HomeMy WebLinkAboutMIRAMONT VILLAGE PUD - PRELIMINARY - 54-87AH - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWV
CommiMy Planning and Enviro
Current
City of Fort Collins
November 8, 1995
Mr. Jim Postal
The James Company
c/o Eldon Ward, Cityscape Urban Design
3555 Stanfoard Road, Suite 1.05
Fort Collins, CO 80525
Dear Sirs:
For your information, attached is a copy of the Staffs comments concerning Mirarnont Patio
Homes on Parcel A, Oak -Cottonwood Farm presented before the Conceptual Review Team on
November 6, 1995..
The comments are offered informally by Staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review process,
please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Senior Planner
TS/gjd
Attachments
cca Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (970) 224-6002
11
11
CONCEPTUAL
MEETING DATE: November 6, 1995
COMMENTS
ITEM: Miramont Patio Homes on Parcel A Oak -Cottonwood Farm
APPLICANT: Mr, Jim Postal, The James Company, 2919 Valmont Road, Suite
109, Boulder, CO., 80301 c/o Eldon Ward, Cityscape Urban
Design 3555 Stanford Road, Suite 105, Fort Collins, CO. 80525.
LAND USE DATA: Request for 52 zero lot line patio homes on nine acres located at
the northwest corner of South Lemay Avenue and Southridge Greens Blvd. (extended),,also,,
,known_as Parcel-A_._of Oak-Cottonwood.Farm--.Overall_Developmerit _Plan.., Private street may be
gated for security purposes.
COMMENTS:
Electrical service will be provided by City of Fort Collins Light and Power Department.
If the streets are private, Light and Power will not collect the front footage fee.
Therefore, Light and Power will not provide streetlighting and electrical transformers will
be placed above ground. Transformers will be provided in underground vaults if the
developer makes the proper financial arrangements with Light and Power. Normal fees
will be assessed for lots along dedicated roadways. Joint trenching with U.S. West and
Columbine Cablevision is allowed with proper design and coordination. For further
information, please contact Kevin Westhuis, 2267 .1-00.
2. Water and sanitary sewer will -be provided by the Fort Collins -Loveland Water District
and the South Fort Collins Sanitation District.
3. Each unit will be assessed the Parkland Development Fee. This fee is presently $813
payable at the time of building permit issuance. This fee is scheduled to increase
annually based on the Denver -Boulder consumer price index.
4. The site is zoned R-P, Planned Residential, with the condition that the property develop
as a planned unit development. The site is also located in the Residential Neighborhood
Sign District.
5. The site must meet the access and water supply requirements of the Poudre Fire
Authority. It appears that three to four fire hydrants may be needed. It may be that the
cul-de-sac and emergency access drive will not be needed if Lots 21 and 22 front on the
COMMUNITY PLANNING&
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
loop road. If the cul-de-sac and emergency second point of access are required, then they
must be designed to the standards of Poudre Fire Authority.
6. The Poudre Fire Authority will require special access devices if the project becomes
gated at the public street. This may involve a system whereby if a 911 call is placed from
within the project, then the gate automatically opens and cannot be reset unless by the
emergency provider.
7. With the zero lot line configuration, there must be at least three feet between building and
property line or six feet between buildings. If these distances cannot be provided, then an
exterior wall/property line maintenance/access easement must be provided..
8. The site is located in the Fossil Creek Drainage Basin. The Storm Drainage Fee in this
basin is $2,274 per acre subject to the amount of impervious surface and the runoff
coefficient. The Drainage Report and Drainage and Grading Plan must conform to the
Oak -Cottonwood Farm Overall Drainage Plan. This plan calls for a water quality pond
south of the street. The drainage issue may be available capacity in the street to carry the
upstream developed flows. The culvert planned to cross the street may have to be
increased in diameter.
9. The owners of the property have stripped the site in violation of the City's Erosion
Control Ordinance. The owners must submit an Erosion Control Plan and pay the
required deposit to the Stormwater Utility.
10. At the time of submittal, a Drainage Report, Drainage and Grading Plan, and Erosion
Control Plan, meeting the submittal requirements, are required. If these documents are
not in proper form, the project may be pulled from the review cycle..
11. The Street Oversizing Fee is $584 per dwelling unit payable at the time of building
permit issuance.
12. Utility Plans for the public improvements will be required at the time of submittal.
13. The private drives must be dedicated on the plat as a separate tract.
1..4. There may be a sight distance problem on the inside of the curve of Southridge Greens
Blvd. If so, then the landscape plan may have to be modified accordingly.
15. Southridge Greens Blvd. must align with the existing street. An offset will not be
allowed. Therefore, the necessary right-of-way must be obtained from the property
owner to the south. For further information regarding engineering or public improvement
0.
issues, please contact Shertf Wamhoffat 221-675.0
16. The traffic impact analysis can take the form of a letter or memo that updates the overall
study. Please call Eric Bracke, 22.1-6608 to verify the scope of the study..
17. Staff is concerned about installing a gate across the public street/private drive
intersection. Such a feature is out of character for Fort Collins. There is no gated
subdivision in Fort Collins nor does the crime rate justify one. The concept of a gate is a
solution to a set of problems that do not exist in our community. The concept is an
import from other regions of the country that face a different set of circumstances. If it is
the developer's desire to create an upscale image, then a variety of other design solutions
are available. There are significant concerns regarding efficient delivery of emergency
services. There are many residential projects in Fort Collins that are more affluent,
upscale, and exclusive that are maintaining their distinct character and property values
without the need for a gate. If a gate is included as part of the submittal, Staff will
recommend to the Planning and Zoning Board that it be deleted.
18. A neighborhood meeting will not be necessary. In order to provide ample time for public
comment, however, the developer will be billed for a mailing at the very beginning of the
review process in addition to the standard notifications. If significant issues arise, then a
neighborhood meeting, after submittal, may be warranted.