix B. The counts shown are for the morning and afternoon peak hours of the
street, which are 7:15-8:15am and 4:15-5:15pm, respectively. However, the proposed
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
Prospect RoadTimberline RoadMidpoint
Drive ProspectParkway Sharp Point DriveSCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 4
Prospect
SharpPoint- Denotes Lane
STOP
STOP
865' Lane
No Taper
80' Lane plus
100' Transition
RECENT PEAK HOUR TRAFFIC OF
THE STREET (7:15-8:15 AM & 4:15-5:15 PM)Figure 3
Figure 4
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 5
Prospect
SharpPoint20/150/0111/10817/2
724/1002
79/38
103/77
1035/959
7/20/90/04/25RECENT PEAK HOUR TRAFFIC OF THE
LAND USE (8:00-9:00 AM & 5:00-6:00 PM)
Prospect
SharpPoint16/160/0107/9623/1
638/990
75/38
98/55
766/738
7/12/40/16/11AM/PM
AM/PM
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 6
Prospect Sports facility has specific peak hours of operation between 8:00-9:00am and
5:00-6:00pm. Therefore, the morning and afternoon peak hours of the Prospect Sports
facility (8:00-9:00am & 5:00-6:00pm) are shown in Figure 4. The morning and afternoon
peak hours of the Prospect Sports facility (8:00-9:00am & 5:00-6:00pm) will be used in all
subsequent analyses.
Existing Operation
The Prospect/Sharp Point intersection was evaluated, and the peak hour operation
is displayed in Table 1. Calculation forms are provided in Appendix C. The
Prospect/Sharp Point intersection is currently operating acceptably with existing control
and geometry in the morning and afternoon peak hours. The intersection was evaluated
using techniques provided in the Highway Capacity Manual (HCM), 6th Edition. A
description of level of service for unsignalized intersections from the Highway Capacity
Manual (HCM), 6th Edition and a table showing the Fort Collins Motor Vehicle LOS
Standards (Intersections) are also provided in Appendix C. Acceptable operation is
considered to be at level of service D overall and level of service F for any approach leg at
unsignalized intersections. In such areas, it is expected that there would be substantial
delays to the minor street movements at unsignalized intersections during the afternoon
peak hours. This is considered to be normal and acceptable in urban areas.
Pedestrian Facilities
There are sidewalks adjacent to all streets within the pedestrian influence area.
Many of the street cross section elements were built prior to the current standards.
Therefore, some of the sidewalks may be considered to be substandard. The sidewalk
along the west side of Sharp Point Drive is a meandering, four foot wide sidewalk with a
landscaped parkway between the sidewalk and the street. The Poudre Trail multimodal
path is adjacent to the east side of Sharp Point Drive. The sidewalk along the south side
of Prospect Road is a meandering, four foot wide sidewalk with a landscaped parkway
between the sidewalk and the street. The sidewalk along the north side of Prospect Road
is a four foot wide sidewalk with a landscaped parkway between the sidewalk and the
street. The other sidewalks in the area are generally four feet wide, with some having
landscaped parkways and others being directly adjacent to the street.
Bicycle Facilities
There are bicycle lanes along Prospect Road, east of Sharp Point Drive. These
bicycle lanes connect to the Poudre Trail. Sharp Point Drive, Midpoint Drive, and
Prospect Parkway are all collector streets that were constructed without bicycle lanes
prior to the current City of Fort Collins standards. Bicycles can share the roadway with
vehicles on these streets.
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 7
Transit Facilities
Currently, this area of Fort Collins is served by Transfort Route 18. Route 18
operates along Prospect Road, Midpoint Drive, and Sharp Point Drive. There is a transit
stop on Sharp Point Drive, approximately 400 feet south of the Prospect Sports site.
There is also a transit stop along Prospect Road, approximately 450 feet west of the
Prospect Sports site.
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Sharp Point
(stop sign)
(7:15-8:15am & 4:15-5:15pm)
NB LT/T/RT D E (41.9 secs.)
SB LT/T/RT C F (227.8 secs.)
EB LT B B
WB LT B B
OVERALL A A
Prospect/Sharp Point
(stop sign)
(8:00-9:00am & 5:00-6:00pm)
NB LT/T/RT C E (47.7 secs.)
SB LT/T/RT E (42.8 secs.) F (125.6 secs.)
EB LT A A
WB LT A B
OVERALL A A
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 8
III. PROPOSED DEVELOPMENT
The Prospect Sports facility is a recreational center development emphasizing
basketball and volleyball sports. There will be other sports facilities such as weight room,
etc. Prospect Sports will be open from 8:00am-9:00pm. During the morning and early
afternoon, the facility will be open for general use. The assumed morning peak hour for
the Prospect Sports facility will be from 8:00-9:00am. In the late afternoon and evening,
there are two practice time slots: one from 3:30-5:30pm and one from 6:00-8:30pm. This
makes 5:00-6:00pm as the peak hour of the facility when patrons will be leaving and
arriving at the facility. Figure 5 shows a site plan of the Prospect Sports facility. The short
range analysis (Year 2028) includes development of the Prospect Sports site and an
appropriate increase in background traffic due to normal growth and other potential
developments in the area. The site plan shows that the Prospect Sports facility will have
access to/from the existing driveway to the south. The Prospect/ Prospect Parkway
intersection to the west is signalized.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 11th Edition, ITE is customarily used to estimate the trips that
would be generated by the proposed/expected uses at a site. A trip is defined as a one-way
vehicle movement from origin to destination. However, since the Prospect Sports
development is a specialized recreational facility, trip generation was estimated based upon
the different sports offered at the Prospect Sports facility. These were assumed to be
basketball/volleyball courts, spectators, weight room, and other general areas of the facility.
This trip generation estimation is the same that was used in the “Prospect Sports Parking
Analysis,” dated April 28, 2023. Table 2 shows the expected trip generation on a morning
and afternoon peak hour basis. The trip generation of the Prospect Sports development
resulted in 390 daily trip ends, 35 morning peak hour trip ends, and 121 afternoon peak hour
trip ends.
Trip Distribution/Trip Assignment
Trip distribution for the Prospect Sports facility was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions in Fort Collins, and
engineering judgment. Figure 6 shows the trip distribution for the short range (2028)
analysis future. The trip distribution was agreed to by City of Fort Collins staff in the
scoping discussions.
Trip assignment is how the generated and distributed trips are expected to be loaded
on the street system. The assigned trips are the resultant of the trip distribution process.
Figure 7 shows the site generated morning and afternoon peak hour traffic
SCALE: 1"=100'
SITE PLAN Figure 5
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 9
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 10
TABLE 2
Trip Generation
Use AWDTE AM Peak Hour PM Peak Hour
Trips In Out In Out
Basketball/Volleyball Courts 306 15 2 60 60
Spectators 60 0 0 15 15
Weight Room 102 10 1 15 15
Concessions 82 10 1 10 10
Facility Employees 10 2 0 3 2
Subtotal 560 37 4 103 102
30% reduction to represent typical scenario
(afternoon/evening only) 102 N/A N/A 31 31
15% reduction for carsharing & alternative
modes (ped, bike, transit, etc.) 68 6 0 11 11
Total 390 31 4 61 60
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
P r o s p e c t R o a d
Midpoint
Drive ProspectParkway Sharp Point Drive7 0 %
20%10%SCALE: 1"=600'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 11
SITE GENERATED
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 12
Prospect
SharpPoint4/54
0/6
3/628/55Site
Access
22/43
6/12
3/421/12AM/PM
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 13
assignment at the Prospect/Sharp Point and Sharp Point/Site Access intersections. It is
important to note that all of the trips to/from the west of Prospect Road were assigned to the
Prospect/Sharp Point intersection, even though there is access to the signal at the
Prospect/Prospect Parkway intersection. It is likely that drivers will find that using the signal
at the Prospect/Prospect Parkway intersection would be the more efficient route.
Background Traffic Projections
Figure 8 shows the short range (2028) background traffic projections at the
Prospect/Sharp Point intersection. Background traffic projections for the short range
future horizon were obtained by increasing traffic volumes by approximately two percent
per year. The background traffic growth was agreed to by City of Fort Collins staff in the
scoping discussions.
Total Traffic Projections
Figure 9 shows the short range (2028) total (site plus background) morning and
afternoon peak hour traffic at the Prospect/Sharp Point and Sharp Point/Site Access
intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location until such time
that signal installation warrants are met according to the Manual on Uniform Traffic
Control Devices. For the roads in the vicinity of the Prospect Sports site, four hour and/or
eight hour signal warrants are applicable. These warrants require much data and are
applied when the traffic is actually on the area road system. It is acknowledged that peak
hour signal warrants should not be applied, but since the peak hour forecasts are readily
available in a traffic impact study, it is reasonable to use them to estimate whether other
signal warrants may be met. If peak hour signal warrants will not be met at a given
intersection, it is reasonable to conclude that it is not likely that other signal warrants would
be met. If peak hour signal warrants are met, it merely indicates that further evaluation
should occur in the future as the development occurs. However, a judgment can be made
that some intersections may meet other signal warrants.
The Prospect/Sharp Point stop sign controlled intersection will meet peak hour signal
warrants in the short range (2028) background and total futures, since the minor street
approaches have all movements combined into a single lane. Peak hour signal warrants
are provided in Appendix D. The Prospect/Sharp Point intersection is approximately 1060
feet east of the Prospect/Prospect Parkway signalized intersection. This distance does not
meet City of Fort Collins signal spacing criteria.
SHORT RANGE (2028) BACKGROUND
PEAK HOUR TRAFFIC Figure 8
Figure 9
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 14
SHORT RANGE (2028) TOTAL
PEAK HOUR TRAFFIC 18/180/0118/10625/1
704/1093
83/42
108/61
846/814
8/12/40/17/12Prospect
SharpPoint21/600/0119/11825/1
704/1093
105/85
114/73
846/814
8/12/40/17/12183/978/64
4/10
6/9132/11436/62Site
Access
AM/PM
AM/PM
Prospect
SharpPoint183/974/10
4/4
3/3132/1148/7Site
Access
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 15
Geometry
Figure 10 shows a schematic of the likely short range (2028) geometry. Through
discussions with City staff, it was determined that there should be an exclusive northbound
right-turn lane approaching Prospect Road. No additional auxiliary lanes will be required
at the Prospect/Sharp Point and Sharp Point/Site Access intersections. There is a design
to expand Prospect Road to a four-lane facility in the near future (2025). However, the
design and funding for this infrastructure improvement has not been secured.
Operation Analysis
Operation analyses were performed at the Prospect/Sharp Point and Sharp Point/
Site Access intersections. The operation analyses were conducted for the short range
future, reflecting year 2028 conditions. The analyses were conducted with both the existing
geometry (two-lane on Prospect Road) and a four-lane facility on Prospect Road. In addition
to this, the Prospect/Sharp Point intersection was analyzed with signal control for
informational purposes. As mentioned earlier, there is a design to expand Prospect Road
to a four-lane facility in the near future (2025). This design may include signalization of
the Prospect/Sharp Point intersection.
Using the traffic volumes shown in Figure 8, the Prospect/Sharp Point intersection
operates in the short range (2028) background traffic future as indicated in Table 3.
Calculation forms for these analyses are provided in Appendix E. The Prospect/Sharp Point
intersection will meet the Fort Collins operational criteria with stop sign control and
recommended geometry in the morning and afternoon peak hours.
Using the traffic volumes shown in Figure 9, the Prospect/Sharp Point and Sharp
Point/Site Access intersections operate in the short range (2028) total traffic future as
indicated in Table 4. Calculation forms for these analyses are provided in Appendix F. As
with the background traffic, the key intersections will meet the Fort Collins operational
criteria with stop sign control and recommended geometry in the morning and afternoon
peak hours. However, the delay to the northbound left turns is significant. Drivers have
the ability to access the signalized Prospect/Prospect Parkway intersection to the west.
Pedestrian Level of Service
Appendix G shows a map of the area that is within 1320 feet of the Prospect Sports
site. The Prospect Sports site is located within an area termed as “Transit Corridor,”
which sets the level of service threshold at LOS C for all measured factors, except for
Directness and Security which are LOS B. There will be six pedestrian destinations within
1320 feet of the Prospect Sports site. These are: 1) Poudre Trail to the east of the site,
2) the commercial uses to the south of the site, 3) Larimer County Detention Center to
the southwest of the site, 4) the commercial uses to the west of the site, 5) the commercial
uses to the northwest of the site, and 6) the commercial uses to the north of the site.
SHORT RANGE (2028) GEOMETRY Figure 10
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 16
Prospect
- Denotes Lane
STOP
STOP
SharpPointSite
Access STOP
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 17
TABLE 3
Short Range (2028) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Sharp Point
(stop sign)
(two-lane on Prospect Road)
NB LT/T E (41.9 secs.) E (49.3 secs.)
NB RT C E (48.4 secs.)
NB APPROACH C E (48.5 secs.)
SB LT/T/RT F (58.5 secs.) F (316.5 secs.)
EB LT B B
WB LT B B
OVERALL A A
Prospect/Sharp Point
(stop sign)
(four-lane on Prospect Road)
NB LT/T D E (41.3 secs.)
NB RT B C
NB APPROACH B C
SB LT/T/RT D F (52.1 secs.)
EB LT B B
WB LT B B
OVERALL A A
Sharp Point/Site Access
(stop sign)
EB LT/RT B A
NB LT/T A A
OVERALL A A
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 18
TABLE 4
Short Range (2028) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect/Sharp Point
(stop sign)
(two-lane on Prospect Road)
NB LT/T E (44.4 secs.) F (107.0 secs.)
NB RT C F (55.3 secs.)
NB APPROACH C F (72.7 secs.)
SB LT/T/RT F (58.5 secs.) F (506.1 secs.)
EB LT B B
WB LT B B
OVERALL A A
Prospect/Sharp Point
(stop sign)
(four-lane on Prospect Road)
NB LT/T D F (74.3 secs.)
NB RT B C
NB APPROACH C E (36.9 secs.)
SB LT/T/RT D F (59.9 secs.)
EB LT B B
WB LT B B
OVERALL A A
Prospect/Sharp Point
(signal)
(four-lane on Prospect Road)
EB LT A B
EB T B B
EB RT B B
EB APPROACH B B
WB LT A B
WB T B B
WB T/RT B B
WB APPROACH B B
NB LT/T C D
NB RT C C
NB APPROACH C C
SB LT/T/RT C C
OVERALL B B
Sharp Point/Site Access
(stop sign)
EB LT/RT B A
NB LT/T A A
OVERALL A A
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 19
There are sidewalks along all streets in the area of the Prospect Sports site. Sidewalks
will be built within the development that will connect to existing nearby sidewalks along
Sharp Point Drive and Prospect Road. As mentioned earlier, many of the street cross
section elements were built prior to the current standards. Therefore, some of the
sidewalks may be considered to be substandard.
• Directness – The distance ratio to all pedestrian destinations is less than 1.2 (LOS
A) using the existing sidewalk system, except for destination #6. The distance
ratio to destination #6 is approximately 2.0 since a pedestrian crossing of Prospect
Road is necessary. The nearest pedestrian crossing of Prospect Road is the
Poudre Trail underpass. However, the number of pedestrians desiring to go
to/from destination #6 is likely to be nominal.
• Continuity – The sidewalk system to all destination areas has no breaks or gaps.
However, most of the sidewalks were built prior to current standards and some are
built directly adjacent to the streets with no landscaped parkways. Nevertheless,
at least LOS C is achieved for all destination areas.
• Street Crossings – There is one destination area that has a signalized crossing
in their route. In order to get to destination #5, there is a pedestrian/bicycle signal
at the Prospect/Prospect Parkway intersection. In order to get to destination #6, a
pedestrian would likely use the Poudre Trail underpass of Prospect Road. All other
destination areas only required a crossing of the minor street. At least LOS B can
be achieved to all the destination areas.
• Visual Interest and Amenity – The visual interest and amenity will be acceptable
at LOS C for destination areas 2 through 6. For the destination area #1, the LOS
will be A.
• Security – The security is acceptable at LOS B for all destination areas since most
sidewalks are not adjacent to high volume streets and some are separated by
landscaped parkways. The sidewalks along Prospect Road are separated by
landscaped parkways.
Bicycle Level of Service
Appendix G shows a map of the area that is within 1320 feet of the Prospect Sports
development. There will be one bicycle destination within 1320 feet of the Prospect
Sports development. This is: 1) the Poudre Trail to the east of the site. The Bicycle LOS
Worksheet is provided in Appendix G. The base level of service is C and is B for the
bicycle destination.
Transit Level of Service
Currently, this area of Fort Collins is served by Transfort Route 18. Route 18
operates along Prospect Road, Midpoint Drive, and Sharp Point Drive. There is a transit
stop on Sharp Point Drive, approximately 400 feet south of the Prospect Sports site.
There is also a transit stop along Prospect Road, approximately 450 feet west of the
Prospect Sports site.
DELICH Prospect Sports ITIS, July 2023 ASSOCIATES Page 20
IV. CONCLUSIONS
This study assessed the impacts of the Prospect Sports on the street system in the
vicinity of the proposed development in the short range (2028) future. As a result of this
analysis, the following is concluded:
- The development of the Prospect Sports is feasible from a traffic engineering
standpoint. At full development, Prospect Sports will generate approximately 390
daily trip ends, 35 morning peak hour trip ends, and 121 afternoon peak hour trip
ends.
- The Prospect/Sharp Point intersection is currently operating acceptably with
existing control and geometry in the morning and afternoon peak hours.
- The Prospect/Sharp Point stop sign controlled intersection will meet peak hour signal
warrants in the short range (2028) background and total futures, since the minor
street approaches have all movements combined into a single lane. The
Prospect/Sharp Point intersection is approximately 1060 feet east of the Prospect/
Prospect Parkway signalized intersection. This distance does not meet City of Fort
Collins signal spacing criteria.
- In the short range (2028) future, given development of the Prospect Sports and an
increase in background traffic, the key intersections will operate acceptably during
the morning and afternoon peak hours.
- Figure 10 shows a schematic of the likely short range (2028) geometry. Through
discussions with City staff, it was determined that there should be an exclusive
northbound right-turn lane approaching Prospect Road. No additional auxiliary
lanes will be required at the Prospect/Sharp Point and Sharp Point/Site Access
intersections. There is a design to expand Prospect Road to a four-lane facility in
the near future (2025). However, the design and funding for this infrastructure
improvement has not been secured.
- Acceptable level of service is achieved for bicycle and transit modes based upon the
measures in the multi-modal transportation guidelines and the Fort Collins
Pedestrian Plan. Many of the street cross section elements were built prior to the
current standards.
APPENDIX A
Page 4-34 Larimer County Urban Area Street Standards – Repealed and Reenacted April 1, 2007
Adopted by Larimer County, City of Loveland, City of Fort Collins
Attachment “A”
Transportation Impact Study
Base Assumptions
Project Information
Project Name Prospect Sports
Project Location SW Quadrant of the Prospect/Sharp Point intersection
TIS Assumptions
Type of Study Full: Intermediate: Yes
MTIS: Memo:
Study Area Boundaries North: Prospect Road South: Site Access
East: Sharp Point Drive West: Sharp Point Drive
Study Years Short Range: 2028 Long Range: N/A
Future Traffic Growth Rate 2%/year
Study Intersections 1. All access drives 5.
2. Prospect/Sharp Point 6.
3. 7.
4. 8.
Time Period for Study AM: 7:00-9:00 PM: 4:00-6:00 Sat Noon: N/A
Trip Generation Rates (see
attached) See Attached
Trip Adjustment Factors Passby: N/A Captive Market: Per
Parking Analysis
Trip Distribution (see attached) See Attached
Mode Split Assumptions Per Parking Analysis
Committed Roadway Improvements City Provide
Other Traffic Studies None Known
Areas Requiring Special Study
Date: _______July 18, 2023________________________________________
Traffic Engineer: _______Delich Associates_____________________________________
Local Entity Engineer: __________________________________________________________
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
Prospect RoadTimberline RoadMidpoint
Drive ProspectParkway Sharp Point DriveSCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 3
SCALE: 1"=100'
SITE PLAN Figure 5
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 9
TABLE 2
Trip Generation
Use AWDTE AM Peak Hour PM Peak Hour
Trips In Out In Out
Basketball/Volleyball Courts 306 15 2 60 60
Spectators 60 0 0 15 15
Weight Room 102 10 1 15 15
Concessions 82 10 1 10 10
Facility Employees 10 2 0 3 2
Subtotal 560 37 4 103 102
30% reduction to represent typical scenario
(afternoon/evening only) 102 N/A N/A 31 31
15% reduction for carsharing & alternative
modes (ped, bike, transit, etc.) 68 6 0 11 11
Total 390 31 4 61 60
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
P r o s p e c t R o a d
Midpoint
Drive ProspectParkway Sharp Point Drive7 0 %
20%10%SCALE: 1"=600'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES Prospect Sports ITIS, July 2023
Page 11
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5/16/2023 & 1/25/2023 Observer:Vickie
Day: Tuesday & Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Prospect/Sharp Point
S = straight
L = left turn
Time Northbound: Sharp Point Southbound: Sharp Point Total Eastbound: Prospect Westbound: Prospect Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:00 2 0 22 24 1 0 1 2 26 1 155 22 178 14 233 2 249 427 453
7:15 3 0 32 35 0 0 2 2 37 3 192 18 213 22 282 2 306 519 556
7:30 4 0 28 32 0 0 1 1 33 3 175 14 192 19 251 1 271 463 496
7:45 6 0 25 31 0 0 0 0 31 7 187 30 224 34 277 2 313 537 568 #
8:00 7 0 26 33 0 0 1 1 34 4 170 17 191 28 225 2 255 446 480 #
8:15 2 0 32 34 1 0 1 2 36 7 161 25 193 31 182 2 215 408 444 #
8:30 3 0 28 31 1 0 2 3 34 5 152 18 175 21 175 1 197 372 406 #
8:45 4 0 21 25 0 0 2 2 27 7 155 15 177 18 184 2 204 381 408 #
7:15-8:15 20 0 111 131 0 0 4 4 135 17 724 79 820 103 1035 7 1145 1965 2100
PHF 0.71 n/a 0.87 0.94 n/a n/a 0.5 0.5 0.91 0.61 0.94 0.66 0.92 0.76 0.92 0.88 0.91 0.91 0.92
4:00 2 0 26 28 0 0 4 4 32 3 299 15 317 17 229 0 246 563 595
4:15 2 0 28 30 0 0 4 4 34 1 231 6 238 15 244 1 260 498 532
4:30 2 0 27 29 4 0 4 8 37 0 226 8 234 28 275 1 304 538 575
4:45 8 0 23 31 2 0 9 11 42 1 237 10 248 12 229 0 241 489 531 #
5:00 3 0 30 33 3 0 8 11 44 0 308 14 322 22 211 0 233 555 599 #
5:15 3 0 19 22 0 0 2 2 24 0 257 7 264 10 166 1 177 441 465 #
5:30 5 0 29 34 1 0 1 2 36 1 245 9 255 5 191 0 196 451 487 #
5:45 5 0 18 23 0 1 0 1 24 0 180 8 188 18 170 0 188 376 400 #
4:15-5:15 15 0 108 123 9 0 25 34 157 2 1002 38 1042 77 959 2 1038 2080 2237
PHF 0.47 n/a 0.9 0.93 0.56 n/a 0.69 0.77 0.89 0.5 0.81 0.68 0.81 0.69 0.87 0.5 0.85 0.94 0.93
DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061TABULAR SUMMARY OF VEHICLE COUNTSDate: 5/16/2023 & 1/25/2023 Observer: VickieDay: Tuesday & WednesdayJurisdiction: Fort CollinsR = right turnIntersection: Prospect/Sharp PointS = straightL = left turnTime Northbound: Sharp Point Southbound: Sharp Point Total Eastbound: Prospect Westbound: Prospect Total TotalBegins L S R Total L S R Total north/south L S R Total L S R Total east/west All7:002022241012261 155 2217814 233 2249427 4537:153032350022373 192 1821322 282 2306519 5567:304028320011333 175 1419219 251 1271463 4967:456025310000317 187 3022434 277 2313537 568#8:007026330011344 170 1719128 225 2255446 480#8:152032341012367 161 2519331 182 2215408 444#8:303028311023345 152 1817521 175 1197372 406#8:454021250022277 155 1517718 184 2204381 408#8:00-9:00 16 0 107 123 2 0 6 813123 638 75 736 98 766 7 8711607 1738PHF 0.57 n/a 0.84 0.9 0.5 n/a 0.75 0.67 0.91 0.82 0.94 0.75 0.95 0.79 0.85 0.88 0.85 0.9 0.914:002026280044323 299 1531717 229 0246563 5954:152028300044341 231 623815 244 1260498 5324:302027294048370 226 823428 275 1304538 5754:4580233120911421 237 1024812 229 0241489 531#5:0030303330811440 308 1432222 211 0233555 599#5:153019220022240 257 726410 166 1177441 465#5:305029341012361 245 92555 191 0196451 487#5:455018230101240 180 818818 170 0188376 400#5:00-6:00 16 0 96 112 4 1 11 161281 990 38 1029 55 738 1 7941823 1951PHF 0.8 n/a 0.8 0.82 0.33 0.25 0.34 0.36 0.73 0.25 0.8 0.68 0.8 0.63 0.87 0.25 0.85 0.82 0.81
APPENDIX C
HCM 6th TWSC Recent AM
3: Sharp Point Drive & Prospect Road 7:15-8:15 AM
Scenario 1 05/31/2023 Synchro 11 Light Report
recent am.syn
Intersection
Int Delay, s/veh 2.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 17 724 79 103 1035 7 20 0 111 0 0 4
Future Vol, veh/h 17 724 79 103 1035 7 20 0 111 0 0 4
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 ------
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 18 787 86 112 1125 8 22 0 121 0 0 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 1133 0 0 873 0 0 2178 2180 787 2276 2258 1125
Stage 1 ------823823-1349 1349 -
Stage 2 ------1355 1357 - 927 909 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 617 - - 773 - - 33 46 392 28 41 250
Stage 1 ------368388-186219-
Stage 2 ------184217-322354-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 617 - - 773 - - 28 38 392 17 34 250
Mov Cap-2 Maneuver ------100120-1734-
Stage 1 ------357377-181187-
Stage 2 ------155186-216344-
Approach EB WB NB SB
HCM Control Delay, s 0.2 0.9 32.1 19.7
HCM LOS D C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 271 617 - - 773 - - 250
HCM Lane V/C Ratio 0.525 0.03 - - 0.145 - - 0.017
HCM Control Delay (s) 32.1 11 - - 10.4 - - 19.7
HCM Lane LOS D B - - B - - C
HCM 95th %tile Q(veh) 2.8 0.1 - - 0.5 - - 0.1
HCM 6th TWSC Recent PM
3: Sharp Point Drive & Prospect Road Peak Hour of the Street (4:15-5:15 PM)
Scenario 1 02/27/2023 Synchro 11 Light Report
recent pm.syn
Intersection
Int Delay, s/veh 6.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 1002 38 77 959 2 15 0 108 9 0 25
Future Vol, veh/h 2 1002 38 77 959 2 15 0 108 9 0 25
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 ------
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 2 22222222222
Mvmt Flow 2 1077 41 83 1031 2 16 0 116 10 0 27
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 1033 0 0 1118 0 0 2293 2280 1077 2357 2319 1031
Stage 1 ------1081 1081 - 1197 1197 -
Stage 2 ------1212 1199 - 1160 1122 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 673 - - 625 - - 28 40 266 25 38 283
Stage 1 ------264294-227259-
Stage 2 ------222259-238281-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 673 - - 625 - - 23 35 266 13 33 283
Mov Cap-2 Maneuver ------105131-1333-
Stage 1 ------263293-226225-
Stage 2 ------174225-134280-
Approach EB WB NB SB
HCM Control Delay, s 0 0.9 41.9 227.8
HCM LOS E F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 224 673 - - 625 - - 44
HCM Lane V/C Ratio 0.59 0.003 - - 0.132 - - 0.831
HCM Control Delay (s) 41.9 10.4 - - 11.6 - - 227.8
HCM Lane LOS E B - - B - - F
HCM 95th %tile Q(veh) 3.3 0 - - 0.5 - - 3.3
HCM 6th TWSC Recent AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM
Scenario 1 05/31/2023 Synchro 11 Light Report
recent am 8-9.syn
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 638 75 98 766 7 16 0 107 2 0 6
Future Vol, veh/h 23 638 75 98 766 7 16 0 107 2 0 6
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 ------
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 25 701 82 108 842 8 18 0 118 2 0 7
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 850 0 0 783 0 0 1817 1817 701 1909 1891 842
Stage 1 ------751751-1058 1058 -
Stage 2 ------1066 1066 - 851 833 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 788 - - 835 - - 60 78 439 52 70 364
Stage 1 ------403418-272301-
Stage 2 ------269299-355384-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 788 - - 835 - - 52 66 439 33 59 364
Mov Cap-2 Maneuver ------144163-3359-
Stage 1 ------390405-263262-
Stage 2 ------230260-252372-
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.1 21.8 42.8
HCM LOS C E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 347 788 - - 835 - - 104
HCM Lane V/C Ratio 0.39 0.032 - - 0.129 - - 0.085
HCM Control Delay (s) 21.8 9.7 - - 9.9 - - 42.8
HCM Lane LOS C A - - A - - E
HCM 95th %tile Q(veh) 1.8 0.1 - - 0.4 - - 0.3
HCM 6th TWSC Recent PM
3: Sharp Point Drive & Prospect Road Peak Hour of the Land Use (5-6:00 PM)
Scenario 1 02/27/2023 Synchro 11 Light Report
recent pm 5-6.syn
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 990 38 55 738 1 16 0 96 4 1 11
Future Vol, veh/h 1 990 38 55 738 1 16 0 96 4 1 11
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 ------
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 1 1165 45 65 868 1 19 0 113 5 1 13
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 869 0 0 1210 0 0 2173 2166 1165 2244 2210 868
Stage 1 ------1167 1167 - 998 998 -
Stage 2 ------1006 999 - 1246 1212 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 775 - - 577 - - 34 47 236 30 44 352
Stage 1 ------236268-294322-
Stage 2 ------291321-213255-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 775 - - 577 - - 29 42 236 14 39 352
Mov Cap-2 Maneuver ------123145-1439-
Stage 1 ------236268-294286-
Stage 2 ------248285-111255-
Approach EB WB NB SB
HCM Control Delay, s 0 0.8 47.7 125.6
HCM LOS E F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 209 775 - - 577 - - 47
HCM Lane V/C Ratio 0.63 0.002 - - 0.112 - - 0.401
HCM Control Delay (s) 47.7 9.7 - - 12 - - 125.6
HCM Lane LOS E A - - B - - F
HCM 95th %tile Q(veh) 3.7 0 - - 0.4 - - 1.4
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
Table 4-2
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall Any
Approach Leg
Any
Movement
Signalized D1 E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
400500600700800900100011001200130014001500160017001800100200300400500600PM 2012 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 124 VPHAM 1671 VPHNB AM 136 VPHMINOR STREET APPROACH - VPH MAJOR STREET - TOTAL OF BOTH APPROACH -VEHICLES PER HOUR (VPH)*Note: 150 vph applies as the lower threshold volume for a minor-streetapproach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane.SHORT RANGE (2028) BACKGROUND PEAK HOUR WARRANTAT PROSPECT/SHARP POINT INTERSECTIONMUTCD, 2003 EDITION, PAGE 4C-7 400500600700800900100011001200130014001500160017001800100200300400500600PM 2012 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 124 VPHAM 1671 VPHNB AM 136 VPH400500600700800900100011001200130014001500160017001800100200300400500600PM 2012 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 124 VPHAM 1671 VPHNB AM 136 VPH400500600700800900100011001200130014001500160017001800100200300400500600PM 2012 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 124 VPHAM 1671 VPHNB AM 136 VPH
400500600700800900100011001200130014001500160017001800100200300400500600PM 2067 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 178 VPHAM 1709 VPHNB AM 140 VPHMINOR STREET APPROACH - VPH MAJOR STREET - TOTAL OF BOTH APPROACH -VEHICLES PER HOUR (VPH)*Note: 150 vph applies as the lower threshold volume for a minor-streetapproach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane.SHORT RANGE (2028) TOTAL PEAK HOUR WARRANTAT PROSPECT/SHARP POINT INTERSECTIONMUTCD, 2003 EDITION, PAGE 4C-7 400500600700800900100011001200130014001500160017001800100200300400500600PM 2067 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 178 VPHAM 1709 VPHNB AM 140 VPH400500600700800900100011001200130014001500160017001800100200300400500600PM 2067 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 178 VPHAM 1709 VPHNB AM 140 VPH400500600700800900100011001200130014001500160017001800100200300400500600PM 2067 VPH*100*1502 OR MORE LANES & 1 LANE1 LANE & 1 LANE2 OR MORE LANES & 2 OR MORE LANESNB PM 178 VPHAM 1709 VPHNB AM 140 VPH
APPENDIX E
HCM 6th TWSC Short Bkgrd AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM
Scenario 1 07/27/2023 Synchro 11 Light Report
sb am 8-9.syn
Intersection
Int Delay, s/veh 2.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 704 83 108 846 8 18 0 118 2 0 7
Future Vol, veh/h 25 704 83 108 846 8 18 0 118 2 0 7
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 - - 150 - - -
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 27 774 91 119 930 9 20 0 130 2 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 939 0 0 865 0 0 2005 2005 774 2107 2087 930
Stage 1 ------828828-1168 1168 -
Stage 2 ------1177 1177 - 939 919 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 730 - - 778 - - 44 59 398 37 53 324
Stage 1 ------365386-236267-
Stage 2 ------233265-317350-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 730 - - 778 - - 37 48 398 21 43 324
Mov Cap-2 Maneuver ------117137-2143-
Stage 1 ------351372-227226-
Stage 2 ------193224-206337-
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.2 21.5 58.5
HCM LOS C F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 117 398 730 - - 778 - - 77
HCM Lane V/C Ratio 0.169 0.326 0.038 - - 0.153 - - 0.128
HCM Control Delay (s) 41.9 18.4 10.1 - - 10.5 - - 58.5
HCM Lane LOS E C B - - B - - F
HCM 95th %tile Q(veh) 0.6 1.4 0.1 - - 0.5 - - 0.4
HCM 6th TWSC Short Bkgrd PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM
Scenario 1 07/27/2023 Synchro 11 Light Report
sb pm 5-6.syn
Intersection
Int Delay, s/veh 5.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 1093 42 61 814 1 18 0 106 4 1 12
Future Vol, veh/h 1 1093 42 61 814 1 18 0 106 4 1 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 - - 150 - - -
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 1 1286 49 72 958 1 21 0 125 5 1 14
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 959 0 0 1335 0 0 2398 2391 1286 2477 2439 958
Stage 1 ------1288 1288 - 1102 1102 -
Stage 2 ------1110 1103 - 1375 1337 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 717 - - 517 - - 23 34 201 20 32 312
Stage 1 ------201234-257287-
Stage 2 ------254287-180222-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 717 - - 517 - - ~ 19 29 201 7 28 312
Mov Cap-2 Maneuver ------102123-728-
Stage 1 ------201234-257247-
Stage 2 ------208247-68222-
Approach EB WB NB SB
HCM Control Delay, s 0 0.9 48.5 $ 316.5
HCM LOS E F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 102 201 717 - - 517 - - 26
HCM Lane V/C Ratio 0.208 0.62 0.002 - - 0.139 - - 0.769
HCM Control Delay (s) 49.3 48.4 10 - - 13.1 - -$ 316.5
HCM Lane LOS E E B - - B - - F
HCM 95th %tile Q(veh) 0.7 3.6 0 - - 0.5 - - 2.4
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC Short Bkgrd AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
sb am 8-9 4 lane.syn
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 704 83 108 846 8 18 0 118 2 0 7
Future Vol, veh/h 25 704 83 108 846 8 18 0 118 2 0 7
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 ----150---
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 27 774 91 119 930 9 20 0 130 2 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 939 0 0 865 0 0 1531 2005 387 1614 2092 470
Stage 1 ------828828-1173 1173 -
Stage 2 ------7031177 - 441 919 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 726 - - 774 - - 80 59 611 69 52 540
Stage 1 ------332384-204264-
Stage 2 ------394263-565348-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 726 - - 774 - - 68 48 611 47 42 540
Mov Cap-2 Maneuver ------173136-4742-
Stage 1 ------320370-196223-
Stage 2 ------329222-429335-
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.2 14.6 28.7
HCM LOS B D
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 173 611 726 - - 774 - - 162
HCM Lane V/C Ratio 0.114 0.212 0.038 - - 0.153 - - 0.061
HCM Control Delay (s) 28.5 12.5 10.2 - - 10.5 - - 28.7
HCM Lane LOS D B B - - B - - D
HCM 95th %tile Q(veh) 0.4 0.8 0.1 - - 0.5 - - 0.2
HCM 6th TWSC Short Bkgrd PM - 4-Lane on Prospect
3: Sharp Point Drive & Prospect Road Peak Hour of the Land Use (5-6:00 PM)
Scenario 1 07/27/2023 Synchro 11 Light Report
sb pm 5-6 4 lane.syn
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 1093 42 61 814 1 18 0 106 4 1 12
Future Vol, veh/h 1 1093 42 61 814 1 18 0 106 4 1 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 ----150---
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 1 1286 49 72 958 1 21 0 125 5 1 14
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 959 0 0 1335 0 0 1912 2391 643 1748 2440 480
Stage 1 ------1288 1288 - 1103 1103 -
Stage 2 ------6241103 - 645 1337 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 713 - - 513 - - 41 33 416 55 31 532
Stage 1 ------173233-225285-
Stage 2 ------440285-427220-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 713 - - 513 - - 34 28 416 34 27 532
Mov Cap-2 Maneuver ------120122-3427-
Stage 1 ------173233-225245-
Stage 2 ------366245-299220-
Approach EB WB NB SB
HCM Control Delay, s 0 0.9 20.8 52.1
HCM LOS C F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 120 416 713 - - 513 - - 96
HCM Lane V/C Ratio 0.176 0.3 0.002 - - 0.14 - - 0.208
HCM Control Delay (s) 41.3 17.3 10.1 - - 13.2 - - 52.1
HCM Lane LOS E C B - - B - - F
HCM 95th %tile Q(veh) 0.6 1.2 0 - - 0.5 - - 0.7
HCM 6th TWSC Short Bkgrd AM
6: Sharp Point Drive & Site Access 8:00-9:00 AM
Scenario 1 07/27/2023 Synchro 11 Light Report
sb am 8-9.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 4 3 132 183 8
Future Vol, veh/h 4 4 3 132 183 8
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 5 5 4 155 215 9
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 383 220 224 0 - 0
Stage 1 220 -----
Stage 2 163 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 620 820 1345 - - -
Stage 1 817 -----
Stage 2 866 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 618 820 1345 - - -
Mov Cap-2 Maneuver 618 -----
Stage 1 815 -----
Stage 2 866 -----
Approach EB NB SB
HCM Control Delay, s 10.2 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1345 - 705 - -
HCM Lane V/C Ratio 0.003 - 0.013 - -
HCM Control Delay (s) 7.7 0 10.2 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q(veh) 0 - 0 - -
HCM 6th TWSC Short Bkgrd PM
6: Sharp Point Drive & Site Access 5:00-6:00 PM
Scenario 1 07/27/2023 Synchro 11 Light Report
sb pm 5-6.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 4 3 114 97 7
Future Vol, veh/h 10 4 3 114 97 7
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 12 5 4 134 114 8
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 260 118 122 0 - 0
Stage 1 118 -----
Stage 2 142 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 729 934 1465 - - -
Stage 1 907 -----
Stage 2 885 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 727 934 1465 - - -
Mov Cap-2 Maneuver 727 -----
Stage 1 904 -----
Stage 2 885 -----
Approach EB NB SB
HCM Control Delay, s 9.7 0.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1465 - 776 - -
HCM Lane V/C Ratio 0.002 - 0.021 - -
HCM Control Delay (s) 7.5 0 9.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
APPENDIX F
HCM 6th TWSC Short Total AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9.syn
Intersection
Int Delay, s/veh 2.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 704 105 114 846 8 21 0 119 2 0 7
Future Vol, veh/h 25 704 105 114 846 8 21 0 119 2 0 7
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 - - 150 - - -
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 27 774 115 125 930 9 23 0 131 2 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 939 0 0 889 0 0 2017 2017 774 2131 2123 930
Stage 1 ------828828-1180 1180 -
Stage 2 ------1189 1189 - 951 943 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 730 - - 762 - - 43 58 398 36 50 324
Stage 1 ------365386-232264-
Stage 2 ------229261-312341-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 730 - - 762 - - 36 47 398 21 40 324
Mov Cap-2 Maneuver ------114134-2140-
Stage 1 ------351372-223221-
Stage 2 ------187218-202328-
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.3 22.3 58.5
HCM LOS C F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 114 398 730 - - 762 - - 77
HCM Lane V/C Ratio 0.202 0.329 0.038 - - 0.164 - - 0.128
HCM Control Delay (s) 44.4 18.4 10.1 - - 10.7 - - 58.5
HCM Lane LOS E C B - - B - - F
HCM 95th %tile Q(veh) 0.7 1.4 0.1 - - 0.6 - - 0.4
HCM 6th TWSC Short Total PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6.syn
Intersection
Int Delay, s/veh 10
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 1093 85 73 814 1 60 0 118 4 1 12
Future Vol, veh/h 1 1093 85 73 814 1 60 0 118 4 1 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 - 200 - - 150 - - -
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 1 1286 100 86 958 1 71 0 139 5 1 14
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 959 0 0 1386 0 0 2426 2419 1286 2538 2518 958
Stage 1 ------1288 1288 - 1130 1130 -
Stage 2 ------1138 1131 - 1408 1388 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 717 - - 494 - - ~ 22 32 201 18 28 312
Stage 1 ------201234-248279-
Stage 2 ------245278-172210-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 717 - - 494 - - ~ 17 26 201 5 23 312
Mov Cap-2 Maneuver ------97118-523-
Stage 1 ------201234-248230-
Stage 2 ------192230-53210-
Approach EB WB NB SB
HCM Control Delay, s 0 1.1 72.7 $ 506.1
HCM LOS F F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 97 201 717 - - 494 - - 19
HCM Lane V/C Ratio 0.728 0.691 0.002 - - 0.174 - - 1.053
HCM Control Delay (s) 107 55.3 10 - - 13.8 - -$ 506.1
HCM Lane LOS F F B - - B - - F
HCM 95th %tile Q(veh) 3.8 4.3 0 - - 0.6 - - 2.8
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC Short Total AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9 4 lane.syn
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 704 105 114 846 8 21 0 119 2 0 7
Future Vol, veh/h 25 704 105 114 846 8 21 0 119 2 0 7
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 ----150---
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 27 774 115 125 930 9 23 0 131 2 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 939 0 0 889 0 0 1543 2017 387 1626 2128 470
Stage 1 ------828828-1185 1185 -
Stage 2 ------7151189 - 441 943 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 726 - - 758 - - 78 58 611 68 49 540
Stage 1 ------332384-201261-
Stage 2 ------388260-565339-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 726 - - 758 - - 65 47 611 45 39 540
Mov Cap-2 Maneuver ------169133-4539-
Stage 1 ------320370-194218-
Stage 2 ------319217-428326-
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.3 15.1 29.5
HCM LOS C D
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 169 611 726 - - 758 - - 157
HCM Lane V/C Ratio 0.137 0.214 0.038 - - 0.165 - - 0.063
HCM Control Delay (s) 29.6 12.5 10.2 - - 10.7 - - 29.5
HCM Lane LOS D B B - - B - - D
HCM 95th %tile Q(veh) 0.5 0.8 0.1 - - 0.6 - - 0.2
HCM 6th TWSC Short Total PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6 4 lane.syn
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 1093 85 73 814 1 60 0 118 4 1 12
Future Vol, veh/h 1 1093 85 73 814 1 60 0 118 4 1 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - 400 150 ----150---
Veh in Median Storage, # - 0 - - 0 - - 1 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 1 1286 100 86 958 1 71 0 139 5 1 14
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 959 0 0 1386 0 0 1940 2419 643 1776 2519 480
Stage 1 ------1288 1288 - 1131 1131 -
Stage 2 ------6521131 - 645 1388 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 713 - - 490 - - ~ 39 32 416 52 28 532
Stage 1 ------173233-217277-
Stage 2 ------423277-427208-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 713 - - 490 - - ~ 32 26 416 30 23 532
Mov Cap-2 Maneuver ------117117-3023-
Stage 1 ------173233-217228-
Stage 2 ------338228-284208-
Approach EB WB NB SB
HCM Control Delay, s 0 1.1 36.9 59.9
HCM LOS E F
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 117 416 713 - - 490 - - 85
HCM Lane V/C Ratio 0.603 0.334 0.002 - - 0.175 - - 0.235
HCM Control Delay (s) 74.3 17.9 10.1 - - 13.9 - - 59.9
HCM Lane LOS F C B - - B - - F
HCM 95th %tile Q(veh) 3 1.4 0 - - 0.6 - - 0.8
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Signalized Intersection Summary Short Total AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9 4 lane signal.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 25 704 105 114 846 8 21 0 119 2 0 7
Future Volume (veh/h) 25 704 105 114 846 8 21 0 119 2 0 7
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 27 774 59 125 930 9 23 0 23 2 0 1
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, %222222222222
Cap, veh/h 388 2018 900 458 2139 21 423 0 396 286 11 121
Arrive On Green 0.03 0.57 0.57 0.05 0.59 0.58 0.24 0.00 0.25 0.24 0.00 0.24
Sat Flow, veh/h 1781 3554 1585 1781 3606 35 1431 0 1585 926 44 485
Grp Volume(v), veh/h 27 774 59 125 458 481 23 0 23 3 0 0
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1864 1431 0 1585 1455 0 0
Q Serve(g_s), s 0.7 13.2 1.8 3.1 15.6 15.6 0.0 0.0 1.2 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.7 13.2 1.8 3.1 15.6 15.6 1.1 0.0 1.2 1.1 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.02 1.00 1.00 0.67 0.33
Lane Grp Cap(c), veh/h 388 2018 900 458 1054 1106 410 0 396 405 0 0
V/C Ratio(X) 0.07 0.38 0.07 0.27 0.43 0.43 0.06 0.00 0.06 0.01 0.00 0.00
Avail Cap(c_a), veh/h 448 2018 900 474 1054 1106 410 0 396 405 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 9.8 13.1 10.7 9.4 12.3 12.3 31.7 0.0 31.4 31.4 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.6 0.1 0.3 1.3 1.2 0.3 0.0 0.3 0.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 4.9 0.6 1.1 5.9 6.1 0.5 0.0 0.5 0.1 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.9 13.7 10.8 9.7 13.6 13.5 32.0 0.0 31.7 31.4 0.0 0.0
LnGrp LOS ABBABBCACCAA
Approach Vol, veh/h 860 1064 46 3
Approach Delay, s/veh 13.4 13.1 31.8 31.4
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 32.0 11.0 67.0 32.0 8.2 69.8
Change Period (Y+Rc), s 5.5 6.0 5.5 5.5 6.0 5.5
Max Green Setting (Gmax), s 26.5 6.0 60.5 26.5 6.0 60.5
Max Q Clear Time (g_c+I1), s 3.1 5.1 15.2 3.2 2.7 17.6
Green Ext Time (p_c), s 0.0 0.0 5.8 0.1 0.0 6.3
Intersection Summary
HCM 6th Ctrl Delay 13.7
HCM 6th LOS B
Timing Report, Sorted By Phase Short Total AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9 4 lane signal.syn
Phase Number 234678
Movement SBTL WBL EBTL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None C-Max
Maximum Split (s) 32 12 66 32 12 66
Maximum Split (%) 29.1% 10.9% 60.0% 29.1% 10.9% 60.0%
Minimum Split (s) 31 11 24 32 11 24
Yellow Time (s) 3 3.5 4.5 3 3.5 4.5
All-Red Time (s) 2.5 2.5 1 2.5 2.5 1
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 11
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 23.5 55.5 67.5 23.5 55.5 67.5
End Time (s) 55.5 67.5 23.5 55.5 67.5 23.5
Yield/Force Off (s) 50 61.5 18 50 61.5 18
Yield/Force Off 170(s) 39 61.5 7 39 61.5 7
Local Start Time (s) 5.5 37.5 49.5 5.5 37.5 49.5
Local Yield (s) 32 43.5 0 32 43.5 0
Local Yield 170(s) 21 43.5 99 21 43.5 99
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 18 (16%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow
Splits and Phases: 3: Sharp Point Drive & Prospect Road
Queues Short Total AM
3: Sharp Point Drive & Prospect Road 8:00-9:00 AM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9 4 lane signal.syn
Lane Group EBL EBT EBR WBL WBT NBT NBR SBT
Lane Group Flow (vph) 27 774 115 125 939 23 131 10
v/c Ratio 0.07 0.39 0.12 0.30 0.44 0.07 0.27 0.02
Control Delay 6.9 14.4 2.4 8.7 13.4 32.2 7.2 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 6.9 14.4 2.4 8.7 13.4 32.2 7.2 0.1
Queue Length 50th (ft) 6 154 0 29 198 12 0 0
Queue Length 95th (ft) 15 196 25 51 248 34 47 0
Internal Link Dist (ft) 697 797 221 337
Turn Bay Length (ft) 150 400 150 150
Base Capacity (vph) 372 1978 935 423 2131 349 494 468
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.07 0.39 0.12 0.30 0.44 0.07 0.27 0.02
Intersection Summary
HCM 6th Signalized Intersection Summary Short Total PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6 4 lane signal.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 1093 85 73 814 1 60 0 118 4 1 12
Future Volume (veh/h) 1 1093 85 73 814 1 60 0 118 4 1 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 1 1286 51 86 958 1 71 0 20 5 1 2
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 354 2057 917 274 2227 2 443 0 416 263 57 90
Arrive On Green 0.01 0.58 0.58 0.04 0.61 0.60 0.25 0.00 0.26 0.25 0.26 0.25
Sat Flow, veh/h 1781 3554 1585 1781 3643 4 1459 0 1585 815 216 344
Grp Volume(v), veh/h 1 1286 51 86 467 492 71 0 20 8 0 0
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1870 1459 0 1585 1374 0 0
Q Serve(g_s), s 0.0 28.7 1.7 2.3 16.6 16.6 0.0 0.0 1.1 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.0 28.7 1.7 2.3 16.6 16.6 3.7 0.0 1.1 3.7 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00 0.62 0.25
Lane Grp Cap(c), veh/h 354 2057 917 274 1086 1143 431 0 416 398 0 0
V/C Ratio(X) 0.00 0.63 0.06 0.31 0.43 0.43 0.16 0.00 0.05 0.02 0.00 0.00
Avail Cap(c_a), veh/h 441 2057 917 303 1086 1143 431 0 416 398 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 10.9 16.7 11.0 13.3 12.3 12.3 34.4 0.0 33.1 33.1 0.0 0.0
Incr Delay (d2), s/veh 0.0 1.4 0.1 0.6 1.2 1.2 0.8 0.0 0.2 0.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 11.0 0.6 0.8 6.3 6.6 1.8 0.0 0.5 0.2 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 10.9 18.1 11.1 14.0 13.5 13.5 35.2 0.0 33.3 33.2 0.0 0.0
LnGrp LOS BBBBBBDACCAA
Approach Vol, veh/h 1338 1045 91 8
Approach Delay, s/veh 17.9 13.5 34.8 33.2
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 36.0 10.0 74.0 36.0 6.1 77.9
Change Period (Y+Rc), s 5.5 6.0 5.5 5.5 6.0 5.5
Max Green Setting (Gmax), s 30.5 6.0 66.5 30.5 6.0 66.5
Max Q Clear Time (g_c+I1), s 5.7 4.3 30.7 5.7 2.0 18.6
Green Ext Time (p_c), s 0.0 0.0 11.4 0.4 0.0 6.5
Intersection Summary
HCM 6th Ctrl Delay 16.7
HCM 6th LOS B
Timing Report, Sorted By Phase Short Total PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6 4 lane signal.syn
Phase Number 234678
Movement SBTL WBL EBTL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None C-Max
Maximum Split (s) 36 12 72 36 12 72
Maximum Split (%) 30.0% 10.0% 60.0% 30.0% 10.0% 60.0%
Minimum Split (s) 32 11 24 32 11 24
Yellow Time (s) 3 3.5 4.5 3 3.5 4.5
All-Red Time (s) 2.5 2.5 1 2.5 2.5 1
Minimum Initial (s) 7 4 10 7 4 10
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 11 11 11 11
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 77.5 113.5 5.5 77.5 113.5 5.5
End Time (s) 113.5 5.5 77.5 113.5 5.5 77.5
Yield/Force Off (s) 108 119.5 72 108 119.5 72
Yield/Force Off 170(s) 97 119.5 61 97 119.5 61
Local Start Time (s) 5.5 41.5 53.5 5.5 41.5 53.5
Local Yield (s) 36 47.5 0 36 47.5 0
Local Yield 170(s) 25 47.5 109 25 47.5 109
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 72 (60%), Referenced to phase 4:EBTL and 8:WBTL, Start of Yellow
Splits and Phases: 3: Sharp Point Drive & Prospect Road
Queues Short Total PM
3: Sharp Point Drive & Prospect Road 5:00-6:00 PM 4-Lane Prospect Road
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6 4 lane signal.syn
Lane Group EBL EBT EBR WBL WBT NBT NBR SBT
Lane Group Flow (vph) 1 1286 100 86 959 71 139 20
v/c Ratio 0.00 0.62 0.10 0.36 0.42 0.20 0.27 0.05
Control Delay 7.0 18.7 2.6 11.6 11.7 36.2 7.3 18.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 7.0 18.7 2.6 11.6 11.7 36.2 7.3 18.8
Queue Length 50th (ft) 0 343 0 22 165 43 1 4
Queue Length 95th (ft) 2 379 21 38 252 79 43 22
Internal Link Dist (ft) 697 797 221 337
Turn Bay Length (ft) 150 400 150 150
Base Capacity (vph) 371 2061 964 242 2276 363 516 433
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.00 0.62 0.10 0.36 0.42 0.20 0.27 0.05
Intersection Summary
HCM 6th TWSC Short Total AM
6: Sharp Point Drive & Site Access 8:00-9:00 AM
Scenario 1 07/27/2023 Synchro 11 Light Report
st am 8-9.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 4 6 132 183 36
Future Vol, veh/h 8 4 6 132 183 36
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 9 5 7 155 215 42
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 405 236 257 0 - 0
Stage 1 236 -----
Stage 2 169 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 602 803 1308 - - -
Stage 1 803 -----
Stage 2 861 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 598 803 1308 - - -
Mov Cap-2 Maneuver 598 -----
Stage 1 798 -----
Stage 2 861 -----
Approach EB NB SB
HCM Control Delay, s 10.6 0.3 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1308 - 654 - -
HCM Lane V/C Ratio 0.005 - 0.022 - -
HCM Control Delay (s) 7.8 0 10.6 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
HCM 6th TWSC Short Total PM
6: Sharp Point Drive & Site Access 5:00-6:00 PM
Scenario 1 07/27/2023 Synchro 11 Light Report
st pm 5-6.syn
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 64 10 9 114 97 62
Future Vol, veh/h 64 10 9 114 97 62
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 75 12 11 134 114 73
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 307 151 187 0 - 0
Stage 1 151 -----
Stage 2 156 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 685 895 1387 - - -
Stage 1 877 -----
Stage 2 872 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 679 895 1387 - - -
Mov Cap-2 Maneuver 679 -----
Stage 1 869 -----
Stage 2 872 -----
Approach EB NB SB
HCM Control Delay, s 10.9 0.6 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1387 - 702 - -
HCM Lane V/C Ratio 0.008 - 0.124 - -
HCM Control Delay (s) 7.6 0 10.9 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q(veh) 0 - 0.4 - -
APPENDIX G
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
Prospect Road
Midpoint
Drive ProspectParkway Sharp Point DrivePoudre
Trail PoudreTrailPoudreTrailSCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES Prospect Sports ITIS, May 2023
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Poudre Trail Recreational
Minimum B C C C B
1 Actual A A B A B
Proposed A A B A B
Commercial uses to the
south of the site Commercial
Minimum B C C C B
2 Actual A B B C B
Proposed A B B C B
Larimer County
Detention Center Institutional
Minimum B C C C B
3 Actual A C B C B
Proposed A C B C B
Commercial uses to the
west of the site Commercial
Minimum B C C C B
4 Actual A C B C C
Proposed A C B C C
Commercial uses to the
northwest of the site Commercial
Minimum B C C C B
5 Actual A B B C C
Proposed A B B C C
Commercial uses to the
north of the site Commercial
Minimum B C C C B
6 Actual F B B C C
Proposed F B B C C
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
B
U
R
LIN
G
T
O
N N
O
R
T
H
E
R
N R
AIL
R
O
A
D
Prospect Road
Midpoint
Drive ProspectParkway Sharp Point DrivePoudre
Trail PoudreTrailPoudreTrailSCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES Prospect Sports ITIS, May 2023
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Poudre Trail Recreation C A A 1
2
3
4
5
6
7
8