Loading...
HomeMy WebLinkAboutTHE SAVOY - FDP230012 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTProject:Disturbed Acres:10.56 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price each 6 $250.00 $1,500.00 L.F.4,495 $1.10 $4,944.50 each 50 $125.00 $6,250.00 each 2 $1,700.00 $3,400.00 Outlet Protection each 0 $900.00 $0.00 each 1 $1,250.00 $1,250.00 Stabilized Staging Area S.Y.0 $4.75 $0.00 Sub-Total:$17,344.50 1.5 x Sub-Total:$26,016.75 Amount of security:$26,016.75 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$26,016.75 Fields in yellow should be amended for this project. “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Silt Fence Escrow Amount Vehicle Tracking Control Pads Concrete Washout Area Inital Erosion and Sediment Control Escrow/Security Calculation for the City of Fort Collins BMP Amount Inlet Protection Rock Socks Miniumum Escrow Amount The Savoy 6/13/2023 8:27 AM P:\514-003\Drainage\Reports\SWMP Report\514-003-The Savoy-EC_Escrow Project:Disturbed Acres:10.56 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price each 97 $250.00 $24,250.00 Rock Socks each 17 $90.00 $1,530.00 each 6 $1,000.00 $6,000.00 Sub-Total:$31,780.00 1.5 x Sub-Total:$47,670.00 Amount of security:$47,670.00 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$47,670.00 Fields in yellow should be amended for this project. Escrow Amount “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Interim Erosion and Sediment Control Escrow/Security Calculation for the City of Fort Collins The Savoy BMP Amount Inlet Protection Miniumum Escrow Amount 6/13/2023 8:27 AM P:\514-003\Drainage\Reports\SWMP Report\514-003-The Savoy-EC_Escrow Project:Disturbed Acres:10.56 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price acre 1.75 $1,000.00 $1,748.00 Sub-Total:$1,748.00 1.5 x Sub-Total:$2,622.00 Amount of security:$2,622.00 Total Acres x Price/acre:$10,560.00 $1,000.00 Sub-Total:$10,560.00 1.5 x Sub-Total:$15,840.00 Amount to Re-seed:$15,840.00 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$15,840.00 Fields in yellow should be amended for this project. Final Erosion and Sediment Control Escrow/Security Calculation for the City of Fort Collins The Savoy BMP Amount Reseeding Amount Unit Price of Seeding per acre: Miniumum Escrow Amount Escrow Amount “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Vegetate Landscaped Areas 6/13/2023 8:27 AM P:\514-003\Drainage\Reports\SWMP Report\514-003-The Savoy-EC_Escrow