From: Ted Shepard
Sent: Monday, January 30, 2017 9:14 AM
To: Pete Wray
Subject: FW: Throrell Park PDP -2nd Submittal
f.y.i.
Ted Shepard
Chief Planner
City of Fort Collins
970-221-6343
From: Steve Smith f mailto:SSmith(&phelpsengineerinq.net]
Sent: Monday, January 30, 2017 8:35 AM
To: Ted Shepard
Cc: Lonny Phelps
Subject: RE: Throrell Park PDP -2nd Submittal
Thanks Ted. In the future I will be in touch with Pete Wray directly but for the time being will cc: you on my emails until
we decide that we can cease with that altogether (I would imagine that will happen in the very near future).
The greatest change to our plans is the relocation of the Main Park/Detention area (referred to as Pond West) to a
location further west. This was done primarily at the request of the Rennat's to lessen the impact of the drainage outfall
alignment on their property. Our general approach to the lotting, communal common areas and alley access plan was
not revised. Another substantial revision is related to drainage and our handling (capture and conveyance) of 'private'
storm drainage (alleys and communal areas) versus 'public' (dedicated public right-of-way) storm drainage.
I will await Pete's response to my previous email questions. Please note that we are, at a minimum 2-3 days out before I
will know of our exact desired date for our 2" d submittal.
With regards,
U PHELPSfl
stevev, c,. Sv,dtk, p.E.
sauov JwIect £awet
7200 East Hampden Ave
Suite 300
Denver, CO 80224
Email:ssmith @ ohebsenaineerina. net
Phone: 720-407-8449
From: Ted Shepard [mailto:TSHEPARD@fcgov.com]
Sent: Monday, January 30, 2017 8:17 AM
To: Steve Smith <SSmith@phelpsengineering.net>
Cc: Pete Wray <PWRAY@fcgov.com>
Subject: RE: Throrell Park PDP -2nd Submittal
Good morning Steve, I had to hand off Thorell Park to my colleague, Pete Wray. At one point in the last few
weeks/months, I was the project planner assigned to 18 active projects as well as some policy items at the Council
level. A look over the horizon tells us that more development applications are on the way.
Pete is coming off a long-range planning effort related to our Old Town Neighborhoods and now has some ability to
absorb some of the current planning workload. Pete is familiar with the area as he was the project planner for the Fossil
Creek Reservoir Area Plan that was adopted in conjunction with Larimer County back in 1999 /2000.
I'll still be in the picture as sort of a "player -coach" but Pete will be handling the day-to-day as the project planner.
Looking forward to seeing the progress you've made.
Please let me know if you have any questions.
Thanks, Ted
Ted Shepard
Chief Planner
City of Fort Collins
970-221-6343
From: Steve Smith [mailto:SSmith@phelpsengineering.net]
Sent: Monday, January 30, 2017 7:54 AM
To: Ted Shepard
Cc: Lonny Phelps
Subject: Throrell Park PDP -2nd Submittal
Ted, we are nearing the completion of the required revisions and are preparing for our 2"d submittal to the City.
Could you please let me know how many copies/sets (hard/paper copies) are required of the following:
-Utility Plan Set
-Drainage Report
-Site Plan
-Preliminary Plat
-Comment Response Letter
For all paper submittal materials we will also be supplying your office will a digital copy as well.
Of note, we will be submitting simultaneously two (2) variance request letters to accompany the PDP package. These
will be transmitted under separate cover and directly to Mr. Mark Viratta.
Thank you,
U PHELPS
stevevu c,. smt th, P.E.