HomeMy WebLinkAbout209 TROUTMAN PAINT BOOTH ADDITION - MINOR AMENDMENT - MA190088 - DOCUMENT MARKUPS - ROUND 4 - UTILITY PLANSKnow what's below.before you dig.CallR
Add current month and year here
Add owner information here
Please add a sheet for the general construction
notes. The notes are a requirement per the utility
plan checklist. The notes and utility checklist can
both be found in appendix E of LCUASS.
City of Fort Collins
Development Review Engineering
Tim Dinger, P.E.
Date: 05/15/2023
The proposed building and the entire existing
building need to be included in the easement
exclusion. The dimensions of the easement
exclusions on this plan do not match the plat.
48'-0"93'-8"98'-4 1/4"62'-0"
Scale is 1" = 20'
All easements, proposed
and existing, should be
shown on this plan.