Loading...
HomeMy WebLinkAbout209 CHERRY STREET - MIXED USE - PDP230006 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDY This document, together with the concepts and recommendations presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from Kellar Engineering LLC shall be without liability to Kellar Engineering LLC. 209 Cherry Street Mixed-Use Development Fort Collins, CO Traffic Impact Study KE Job #2023-030 Prepared for: tribedevco.com Prepared by: skellar@kellarengineering.com www.kellarengineering.com 970.219.1602 phone April 28, 2023 Sean K. Kellar, PE, PTOE 209 Cherry Street TIS -Page 1 TABLE OF CONTENTS Page 1.0 Introduction 3 2.0 Existing Conditions and Roadway Network 3 2.1 Recent Traffic Volumes 3 3.0 Proposed Development 6 4.0 Pedestrian Facilities 6 4.1 Trip Generation 6 4.2 Trip Distribution 7 4.3 Traffic Assignment 7 4.4 Short Range and Long Range Total Peak Hour Traffic 7 5.0 Traffic Operation Analysis 8 5.1 Analysis Methodology 8 5.2 Intersection Operational Analysis 8 6.0 Findings 20 List of Figures: Page Figure 1: Vicinity Map 4 Figure 2: Site Plan 5 Figure 3: Recent Peak Hour Traffic 10 Figure 4: 2025 Background Peak Hour Traffic 11 Figure 5: 2045 Background Peak Hour Traffic 12 Figure 6: Trip Distribution 13 Figure 7: Site Generated Traffic 14 Figure 8: 2025 Short Range Total Peak Hour Traffic 15 Figure 9: 2045 Long Range Total Peak Hour Traffic 16 209 Cherry Street TIS -Page 2 TABLE OF CONTENTS (continued) List of Tables: Page Table 1: Trip Generation 9 Table 2: Recent Peak Hour Operations 17 Table 3: 2025 Background Peak Hour LOS Operations 18 Table 4: 2025 Short Range Total Peak Hour LOS Operations 19 Appendices: Page Appendix A: Recent Traffic Counts 22 Appendix B: Base Assumptions (TIS Scoping Form) 24 Appendix C: Level of Service (LOS) Tables 25 Appendix D: Aerial Image 26 Appendix E: HCM Calculations (Synchro) 28 209 Cherry Street TIS -Page 3 1.0 Introduction This Traffic Impact Study (TIS) is for the 209 Cherry Street Mixed-Use Development project located at 209 Cherry Street in Fort Collins, CO. The purpose of this TIS is to identify project traffic generation characteristics, to identify potential traffic related impacts on the adjacent street system, and to develop mitigation measures required for identified traffic impacts. Kellar Engineering LLC (KE) has prepared the TIS to document the results of anticipated traffic conditions in accordance with the Larimer County Urban Area Street Standards (LCUASS) and to identify any projected impacts to the transportation system. The project is anticipated to generate approximately 825 daily weekday trips, 50 AM total peak hour trips, and 73 PM total peak hour trips. See Table 1: Trip Generation. 2.0 Existing Conditions and Roadway Network The project site is located at the southwest quadrant of Cherry Street and Mason Street in Fort Collins, CO. N. Mason Street is a 2-lane north-south roadway that is classified as a 2-lane arterial on the City of Fort Collins Master Street Plan. This portion of Mason Street has a posted speed of 25 mph, bike lanes and a striped center median adjacent to the project site. Cherry Street is an east-west roadway that is classified as a major collector on the City of Fort Collins Master Street Plan. Cherry Street has a posted speed of 25 mph, a continuous two-way left-turn lane (TWLTL), and bike lanes adjacent to the project site. Additionally, the intersection of Cherry Street and Mason Street has two-way stop-control with the stop signs facing the north/south approaches. 2.1 Recent Traffic Volumes Recent peak hour traffic volume counts were conducted using data collection cameras on Tuesday, 2/21/23. The traffic counts were conducted during the peak hours of adjacent street traffic in 15-minute intervals from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM. These turning movement counts are shown in Figure 3 with the count sheets provided in Appendix A. 209 Cherry Street TIS -Page 4 Figure 1: Vicinity Map 209 Cherry Street TIS -Page 5 Figure 2: Site Plan 209 Cherry Street TIS -Page 6 3.0 Proposed Development The proposed project consists of ~114 multifamily dwelling units along with ~ 2,320 SF of retail. Access to the project site is proposed from a right-in/right-out (RIRO) parking garage access to Mason Street. See Table 1: Trip Generation and Figure 2: Site Plan. 4.0 Pedestrian Facilities The proposed project will be responsible for the ultimate public street improvements adjacent to the property (including sidewalk) per the Larimer County Urban Area Street Standards (LCUASS). Cherry Street and Mason Street have bike lanes and sidewalks adjacent to the project. The project’s sidewalk will connect into the existing sidewalk system in Cherry Street and Mason Street adjacent to the property to provide adequate pedestrian connectivity per the LCUASS criteria. Also, the project’s sidewalk will tie into the existing enhanced sidewalk crossing of Cherry Street at the west portion of the site. See Figure 2: Site Plan. 4.1 Trip Generation Site generated traffic estimates are determined through a process known as trip generation. Rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the Trip Generation Manual published by the Institute of Transportation Engineers (ITE). ITE has established trip generation rates in nationwide studies of similar land uses. For this study, KE used the ITE 11th Edition Trip Generation Manual average trip rates. Since traffic on the adjacent streets and intersections is highest during the weekday peak hours, this study analyzed the weekday peak hour traffic. The proposed project is anticipated to generate approximately 825 daily weekday trips, 50 AM total peak hour trips, and 73 PM total peak hour trips. See Table 1: Trip Generation. 209 Cherry Street TIS -Page 7 4.2 Trip Distribution Distribution of site traffic on the street system was based on the area street system characteristics, existing traffic patterns and volumes, anticipated surrounding development areas, and the proposed access system for the project. The directional distribution of traffic is a means to quantify the percentage of site generated traffic that approaches the site from a given direction and departs the site back to the original source. Figure 6 illustrates the trip distribution used for the project’s analysis. 4.3 Traffic Assignment Traffic assignment was obtained by applying the trip distributions to the estimated trip generation of the development. Figure 7 shows the site generated peak hour traffic assignment. 4.4 Short Range and Long Range Total Peak Hour Traffic Site generated peak hour traffic volumes were added to the background traffic volumes to represent the estimated traffic conditions for the short range 2025 horizon and long range 2045 horizon. The background (2025) and short range (2025) total traffic volumes are shown in Figure 4 and Figure 8 respectively. The long range background (2045) and long range (2045) total traffic volumes are shown in Figures 5 and 9. The traffic analysis in this study includes the traffic generated from the proposed development plus the increase in background traffic of 2% per year per the growth projections from the NFRMPO (North Front Range Metropolitan Planning Organization). 209 Cherry Street TIS -Page 8 5.0 Traffic Operation Analysis KE’s analysis of traffic operations in the site vicinity was conducted to determine the capacity at the identified intersection. The acknowledged source for determining overall capacity is the Highway Capacity Manual. 5.1 Analysis Methodology Capacity analysis results are listed in terms of level of service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. LOS ranges from an A (very little delay) to an F (long delays). A description of the level of service (LOS) for signalized and unsignalized intersections from the Highway Capacity Manual are provided in Appendix E. 5.2 Intersection Operational Analysis Operational analysis was performed for the short range 2025 horizon and the long range 2045 horizon. The calculations for this analysis are provided in Appendix E. Using the short range total traffic volumes, the project is projected to operate acceptably with all studied intersections and access points meeting LCUASS LOS criteria. See Table 4: 2025 Short Range Total Peak Hour Operation. 209 Cherry Street TIS -Page 9 Table 1: Trip Generation (ITE Trip Generation, 11th Edition) ITE Code Land Use Average Daily Trips AM Peak Hour Trips PM Peak Hour Trips Size Rate Total Rate % In In % Out Out Total Rate % In In % Out Out Total 221 Multifamily (Mid-Rise) 114 DU * 497 * 23% 9 77% 30 39 * 61% 27 39% 18 45 822 Retail 2.32 KSF * 328 0.84 60% 7 40% 4 11 * 50% 14 50% 14 28 Subtotal 825 16 34 50 41 32 73 Total 825 16 34 50 41 32 73 KSF= Thousand Square Feet DU = Dwelling Units *Fitted Curve Equation Used 209 Cherry Street TIS -Page 10 Figure 3: Recent Peak Hour Traffic 209 Cherry Street TIS -Page 11 Figure 4: 2025 Background Traffic 209 Cherry Street TIS -Page 12 Figure 5: 2045 Background Traffic 209 Cherry Street TIS -Page 13 Figure 6: Trip Distribution 209 Cherry Street TIS -Page 14 Figure 7: Site Generated Traffic 209 Cherry Street TIS -Page 15 Figure 8: 2025 Short Range Total Traffic 209 Cherry Street TIS -Page 16 Figure 9: 2045 Long Range Total Traffic 209 Cherry Street TIS -Page 17 Table 2: Recent Peak Hour Operations Level of Service (LOS) LOS Compliance Intersection Movement AM PM LOS LOS Mason St./Cherry St. TWSC EB Left A A Y EB Thru/Right A A Y EB Approach A A Y WB Left A A Y WB Thru/Right A A Y WB Approach A A Y NB Left/Thru C C Y NB Right B B Y NB Approach B B Y SB Left/Thru/Right C D Y SB Approach C D Y 209 Cherry Street TIS -Page 18 Table 3: 2025 Background Peak Hour Operations Level of Service (LOS) LOS Compliance Intersection Movement AM PM LOS LOS Mason St./Cherry St. TWSC EB Left A A Y EB Thru/Right A A Y EB Approach A A Y WB Left A A Y WB Thru/Right A A Y WB Approach A A Y NB Left/Thru C C Y NB Right B B Y NB Approach B B Y SB Left/Thru/Right C D Y SB Approach C D Y 209 Cherry Street TIS -Page 19 Table 4: 2025 Short Range Total Peak Hour Operations Level of Service (LOS) LOS Compliance Intersection Movement AM PM LOS LOS Mason St./Cherry St. TWSC EB Left A A Y EB Thru/Right A A Y EB Approach A A Y WB Left A A Y WB Thru/Right A A Y WB Approach A A Y NB Left/Thru C D Y NB Right B B Y NB Approach B B Y SB Left/Thru/Right C D Y SB Approach C D Y Level of Service (LOS) LOS Compliance Intersection Movement AM PM LOS LOS Mason St./Garage Access EB Right A A Y EB Approach A A Y NB Thru A A Y NB Approach A A Y SB Thru/Right A A Y SB Approach A A Y 209 Cherry Street TIS -Page 20 6.0 Findings Based upon the analysis in this study, the proposed project located at 209 Cherry Street in Fort Collins, CO demonstrates compliance with the standards in the Larimer County Urban Area Street Standards (LCUASS) for traffic at the time of development. The findings of the TIS are summarized below: • The proposed project is anticipated to generate a total of approximately 825 daily weekday trips, 50 AM total peak hour trips, and 73 PM total peak hour trips. • The project complies with the Levels of Service (LOS) requirements for traffic, the City of Fort Collins Transportation Plan, and the Larimer County Urban Area Street Standards (LCUASS). • The study intersections will operate acceptably and comply with the intersection levels of service (LOS) requirements in the LCUASS with the development of the project and background traffic in the 2025 Short Range Total future. • The proposed access points will operate appropriately and demonstrate compliance with the City’s LOS requirements. • The existing street improvements are sufficient to accommodate the proposed project’s traffic. 209 Cherry Street TIS -Page 21 APPENDICES: 209 Cherry Street TIS -Page 22 Appendix A: Recent Traffic Counts 209 Cherry Street TIS -Page 23 209 Cherry Street TIS -Page 24 Appendix B: Base Assumptions (TIS Scoping Form) 209 Cherry Street TIS -Page 25 Appendix C: Level of Service (LOS) Table Level of Service Definitions Level of Service Signalized Intersection Unsignalized Intersection (LOS) Average Total Delay Average Total Delay (sec/veh) (sec/veh) A ≤ 10 ≤ 10 B > 10 and ≤ 20 > 10 and ≤ 15 C > 20 and ≤ 35 > 15 and ≤ 25 D > 35 and ≤ 55 > 25 and ≤ 35 E > 55 and ≤ 80 > 35 and ≤ 50 F > 80 > 50 LCUASS Table 4-3 209 Cherry Street TIS -Page 26 Appendix D: Aerial Image Google Maps 209 Cherry Street TIS -Page 27 209 Cherry Street TIS -Page 28 Appendix E: HCM Calculations (Synchro) Recent AM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/07/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 1.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 14 281 10 38 316 27 3 4 24 10 8 8 Future Vol, veh/h 14 281 10 38 316 27 3 4 24 10 8 8 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 15 305 11 41 343 29 3 4 26 11 9 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 372 0 0 316 0 0 790 795 311 796 786 358 Stage 1 ------341341-440440- Stage 2 ------449454-356346- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1186 - - 1244 - - 308 320 729 305 324 686 Stage 1 ------674639-596578- Stage 2 ------589569-661635- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1186 - - 1244 - - 287 305 729 281 309 686 Mov Cap-2 Maneuver ------287305-281309- Stage 1 ------665631-588559- Stage 2 ------554550-625627- Approach EB WB NB SB HCM Control Delay, s 0.4 0.8 11.7 16 HCM LOS B C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 297 729 1186 - - 1244 - - 355 HCM Lane V/C Ratio 0.026 0.036 0.013 - - 0.033 - - 0.08 HCM Control Delay (s) 17.4 10.1 8.1 - - 8 - - 16 HCM Lane LOS C B A - - A - - C HCM 95th %tile Q(veh) 0.1 0.1 0 - - 0.1 - - 0.3 Recent PM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/07/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 3.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 338 8 36 396 16 15 5 99 35 22 15 Future Vol, veh/h 2 338 8 36 396 16 15 5 99 35 22 15 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 2 367 9 39 430 17 16 5 108 38 24 16 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 447 0 0 376 0 0 913 901 372 949 897 439 Stage 1 ------376376-517517- Stage 2 ------537525-432380- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1113 - - 1182 - - 254 278 674 240 279 618 Stage 1 ------645616-541534- Stage 2 ------528529-602614- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1113 - - 1182 - - 225 268 674 193 269 618 Mov Cap-2 Maneuver ------225268-193269- Stage 1 ------644615-540516- Stage 2 ------474512-501613- Approach EB WB NB SB HCM Control Delay, s 0 0.7 13.2 25.7 HCM LOS B D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 234 674 1113 - - 1182 - - 251 HCM Lane V/C Ratio 0.093 0.16 0.002 - - 0.033 - - 0.312 HCM Control Delay (s) 22 11.4 8.2 - - 8.2 - - 25.7 HCM Lane LOS C B A - - A - - D HCM 95th %tile Q(veh) 0.3 0.6 0 - - 0.1 - - 1.3 2025 Background AM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/07/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 1.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 15 292 10 40 329 28 3 4 25 10 8 8 Future Vol, veh/h 15 292 10 40 329 28 3 4 25 10 8 8 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 16 317 11 43 358 30 3 4 27 11 9 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 388 0 0 328 0 0 823 829 323 829 819 373 Stage 1 ------355355-459459- Stage 2 ------468474-370360- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1170 - - 1232 - - 292 306 718 290 310 673 Stage 1 ------662630-582566- Stage 2 ------575558-650626- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1170 - - 1232 - - 272 291 718 266 295 673 Mov Cap-2 Maneuver ------272291-266295- Stage 1 ------653621-574546- Stage 2 ------539538-613617- Approach EB WB NB SB HCM Control Delay, s 0.4 0.8 11.9 16.6 HCM LOS B C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 283 718 1170 - - 1232 - - 339 HCM Lane V/C Ratio 0.027 0.038 0.014 - - 0.035 - - 0.083 HCM Control Delay (s) 18.1 10.2 8.1 - - 8 - - 16.6 HCM Lane LOS C B A - - A - - C HCM 95th %tile Q(veh) 0.1 0.1 0 - - 0.1 - - 0.3 2025 Background PM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/07/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 352 8 37 412 17 16 5 103 36 23 16 Future Vol, veh/h 2 352 8 37 412 17 16 5 103 36 23 16 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 2 383 9 40 448 18 17 5 112 39 25 17 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 466 0 0 392 0 0 950 938 388 987 933 457 Stage 1 ------392392-537537- Stage 2 ------558546-450396- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1095 - - 1167 - - 240 264 660 226 266 604 Stage 1 ------633606-528523- Stage 2 ------514518-589604- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1095 - - 1167 - - 210 254 660 179 256 604 Mov Cap-2 Maneuver ------210254-179256- Stage 1 ------632605-527505- Stage 2 ------458500-484603- Approach EB WB NB SB HCM Control Delay, s 0 0.7 13.6 28.1 HCM LOS B D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 219 660 1095 - - 1167 - - 236 HCM Lane V/C Ratio 0.104 0.17 0.002 - - 0.034 - - 0.345 HCM Control Delay (s) 23.3 11.6 8.3 - - 8.2 - - 28.1 HCM Lane LOS C B A - - A - - D HCM 95th %tile Q(veh) 0.3 0.6 0 - - 0.1 - - 1.5 2025 Short Range Total AM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/28/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 15 292 17 49 329 28 3 4 25 10 8 8 Future Vol, veh/h 15 292 17 49 329 28 3 4 25 10 8 8 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 16 317 18 53 358 30 3 4 27 11 9 9 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 388 0 0 335 0 0 846 852 326 853 846 373 Stage 1 ------358358-479479- Stage 2 ------488494-374367- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1170 - - 1224 - - 282 297 715 279 299 673 Stage 1 ------660628-568555- Stage 2 ------561546-647622- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1170 - - 1224 - - 260 280 715 254 282 673 Mov Cap-2 Maneuver ------260280-254282- Stage 1 ------651619-560531- Stage 2 ------521523-610613- Approach EB WB NB SB HCM Control Delay, s 0.4 1 12.1 17 HCM LOS B C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 271 715 1170 - - 1224 - - 327 HCM Lane V/C Ratio 0.028 0.038 0.014 - - 0.044 - - 0.086 HCM Control Delay (s) 18.7 10.2 8.1 - - 8.1 - - 17 HCM Lane LOS C B A - - A - - C HCM 95th %tile Q(veh) 0.1 0.1 0 - - 0.1 - - 0.3 2025 Short Range Total AM Peak Hour Kellar Engineering 6: Mason St. & Garage Access 04/28/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 2.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 34 0 32 58 16 Future Vol, veh/h 0 34 0 32 58 16 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 0 37 0 35 63 17 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 72 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.318 ---- Pot Cap-1 Maneuver 0 990 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 990 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 8.8 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 990 - - HCM Lane V/C Ratio - 0.037 - - HCM Control Delay (s) - 8.8 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - 0.1 - - 2025 Short Range Total PM Peak Hour Kellar Engineering 3: Mason St./Mason Ct. & Cherry St.04/28/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 4.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 352 27 59 412 17 16 5 103 36 23 16 Future Vol, veh/h 2 352 27 59 412 17 16 5 103 36 23 16 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 50 ----100--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 22222222222 Mvmt Flow 2 383 29 64 448 18 17 5 112 39 25 17 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 466 0 0 412 0 0 1008 996 398 1045 1001 457 Stage 1 ------402402-585585- Stage 2 ------606594-460416- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1095 - - 1147 - - 219 244 652 207 243 604 Stage 1 ------625600-497498- Stage 2 ------484493-581592- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1095 - - 1147 - - 187 230 652 161 229 604 Mov Cap-2 Maneuver ------187230-161229- Stage 1 ------624599-496470- Stage 2 ------420465-476591- Approach EB WB NB SB HCM Control Delay, s 0 1 14.1 31.8 HCM LOS B D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 196 652 1095 - - 1147 - - 214 HCM Lane V/C Ratio 0.116 0.172 0.002 - - 0.056 - - 0.381 HCM Control Delay (s) 25.8 11.7 8.3 - - 8.3 - - 31.8 HCM Lane LOS D B A - - A - - D HCM 95th %tile Q(veh) 0.4 0.6 0 - - 0.2 - - 1.7 2025 Short Range Total PM Peak Hour Kellar Engineering 6: Mason St. & Garage Access 04/28/2023 HCM 2010 TWSC Synchro Report Sean Kellar, PE, PTOE Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 32 0 124 68 41 Future Vol, veh/h 0 32 0 124 68 41 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 0 35 0 135 74 45 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 97 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.318 ---- Pot Cap-1 Maneuver 0 959 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 959 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 8.9 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 959 - - HCM Lane V/C Ratio - 0.036 - - HCM Control Delay (s) - 8.9 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - 0.1 - - Sean Kellar, PE, PTOE Principal Engineer Education B.S., Civil Engineering, Arizona State University – Tempe, AZ Registration Colorado, Professional Engineer (PE) Wyoming, Professional Engineer (PE) Idaho, Professional Engineer (PE) Arizona, Professional Engineer (PE) Kansas, Professional Engineer (PE) Missouri, Professional Engineer (PE) Professional Traffic Operations Engineer (PTOE) Professional Memberships Institute of Transportation Engineers (ITE) Industry Tenure 23 Years Sean’s wide range of expertise includes: transportation plan- ning, traffic modeling roadway design, bike and pedestrian facili- ties, traffic impact studies, traffic signal warrant analysis, parking studies, corridor planning and access management. Sean’s experience in both the private and public sectors; passion for safety and ex- cellence; and strong communication and collaboration skills can bring great value to any project. Prior to starting Kellar Engineering, Sean was employed at the Missouri Department of Transportation (MoDOT) as the District Traffic Engineer for the Kansas City District. Sean also worked for the City of Loveland, CO for over 10 years as a Senior Civil Engineer supervising a division of transportation/traffic engineers. While at the City of Loveland, Sean managed several capital improvement projects, presented several projects to the City Council and Planning Commission in public hearings, and managed the revisions to the City’s Street Standards. Sean is also proficient in Highway Capacity Software, Synchro, PT Vissim, Rodel, GIS, and AutoCAD. WORK EXPERIENCE: Kellar Engineering, Principal Engineer/President – January 2016 – Present Missouri Department of Transportation, District Traffic Engineer, Kansas City District – June 2015 – January 2016 City of Loveland, Colorado, Senior Civil Engineer, Public Works Department – February 2005 – June 2015 Kirkham Michael Consulting Engineers, Project Manager - February 2004 – February 2005 Dibble and Associates Consulting Engineers, Project Engineer – August 1999 – February 2004