May 23, 2003
Mr. Fred Banfield
Kimley — Horn and Associates
950 Seventeenth Street, Suite 1050
Denver, CO 80202
Dear Fred:
For your information, attached is a copy of the Staff s comments for the Sam's Club at
Harmony Market Expansion (4700 Boardwalk Drive) which was presented before the
Conceptual Review Team on May 19, 2003.
The comments are offered by staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at
the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 970-221-6750.
Sincerely,
Ted Shepard
Chief Planner
281 North College Avenue e P.O. Box 580 9 Fort Collins, CO 80522-0580 • (970) 221-6750 o FAX (970) 416-2020
1P
ITEM: Sam's Club Expansion at Harmony Market — 4700 Boardwalk
Drive
MEETING DATE: May 19, 2003
APPLICANT: Sam's Club c/o Mr. Fred Banfield, Kimley-Horn and Associates,
950 Seventeenth Street, Suite 1050, Denver, CO. 80202.
LAND USE DATA: Request to expand Sam's Club by approximately 30,000 square
feet. The expansion would be along the west side of the building. The expansion
includes shifting the existing automotive bays for the tire mounting area from the north
elevation to the expansion area. There would be a re -configuration and a reduction in
parking on the west side of the site. There would be significant interior remodeling as
well.
COMMENTS:
1. The project is zoned H-C, Harmony Corridor and is part of a Regional Shopping
Center as classified by the Harmony Corridor Plan. The expansion would be
processed as a Major Amendment. Submittal documents will include a site plan,
landscape plan; architectural character elevations and civil engineering documents
(utility plans). As a major amendment, the request, to the maximum extent
feasible, shall comply with the applicable standards contained in Articles 3 and 4.
In other words, a project that was originally part of a center that was reviewed and
approved as a P.U.D. under the Land Development Guidance System is now under
the jurisdiction of the Land Use Code.
2. The change to the access and circulation of the westerly parking lot will be
considerable. Please note that 6% of the interior space of all parking lots with less
than 100 spaces and 10% of the interior space of all parking lots with 100 or more
spaces shall be landscape areas.
3. The site will continue to be served by the City of Fort Collins Light and Power
Department. If there is an increase in the electrical service or panel size, then the
applicant must pay the net difference in site development charges for the larger
service. For further information, please contact Bruce Vogel, 970-221-6700.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
4. The site is located within the McClelland - Mail Creek Drainage Basin. The
development charges are $3,717 per developed acre._ As an expansion, this fee
would apply to the newly created impervious surface only and only if over 350
square feet in area.
5; An updated drainage and erosion control report and construction plan is required
and they must be prepared by a professional engineer registered in Colorado.
Additional detention may be required since some landscape area is being replaced
with a building. Extended detention for water quality treatment is required. The
original detention pond was not built for water quality so a variance request may
be needed.. If additional pervious area can be added to offset the new building;
the water quality and quantity detention are not needed. It was mentioned there is
some wetland area that has developed. This could count as water quality
treatment known as Best Management Practices. The site is on Stormwater
inventory map #0Q. A copy of the map can be obtained -from the Utility Service
Center at 700 Wood Street. For further information, please contact Glen
Schlueter, 221-6700. ,
6. The site will continue to be served by the City of Fort Collins Water and.
Wastewater Department. There is an existing eight -inch diameter sanitary sewer
line in the north — south drive aisle closest to the west elevation. This line cannot
be under the building expansion so it will have to be moved. In its new location,
the line must be placed in the middle of a 30-foot wide utility easement. Before
moving this line, the slope should be verified so that there are no flow problems
with the new location and that the new location will vertically align with the
service line elevations. There may be a need to install or upgrade a grease
interceptor. This will be evaluated during the building permit review process.
7. If there is an increase in either the water or sanitary sewer service, then Plant
Investment Fees and the Raw Water Acquisition Fee would be charged for the net
difference in tap size. Water conservation standards for landscaping would apply.
There is a separate plan check fee. For further information, please contact Roger
Buffington, 221-6700.
8. The Poudre Fire Authority will require that the access drive be dedicated as an
emergency access easement with curbs painted red and signs stating "No Parking
— Fire Lane."
9. Any building with over 5,000 square feet of uncontained floor area must be
equipped with an automatic fire extinguishing system.. For further information,
please contact Ron Gonzales, 221-5670.
10. The Street Oversizing Fee will apply, for the addition only, and due at the time of
building permit issuance. Please note that these fees are adjusted annually. There
may be one fee for retail and one fee for the automotive use. For further
information, please contact Matt Baker, 221-6605.
11. In addition, the City collects the Latimer County Road Impact fee.
12. A Transportation Impact Study may be required. Please contact Eric Bracke to
determine the scope of the study at 970-221-6630. This study will help determine
the extent of off -site street improvements necessary to mitigate the impact of the
project on the public street system. For example, a northbound Boardwalk double.
left turn at Harmony may be needed. Since the site is well south of this
intersection, additional right-of-way dedication for Boardwalk Drive will not be
required. If required, the Transportation Impact Study (T.I.S.) must also perform
a Level of Service analysis for alternative modes. Enhanced cross -walks should
be provided across the internal drive aisles. For further information, please
contact Tom Reiff, 224-2040.
13. The new access drive will shift closer to the intersection of Boardwalk and Oak
Ridge Drive. The standard is 200 feet of separation from centerline to centerline.
If this distance is less than 200 feet, then a variance must be submitted to the City
Engineer for administrative consideration.
14. Any street cut into Oak Ridge Drive must be patched according to standards.
This may include patching the entire width of the on -street bike lane.
15. The existing easement for the sewer line will have to vacated according to normal
standards and procedures. The new easement will have to be dedicated by
separate legal document.
16. The standard Utility Plan, Development Agreement and Development
Construction Permit will be needed. For further information, please contact Marc
Virata, 221-6605.
17. A pedestrian walkway will be required around the addition to connect the public
walk on Oak Ridge Drive to the main entrance.
18. A Fugitive Dust Permit will be needed from the Larimer County Health
Department during the construction phase.
19. The detention pond on the south side of the site. now features wetland plants. This
should be encouraged as this plant material provides for water quality. Please
consider planting wetland species in areas that are predominantly wet and difficult
to maintain as turf.
20. The loss of existing trees should be evaluated by Tim Buchanan, City Forester.
Significant trees lost to construction must be mitigated as per the formula in the
Land Use Code. If possible, existing trees should be moved and re -planted on
site. For further information, please contact Tim Buchanan, 221-6361.
21. The are no issues associated with the loss of parking.
22. As we have discussed in prior meetings, there needs to be direct and well -
designed pedestrian sidewalk and enhanced crosswalks to promote walking from
the adjacent neighborhood to the main entrance. This walk should be designed in
coordination with the architecture so that the features work in concert. If
necessary, street trees could be placed in tree grates in order to accommodate a
safe walking environment.
23. The screen wall on the south side of the site should be extended to block views of
the loading area from Oak Ridge Drive. This wall should match the existing and
extend as far to the east as possible.
24. The west elevation must comply with the applicable standards of the Big Box
standards to the maximum extent feasible.
25. The existing rooftop mechanical equipment, including satellite dishes, must be
screened more effectively. Much of this equipment was added after 'initial
construction. Screen walls or extended parapets should be added as part of the
overall upgrade to the site.
26. Staff has expressed a concern to the store in over the years regarding
the overnight parking of recreational vehicles. This activity is a zoning violation.
A sign should be posted in the parking lot, in a visible location, that clearly states
that such parking is prohibited.
27. Staff has received input from the property management firm for the Harmony
Market Owners' Association. Based on this input, there is a significant concern
about maintenance of common areas, the parking lot and landscaping. The
Association is particularly concerned about the common areas on the southern and
western portions of the shopping center. This area is a prominent entry point and
Sam's Club does not provide a level of maintenance that is satisfactory to the
Association. The Association would like to discuss an arrangement with Sam's
Club where the Association would assume maintenance of the southern and
western common areas.
28. In addition, the Association requests that Sam's Club provide an asphalt overlay
of their parking lot so that the entire shopping center parking lot is brought up to a
standard consistent for the entire Association.
29. Finally, the Association is very concerned about the lack of maintenance of the
landscape islands and the amount of litter accumulated in the parking lot and
grounds. The landscape islands.need to be sprayed for weeds, rock mulch needs
to be replaced and litter removed. These measures will bring the Sam's Club
portion of the shopping center up to the level of standard for the balance of the
W
center. For further information, please contact Mr. Justin Morrison, Mountain `N
Plains, Inc., 970-221-2323, or by cellular phone, 970-566-1832.
30. A neighborhood information meeting will be required. It is recommended that the
meeting take, place as close to submittal as possible. The Planning Department'
will create the notification map for the neighborhood meeting. Please notify the
Planning Department at your earliest convenience if you desire to proceed to this
next stage. Design issues associated with lighting, landscaping, architecture and,
traffic are sensitive issues for the Fairway Estates neighborhood. Screening the
loading area is a concern for the Miramont neighborhood. Parking lot upgrades
and enhancing overall long term maintenance on a consistent basis are concerns