Loading...
HomeMy WebLinkAboutLOT 1, HARMONY COMMONS - PDP - PDP170023 - DECISION - HEARING OFFICER DECISIONC� � CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION HEARING DATE: PROJECT NAME: CASE NUMBER: APPLICANT: HEARING OFFICER August 30, 2017 Harmony Commons Lot 1 PDP 170023 Harmony Commons LLC c/o Mr. Todd Parker Brinkman Partners 3528 Precision Drive Fort Collins, CO 80528 Kendra L. Carberry PROJECT DESCRIPTION: This is a request for a PDP on Lot 1 of Harmony Commons that includes a two-story, 25,000 square foot, medical office building on a 1.61 acre lot. The site is located in the Basic Industrial Non-Retail Employment Activity Center sub area of the Harmony Corridor Plan. The site is a portion of Tract S(24.71 acres) of the Harmony Technology Park Overall Development Plan, Seventh Amendment, and represents the fifth phase of the larger Harmony Commons commercial center. SUMMARY OF DECISION ZONE DISTRICT: Approved H-C, Harmony Corridor HEARING: The Hearing Officer opened the hearing at approximately 5:00 p.m. on August 30, 2017, in the Conference room A at 218 North College Avenue, Fort Collins, Colorado. EVIDENCE: During the hearing, the Hearing Officer accepted the following evidence: (1) Planning Department Staff Report; (2) the application, plans, maps and other supporting documents submitted by the applicant; and (3) a copy of the public notice. The Land Use Code (the "Code") and the formally promulgated policies of the City are all considered part of the record considered by the Hearing Officer. TESTIMONY: The following persons testified at the hearing: From the City: Ted Shepard From the Applicant: Cathy Mathis From the Public: N/A 9i»�zn» 0:1USERSIFORTCOLL/NSLA.ND USEIH,9RM0�'YCOA4MON'SIDECISION-0911/7.DOCX • � FINDINGS 1. Evidence presented to the Hearing Officer established the fact that the hearing was properly posted, legal notices mailed and notice published. 2. The PDP complies with the Harmony Corridor Plan, because the PDP includes a primary use (medical office building), which is permitted in the Basic Industrial Non-Retail Employment Activity Center (BINREAC). 3. The PDP complies with the Harmony Technology Park, Seventh Amendment Overall Development Plan, because Lot 1 is contemplated for a primary use, and a medical office building is defined as a primary use. 4. The PDP complies with the applicable General Development Standards contained in Article 3 of the Code. a. The PDP complies with Section 3.2.1(C)(D), Landscaping and Tree Protection, because the 80-foot buffer along Harmony Road is not included within this PDP, but the landscaping, berms and meandering 8' sidewalk have already been constructed by the master developer. b. The PDP complies with Section 3.2.1(E)(4)(a), Parking Lot Perimeter Landscaping, because the Lot 1 parking lot is defined on the east and west with landscape islands, and along the south by a continuous row of a combination of trees and shrubs. c. The PDP complies with Section 3.2.1(E)(5), Parking Lot Interior Landscaping, because the parking lot exceeds the minimum required 6% interior landscaping in the form of islands. d. The PDP complies with Section 3.2.2(B), Access, Circulation and Parking, because the parking and circulation system is specifically designed to be fully integrated with the larger Harmony Commons commercial center. e. The PDP complies with Section 3.2.2(C)(4), Bicycle Parking, because the PDP includes 9 spaces, 1 enclosed and 8 in fixed racks. £ The PDP complies with Section 3.2.2(C)(5), Walkways, because the PDP includes multiple private walkways and sidewalks. g. The PDP complies with Section 3.2.2(C)(6), Direct On-Site Access to Pedestrian and Bicycle Destinations, because the multiple walkways allow for both bikes and pedestrians to connect to multiple destinations and the surrounding Harmony Technology Park. h. The PDP complies with Section 3.2.2(K)(3), Parking Lots, Maximum Number of Spaces, because the PDP includes 106 spaces. 2 9i� i�?n! � Q: I L'SERSIFORT COLLINSLAND USEIHARMO.N7' CO.�YIMONSIDECISIOn'-091117.DOGt" � � i. The PDP complies with Section 3.2.4, Site Lighting, because: the parking lot pole lighting and wall-mounted lighting include down-directional and full cut-off fxtures; there are no foot-candles that exceed the maximum; and fixtures will match those existing on Lots 3 and 4. j. The PDP complies with Section 3.5.1, Building and Project Compatibility, because the two mixed-use buildings approved on Lots 3 and 4 and the recently approved building on Lot 2 have established an architectural character for the area, and the PDP is consistent with that character. k. The PDP complies with Section 3.5.3(C)(2), Orientation to Build-to Lines for Streetfront (sic) Buildings, because the proposed building aligns with the buildings on Lots 2, 3 and 4. l. The PDP complies with Section 3.6.4, Transportation Level of Service Requirements, because a Transportation Impact Study and approved Basic Development Review have already identified the public infrastructure improvements (including transportation improvements) needed for this PDP. 5. The PDP complies with the applicable requirements of the Harmony Corridor (H- C) District contained in Article 4 of the Code. a. The PDP complies with Section 4.26(B), Permitted Uses, because a medical office building is a permitted use in the H-C District. b. The PDP complies with Section 4.26(D)(3), Dimensional Standards, because the building is two stories. DECISION Based on the foregoing findings, the Hearing Officer hereby enters the following rulings: 1. The PDP is approved as submitted. DATED this 1 l`h day of September, 2017. ��Grf.,�` �f�::T.�.c: �-r.�►' z-' ll Kendra L. Carberry Hearing Officer � � 9/11/2017 p. i(ISERSIFORT C'OLLI.NS LAND USEI HARMONY COMAlONSIDECIS/OIJ-091 / 17. DOCX