January 04, 2023
Michael Botelho
POUDRE SCHOOL DISTRICT
2445 LAPORTE AVE
Fort Collins, CO 805212211
RE: Mountain View Subdivision, BDR220008, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Mountain View Subdivision. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
12/29/2022: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email correspondence
with other reviewers and keep me informed of any phone conversations. Thank you!
Comment Number: 2
12/29/2022: SUBMITTAL:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a different font color.
When replying to the comment letter please be detailed in your responses, as
all comments should be thoroughly addressed. Comments requiring action
should NOT have a response such as noted or acknowledged. You will need to
provide references to specific project plans, pages, reports, or explanations of
why comments have not been addressed [when applicable].
2
Comment Number: 3
12/29/2022: SUBMITTAL:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information, and round number.
Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
Reach out to me if you would like a list of suggested names.
*Please disregard any references to paper copies, flash drives, or CDs.
Comment Number: 4
12/29/2022: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html
Comment Number: 5
12/29/2022: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible.
Comment Number: 6
12/29/2022: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project.
Comment Number: 7
12/29/2022: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00.
Comment Number: 8
12/29/2022: FOR FINAL APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures (Section 2.2.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website at www.fcgov.com.
Comment Number: 9
12/29/2022: FOR FINAL APPROVAL:
If the project is approved by the Director, there is a two-week appeal period
from the date of the decision. The project is not able to be recorded until it is
confirmed there are no appeals.
3
Comment Number: 10
12/29/2022: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this project.
I will provide a recording checklist and process information when we are closer to this step.
Department: Planning Services
Contact: Arlo Schumann, 970-221-6599, aschumann@fcgov.com
Topic: General
Comment Number: 1
01/03/2023: No Planning comments at this time.
Department: Historic Preservation
Contact: Jim Bertolini, 970-416-4250, jbertolini@fcgov.com
Topic: General
Comment Number: 1
12/14/2022: NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated
historic resources on the site and the nature of the project does not impact any
historic resources that may lie on the development site or within 200 feet of the
site.
Comment Number: 2
12/14/2022: INFORMATION ONLY:
The main instructional building at 2540 Laporte Avenue (Mountain View
School/District 10 School) was identified as Landmark-eligible in previous
historic survey. Historic Preservation Services can supply documentation if
needed by PSD for long-range planning and/or pursuit of historic preservation
funding opportunities (designation would be required).
4
Department: Engineering Development Review
Contact: John Gerwel, , jgerwel@fcgov.com
Topic: General
Comment Number: 1
12/21/2022: FOR APPROVAL:
Laporte Avenue is a two lane arterial. LCUASS standards require 2-lane
arterials to have 84 feet of right-of-way. This will require an additional 12 feet of
ROW to be dedicated along the Laporte frontage. There are also 15 foot
easements required to be dedicated beyond the additional 12 feet of ROW.
Comment Number: 2
12/21/2022: FOR APPROVAL:
Barton Drive will also need 9 foot utility easements dedicated beyond the ROW.
The necessary ROW and utility easements have been added to the new plat document.
Comment Number: 3
12/21/2022: FOR FUTURE DEVELOPMENT:
The adjacent development - Sanctuary on the Green intends to add in detached
sidewalks with parkways along Barton and Laporte. Any development on these
parcels would need to tie in to those designs.
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: General
Comment Number: 1
12/26/2022: INFORMATION:
The platting of these properties alone does not trigger the requirement of a
Transportation Impact Study. TIS waived. Any subsequent development of
these sites will however be reviewed upon submittal and may require further Traffic Evaluation.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1
12/29/2022: FOR APPPROVAL:
Light & Power has existing electric facilities feeding 2540 LaPorte Ave. With
the platting of the property, we would like to see the existing transformer and
electric primary placed in a Utility easement.
The necessary utility easement has been added to the new plat document.
Comment Number: 2
12/29/2022: QUESTION:
With the platting of the property, will standard utility easements be placed along
LaPorte Ave. and along both sides of Barton Drive?
These easements have been added to the new plat document.
5
Department: Stormwater Engineering
Contact: Stephen Agenbroad, , sagenbroad@fcgov.com
Topic: General
Comment Number: 1
12/13/2022: INFORMATION:
There are no concerns with the subdivision; however, this subdivision approval
does not include any approval of actual development, or building, on the created
lots. Prior to any development, or issuance of any building permits, a detailed
grading plan and drainage memorandum prepared by a professional engineer
licensed in the state of Colorado will be required.
Department: Water-Wastewater Engineering
Contact: Stephen Agenbroad, , sagenbroad@fcgov.com
Topic: General
Comment Number: 1
12/13/2022: FOR APPROVAL:
There is a 6-inch water main on the western parcel, that has a fire hydrant
serviced from it. The fire hydrant and water main will need to be located on a
utility plan and have an easement dedicated to the city on both the plat and utility plan.
The fire hydrant and water main were located and included in an easement on the plat and utility plan.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 1
12/12/2022: No comments.
Department: Forestry
Contact: Freddie Haberecht, , fhaberecht@fcgov.com
Topic: General
Comment Number: 1
12/29/2022: FOR INFORMATION
Forestry has no comments at this points. If there are any impacts to trees on site
please reach out to city of Fort Collins forestry (fhaberecht@fcgov.com) for a formal tree survey.
Department: PFA
Contact: Marcus Glasgow, 970-416-2869, marcus.glasgow@poudre-fire.org
Topic: General
Comment Number: 1
12/20/2022: PFA has no comments on the replat.
6
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
01/03/2023: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
All changes were made and are reflected in the new plat plan.
Department: Outside Agencies
Contact: Megan Harrity, Larimer County Office of the Assessor, mharrity@larimer.org
Topic: General
Comment Number: 1
12/29/2022: FOR APPROVAL:
This subdivision has different taxing districts for each parcel. We won't create
one new parcel until both parcels are in the same taxing district.
9709200910 is in tax district 1115
9709103926 is in tax district 1110
Parcel 9709103926 is included in the Sunset Water District.
Parcel 9709103926 is not.
They will have to be in all of the same taxing districts to create one new parcel.
Please let me know if you have any questions, Thank you.
After discussion with Sunset Water District, it was found that the tax district for parcel 9709200910 had