Loading...
HomeMy WebLinkAboutTHE RAMPARTS AT MIRAMONT PUD - FINAL - 54-87AG - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet The RamparU at Miramont Final PUD The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan: X 1. Application (1 copy).. X 2. Filing fee ($2,808.00 + $1,0.88.00 for the plat = $3,896.00) X 3. Site plan (25 folded copies). X 4. Landscape plan (16 folded copies). X___ 5. Final subdivision plat (21 folded copies). X 6. Utility plans (10 unfolded copies). X 7. Final drainage report and plans and grading plans (4 copies). X 8. Other documentation as determined by special circumstance. Land use breakdown (2 copies). Legal description (2 copies). All Development Criteria (3 copies). 4.16