HomeMy WebLinkAboutMARS LANDING - FDP210024 - SUBMITTAL DOCUMENTS - ROUND 5 - UTILITY PLANS76' ROW
C
54' -
11'3'5'8'TRAVEL LANEWALKPARKING6'5'BIKE LANEPARKWAYMINOR COLLECTOR STREET
MARS DRIVEBUFFERL
11'3'5'8'TRAVEL LANEWALKPARKING6'5'BIKE LANEPARKWAYBUFFER6-LANE ARTERIAL
COLLEGE AVENUE
LC
141' ROW
12'11'11'3'7'10'7'
15' UTIL
EASEMENT
BUFFERBIKE LANEPARKWAYWALKTRAVEL LANETRAVEL LANETRAVEL LANE12'11'11'3'7'10'7'
15' UTIL
EASEMENT
BUFFERBIKE LANEPARKWAYWALKTRAVEL LANETRAVEL LANETRAVEL LANE107' ROADWAY
19' MEDIAN
UTILITY PLANS FOR:
Goodwin Knight
Mark Johnson, RLA
8605 Explorer Dr., Suite 250
Colorado Springs, Colorado 80920
719.598.5192
DEVELOPER / APPLICANT
GEOTECHNICAL ENGINEER
Earth Engineering Consultants, LLC
4396 Greenfiled Drive
Windsor, Colorado 80550
970.545.3908
PROJECT TEAM:
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing
department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the
review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason
as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the
construction phase.
DISCLAIMER STATEMENT:
I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort
Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions,
and record conditions that I have noted on these plans.
CERTIFICATION STATEMENT:
Galloway & Company
Sarah Adamson, RLA
6162 S. Willow Drive, Suite 320
Greenwood Village, Colorado 80111
303.770.8884
LANDSCAPE ARCHITECT
UTILITY CONTACT LIST: *
Galloway & Company
James E. Prelog
5265 Ronald Reagan Blvd., Suite 210
Johnstown, Colorado 80534
970.800.3300
SITE ENGINEER / SURVEYOR
GAS Xcel Energy Stephanie Rich (970) 225-7828
ELECTRIC City of Fort Collins Light and Power Luke Unruh (970) 416-2724
CABLE Xfinity Don Kapperman (970) 484-7166
TELECOM. Centurylink William Johnson (970) 377-6401
WATER FCLWD Sam Lowe (970) 226-3104
WASTEWATER SFCSD Sam Lowe (970) 226-3104
STORMWATER City of Fort Collins Utilities Wes Lamarque (970) 416-2418
UTILITY COMPANY CONTACT PHONE NUMBER
* ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN
APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT,
PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION.
PROJECT BENCHMARKS:
BENCHMARKS
ELEVATIONS ARE BASED ON CITY OF FORT COLLINS VERTICAL CONTROL NETWORK
PROJECT DATUM: NAVD88
BENCHMARK '2-12' IS LOCATED & DESCRIBED AS FOLLOWS:
SOUTHWEST CORNER OF SOUTH COLLEGE AVE. AND SKYWAY DR. ON A CONCRETE TRAFFIC SIGNAL BASE.
ELEVATION: 5005.56' (NAVD 88)
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - 3.19'.
BENCHMARK '38-94' IS LOCATED & DESCRIBED AS FOLLOWS:
AZIMUTH MARK (3 1/4" ALUMINUM CAP) ON THE NORTH SIDE OF TRILBY RD. 1/2 MILE WEST OF COLLEGE AVE. AT THE
SOUTHWEST CORNER OF 508 WEST TRILBY RD. (GOOD SAMARITAN RETIREMENT CENTER). ALSO 5.5 FT WEST OF A
POWERPOLE AND 24.5 FT SOUTH OF A WOOD FENCE.
ELEVATION: 5093.76' (NAVD 88)
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - 3.18'.
SCALE: NTS
SHEET INDEX
MARS LANDING
OUTLOT A, SOUTH COLLEGE STORAGE SUBDIVISION
LOCATED IN THE SOUTHEAST QUARTER OF SECTION 11, T. 6 N., R. 69
W. OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
JUNE 2023
S. COLLEGE AVEW. TRILBY RDMARS DRVICINITY MAP
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\gnk08_c0.0_cover.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
COVER SHEET
C0.0
SITE
SKYWAY DR
C0.0 COVER SHEET
C0.1 GENERAL NOTES
C1.0-C1.1 EXISTING CONDITIONS & DEMO PLAN
C2.0 OVERALL GRADING PLAN
C2.1-C2.2 DETAILED GRADING PLAN
C3.0 UTILITY PLAN
C3.1 WATER PLAN & PROFILE
C3.2-C3.3 UTILITY DETAILS
C4.0 SANITARY SEWER PLAN & PROFILE
C4.1 SANITARY SEWER DETAILS
C5.0 ROOF STORM DRAIN PLAN & PROFILE
C5.1-C5.3 STORM DRAIN PLAN & PROFILE
C5.4-C5.8 STORM DRAIN DETAILS
C7.0 MARS DRIVE PLAN AND PROFILE
C7.1 MARS DRIVE CROSS SECTIONS
C7.2 COLLEGE AVENUE SIDEWALK PLAN
C7.3 SIGNAGE AND STRIPING PLAN
C8.0-C8.1 INITIAL EROSION CONTROL PLAN
C8.2-C8.3 FINAL EROSION CONTROL PLAN
C8.4-C8.6 EROSION CONTROL DETAILS
C9.0 DRAINAGE PLAN
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
District Engineer Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
DateCity Engineer,
Date
Date
Date
Date
Stormwater Utility,
Parks Planning and Development,
Traffic Operations,
Date
APPROVED:
APPROVED:
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility,
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner,
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\gnk08_c0.0_cover.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
GENERAL NOTES
C0.1
A. GENERAL NOTES
1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area
Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the
most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins.
2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans
after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans.
4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said
engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer
who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of
Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these
plans.
5.All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to
verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for
unknown underground utilities.
7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to
have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective
representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all
existing utilities that conflict with the proposed improvements shown on these plans.
8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings
required.
9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the
design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely
fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility
service as well as the utility companies.
11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a
minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to
commencement of any work.
12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be
constructed prior to installation of the water lines and dry utilities.
13.The minimum cover over water lines is 4.5 feet and the maximum cover is 6.0 feet unless otherwise noted in the plans and approved by the Water Utility.
14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm
sewer, channel, irrigation ditch or any waters of the United States.
15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality
Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities
shall be the responsibility of the property owner(s).
17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved
by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of
occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release
of any building permits in excess of those allowed prior to certification per the Development Agreement.
18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from
groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain
its water, wastewater, and/or storm drainage facilities in the development.
19.All recommendations of the final Drainage and Erosion Control Reports for Mars Landing dated 06.21.2023 by Galloway and Company, Inc., shall be followed and
implemented.
20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair
by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within
24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street
inspector.
22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if
applicable.
23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify
the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days
prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper
notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not
to accept the improvement if subsequent testing reveals an improper installation.
24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to
the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report,
the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness
section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be
submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur
until the City of Fort Collins Engineer approves the final report.
25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections,
inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these
elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation
of base course or asphalt will be allowed on the streets.
26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these
standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce
the excavation necessary for building connections.
27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these
districts.
28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard
Area Mitigation Regulations in force at the time of final plat approval.
29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a
permit.
30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA
Publication 2226, Excavating and Trenching.
31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins,
Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any
and all traffic control devices as may be required by the construction activities.
32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations
Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be
charged for the labor, materials and equipment to reinstall the sign as needed.
33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street
operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development.
34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on
Sundays or holidays, unless there is prior written approval by the City of Fort Collins.
35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated
to be provided, installed, or constructed, unless specifically noted otherwise.
36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and
annotate the dimension on the as-built record drawings.
37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of
any permits and extension agreements needed for the job.
38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall
contact the Designer and the City of Fort Collins Engineer immediately.
39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the City of Fort Collins
Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer.
40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of
bearings. Please see the benchmark statement on cover sheet for benchmark information.
41.All stationing is based on centerline of roadways unless otherwise noted.
42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and
improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless
otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be
documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street
Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets
where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay
shall be made by the City of Fort Collins Engineer and/or the City of Fort Collins Inspector at the time the cuts are made.
44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades
and condition as required by these plans.
45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a
minimum period of two years from the date of acceptance.
CONSTRUCTION NOTES
A. GRADING AND EROSION CONTROL NOTES
These notes are a summary for the legal requirements, that are set forth in the Fort Collins Stormwater Criteria Manual (FCSCM), and that any conflict is resolved by the
more stringent requirement controlling.
1.The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity (here after
referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as an attempt to identify
erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants from leaving the project site as an
illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control Measures and should be used to identify and
define what is needed on a project.
2.The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development Agreement,
the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project.
3.The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization of the
construction site.
4.The City Erosion Control Inspector shall be notified at least twenty-four (24) hours prior to the desired start of any construction activities on this site to allow adequate
time for on-site confirmation (initial inspection which can take up to two business days after receiving the request) that the site is in fact protected from sediment and
pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in advance so that demolition,
clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before construction activities commence is an
automatic “Notice of Violation” and can result in further enforcement actions.
5.The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes but is not
limited to: trees, shrubs, lawns, walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for removal, relocation, or
replacement in the course of construction.
6.At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and ultimately
removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities associated with this
project.
7. All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities commencing.
8.As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different, to what is
shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state and progress of
construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control Inspector. The Developer
shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with updates being initialed and dated. These
site inspections and site condition updates shall be made available upon request by the City.
9. All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not limited to the
erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City, County, State, and
Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be responsible to comply with all of
these aforementioned laws and regulations.
10.The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering, Clean Water
Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or copies shall be made
available upon request by the City.
11.The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections, etc. of the
Control Measures involved in the construction activities.
12.The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site conditions
around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any explanations,
interpretations, or supplementary data provided by others.
13.All Control Measures shall be installed in accordance with the Manual.
14.The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority.
15.As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In these cases, a
variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual.
16.Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction and within
24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor.
17.All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended function. All
retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any
drainage way.
18.Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than the original
Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites have shown to be
an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic.
19.Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and acceptance by
the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted, reviewed and accepted
to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound engineering and hydrological practices
LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS
20.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by the City.
Disturbances beyond these limits will be restored to original condition.
21.Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area
required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction activities in a
way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical advancing the schedule
on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts shall start as soon as possible to
return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible.
22.All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from leaving the
site.
23.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all times by
equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or other permanent
erosion control is installed.
24.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening, watering, and
down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code §12-150. All stockpiles shall
be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or abandonment of the project. All
off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to using the area to store material. If frequent
access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented.
25.All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control Measures
must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report.
26.All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with Control
Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be thoroughly
cleaned out.
27.All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the use of
Control Measures.
28.All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have some form of
effective sediment control as the, or as part of the, perimeter control.
29.All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use of Control
Measures.
30.No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or permanent
erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that is temporarily halted
and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector. During a season when seeding
does not produce vegetative cover, another temporary erosion control shall be implemented with or until temporary seeding or permanent erosion control can be
performed.
31.All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on those cases
where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will need protection on that down
gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification.
VEHICLE TRACKING
32.At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at least
one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point where
vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities).
33.In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets located
near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system.
34.City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any source.
City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential for migration of
such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and shall be removed and
legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these sections of code and shall not be
permitted in the street right of way (public or private).
35.If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control Inspector.
LOADING AND UNLOADING OPERATIONS
36.The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close proximity to the
work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment deposition that could impact
water quality.
OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS
37.Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection and will
generally be located where practical at least fifty (50) feet from any permanent or interim drainage ways.
38.Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels, paints, solvents,
detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they should be stored inside (vehicle,
trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside in a raised (high spots or on
pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary containment or other Control Measure shall be
adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part
of the routine inspections.
VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING
39.Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas. This area
shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the
routine inspections. All areas shall keep spill kits and supplies close.
SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS
40.The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities that result in
fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required practices shall be
implemented and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until the wind subsides as
determined by any City Inspectors.
CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT
41.All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures shall be
located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine
inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent access from hardscape to the Control
Measure is to occur, a structural tracking Control Measure shall be implemented. These Control Measures shall be frequently cleaned out.
42.The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping wash water
on to the dirt or other uncontrolled locations.
DEDICATED ASPHALT AND CONCRETE BATCH PLANTS
43.Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request and plan to
reduce pollutants associated with that type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer shall inform the
erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site.
CONCRETE SAW CUTTING MATERIALS
44.Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent material from
leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and legal disposal.
WASTE MATERIALS STORAGE AND SANITARY FACILITIES
45.Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage
ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not able to cover, locating
said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the container. The Developer is required
to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers.
46.Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be located as
far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This consists of the
facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways.
OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS
47.Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any stormwater
conveyance, notify the City of Fort Collins Utilities by email at erosion@fcgov.com or phone (970) 817-4770. For any significant, major, or hazardous spills, notify the
City of Fort Collins Utilities by phone only after Emergency Response (911) has been notified and is on route, County Health Department (LCDHE) has been notified
through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill Hotline Incident Reporting have been contacted 1-877-518-5608. Written documentation
shall be provided to the City within 5 days of the event. All spills shall be cleaned up immediately.
48.Selection of “plastic welded” erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to cause
entrapment issues.
FINAL STABILIZATION AND PROJECT COMPLETION
49.Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and before turning
the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility.
50.All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures.
51.All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days of final
grading.
52.Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through 12-132 of
the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code.
53.All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements.
54.All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill seeding and
shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas not practical to drill
seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification.
55.All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use of
crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been established. Areas
of embankments having slopes greater than or equal to 3H:1V shall be stabilized with an erosion mat or approved equal to ensure seed will be able to germinate on
the steep slopes. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented along with, or until,
temporary seeding or permanent erosion control can be performed.
56.The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover has been
established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control Measures.
57.The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control Measures
must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control Measure is removed, the
Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at which the site has been deemed
stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All measures shall be removed within 30 days after
final stabilization is achieved.
58.The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been reached
and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will be considered
completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties.
B. STREET IMPROVEMENT NOTES
1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here.
2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street
construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to
placement of any asphalt.
3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean
construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be
allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been
inspected and approved by the City of Fort Collins Engineer.
5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed.
6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be
documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished
patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay
work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work.
7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the
Right-of-Way Work Permit traffic control plan.
8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold
more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is
proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base
material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires
inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits
excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth,
non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of
an Inspector.
C. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here.
2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5.All lane lines shall be latex paint.
6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their
placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols.
7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8.Latex paint applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10.All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field
inspection must be corrected before the 2-year warranty period will begin.
12.The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13.Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer
reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage
according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction
(except fair wear on traffic markings).
15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
16.Contractor is responsible for removing all anchors, posts, signs and/or delineators in Construction area. Contractor may keep the signs, or call the City Traffic Division
to have them removed.
17.No "Reset" anchors, posts, signs, and/or delineators will be accepted.
18.All anchors, posts, signs, and/or delineators shall be new and be consistent with the LCUASS criteria.
D. STORM DRAINAGE NOTE
1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities
shall be the responsibility of the property owner(s).
2.All recommendations of the final Drainage and Erosion Control Reports for Mars Landing dated 06.21.2023 by Galloway and Company, shall be followed and
implemented.
3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved
by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of
occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release
of any building permits in excess of those allowed prior to certification per the Development Agreement.
4.See City of Fort Collins Stormwater Criteria Manual – Appendix F Construction Control Measures Standard Notes and Standard Erosion Control Notes.
5.18" minimum vertical separation fro other utilities is required including storm pipes and irrigation mains. Less than 18" will require a steel or concrete encasement of the
lower sewer or water.
UEUEUEUEUEGGGGUTUTUTUTUTUTWSTMSTM
XXXXXXX-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C1.0_Existing Conditions.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SCALE: 1"=30'
0 15 30
EXISTING CONDITIONS &
DEMO PLAN
C1.0
UE
W
SS
STM
G
UT
SS
SSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS
STMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTGGGGGGGSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
UT
UT
UT
UT
UT
UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT
STM STM STM
UEUEUEUEUEUEUEUEX X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C1.0_Existing Conditions.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SCALE: 1"=30'
0 15 30
OFFSITE EXISTING
CONDITIONS & DEMO PLAN
C1.1
UE
W
SS
STM
G
UT
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
UEUEUEUEUEUE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UEUEUEUEUET
T
UEUEUEUEUEUEUEUEUEUE UE UE UE
UE UE UE UE UE UE UEUEUEUEUEUEUEUEUEESTMSTM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C3.0_Overall Grading Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
OVERALL GRADING PLAN
C2.0
SCALE: 1"=30'
0 15 30
EXISTING STORM SEWER
EXISTING RIGHT-OF-WAY
EXISTING LOT LINE
PROPOSED EASEMENT LINE
EXISTING MANHOLE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
PROPOSED CURB AND GUTTER - OUTFALL
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED SLOPES
PROPOSED STORM SEWER
TRANSITION
PROPOSED STORM INLET
LEGEND:
FINISHED GRADE AT TOP OF WALL
FINISHED GRADE AT BOTTOM OF WALL
TOP OF GRATE ELEVATION
FLOW LINE ELEVATION
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY
COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN
APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION.
2.ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN
PLUS 5000 FEET (39.81 = 5039.81).
3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT
OR FINISHED GRADE FOR LANDSCAPE AREAS.
4.ADA PARKING STALLS HAVE A 2% MAXIMUM SLOPE IN ANY DIRECTION.
NOTES:
HIGH POINT ELEVATION
LOW POINT ELEVATION
EDGE OF CONCRETE
PROPOSED NATURAL HABITAT BUFFER ZONE (NHBZ)
PROPOSED WETLAND MITIGATION AREA
EXISTING EASEMENT LINE
EXISTING STORM INLET
PROPOSED MANHOLE
C2.1 C2.2
T
TSTMSTMSTMSTM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C3.1_Detailed Grading Plan.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
DETAILED GRADING PLAN
C2.1
SCALE: 1"=20'
0 10 20
EXISTING STORM SEWER
EXISTING RIGHT-OF-WAY
EXISTING LOT LINE
PROPOSED EASEMENT LINE
EXISTING MANHOLE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
PROPOSED CURB AND GUTTER - OUTFALL
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED SLOPES
PROPOSED STORM SEWER
TRANSITION
PROPOSED STORM INLET
LEGEND:
FINISHED GRADE AT TOP OF WALL
FINISHED GRADE AT BOTTOM OF WALL
TOP OF GRATE ELEVATION
FLOW LINE ELEVATION
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY
COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN
APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION.
2.ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN
PLUS 5000 FEET (39.81 = 5039.81).
3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT
OR FINISHED GRADE FOR LANDSCAPE AREAS.
4.ADA PARKING STALLS HAVE A 2% MAXIMUM SLOPE IN ANY DIRECTION.
NOTES:
HIGH POINT ELEVATION
LOW POINT ELEVATION
EDGE OF CONCRETE
PROPOSED NATURAL HABITAT BUFFER ZONE (NHBZ)
PROPOSED WETLAND MITIGATION AREA
EXISTING EASEMENT LINE
EXISTING STORM INLET
PROPOSED MANHOLE
MATCHLINE-SEE SHEET C2.2KEYMAP
MARS DRIVE
SKYWAY DRIVEC2.1 C2.2
STM-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C3.1_Detailed Grading Plan.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
DETAILED GRADING PLAN
C2.2
SCALE: 1"=20'
0 10 20
EXISTING STORM SEWER
EXISTING RIGHT-OF-WAY
EXISTING LOT LINE
PROPOSED EASEMENT LINE
EXISTING MANHOLE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
PROPOSED CURB AND GUTTER - OUTFALL
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED SLOPES
PROPOSED STORM SEWER
TRANSITION
PROPOSED STORM INLET
LEGEND:
FINISHED GRADE AT TOP OF WALL
FINISHED GRADE AT BOTTOM OF WALL
TOP OF GRATE ELEVATION
FLOW LINE ELEVATION
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY
COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN
APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION.
2.ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN
PLUS 5000 FEET (39.81 = 5039.81).
3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT
OR FINISHED GRADE FOR LANDSCAPE AREAS.
4.ADA PARKING STALLS HAVE A 2% MAXIMUM SLOPE IN ANY DIRECTION.
NOTES:
HIGH POINT ELEVATION
LOW POINT ELEVATION
EDGE OF CONCRETE
PROPOSED NATURAL HABITAT BUFFER ZONE (NHBZ)
PROPOSED WETLAND MITIGATION AREA
EXISTING EASEMENT LINE
EXISTING STORM INLET
PROPOSED MANHOLE
MATCHLINE-SEE SHEET C2.1KEYMAP
MARS DRIVE
SKYWAY DRIVEC2.1 C2.2
UEUEUEUEUEGGGGUTUTUTUTUTUTWSTMSTM STMSTMSTMSTMW W W W W W W W W W W W
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
WWW8''SS8''SS8''SS8''SSUEUEUEUEUEUE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UEUEUEUEUET
T
UEUEUEUEUEUEUEUEUEUE UE UE UE
UE UE UE UE UE UE UEUEUEUEUEUEUEUEUEE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C4.0_Utility Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
UTILITY PLAN
C3.0
W
SS
W
SS
S
SCALE: 1"=30'
0 15 30
WSTMSTM W W W W W W W8''SS 8''SS 8''SS 8''SS8''SSUEUEU
E
UE UE UE UE UE UE UE UE UE UEUEUET
T
UEUEUEUEUEUEUE UE
UE UE UE UE UEUEUEUEE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CX.0_Water P&P.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
WATER PLAN & PROFILE
C3.1
W
SS
W
SS
S
SCALE: 1"=50'
0 20 5010
WATER 10+00.00 15+22.17
50'5'
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
C3.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD4.1_Utility Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
UTILITY DETAILS
C3.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD4.1_Utility Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
UTILITY DETAILS
C3.3
WSTM SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
S
STM
UTUTUTUTUTUTUTUTUTUTG
G
G G
STMSTMSTMSTMSTMSTMSTMSTM
UT UT UT UT UT UT UT UT UT
UTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTSTMSTMUE UE UE
UEWWWWW8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSUEUEUEUEUEUEUEUEUETTUE UE UE UE UE UE
UEUEUEUEUEUEUEUEUE-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C5.0_Sanitary Sewer Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SANITARY 1 PLAN AND
PROFILE
C4.0
W
SS
W
SS
S
SCALE: 1"=50'
0 20 5010
SANITARY 1 20+00.00 27+83.05
50'5'
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
C4.0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD5.1_Sanitary Sewer Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SANITARY SEWER DETAILS
C4.1
UEUEUEUEGGGUTUTUTUTUTUTWSTMSTM W W W W W W W W W W W W
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
WWW8''SSUEUEUEUEUEUE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UEUEUEUEUET
T
UEUEUEUEUEUEUEUEUEUE UE UE UE
UE UE UE UE UE UE UEUEUEUEUEUEUEUEUEE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C4.0_Overall Roof Storm.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
ROOF STORM DRAIN PLAN
AND PROFILE
C5.0
W
SS
W
SS
S
SCALE: 1"=30'
0 15 30
STORM B 70+00.00 71+18.77
50'5'
STMW W W W W
8''SS
UE UE UE UE UE UE UE UE UEUEUET
UE UE UE UEUEE
WSTMSTM W W W
8''SS 8''SS 8''SS 8''SS8''SSUEUEU
E
UE UET
UEUEUEUEUEUEUE UE
UE UE UEUEUEUE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C6.0_Storm P&P.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
STORM A AND OVERFLOW
PLAN & PROFILE
C5.1
W
SS
W
SS
S
SCALE: 1"=50'
0 20 5010
STORM A 10+00.00 13+99.35
50'5'
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
C5.1
OVERFLOW 10+00.00 11+71.26
50'5'
WSTMSTM W
8''SS 8''SS 8''SS8''SSUEUEU
E
UET
UEUEUEUEUEUEUE UE
UEUEUE WSTMSTM W W W
8''SS 8''SS 8''SS 8''SS
UEUEU
E
UE UE UET
UEUEUEUEUEUEUE UE
UE UE UEUEUEUE WSTMSTM W W W
8''SS 8''SS 8''SS 8''SS
UEUEU
E
UE UE UE UET
T
UEUEUEUEUEUEUE UE
UE UE UE UEUEUEUE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C6.1_Storm P&P.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
STORM B,C, & D PLAN AND
PROFILE
C5.2
W
SS
W
SS
S
SCALE: 1"=50'
0 20 5010
STORM B 70+00.00 70+09.56
50'5'
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
STORM C 10+00.00 11+22.61
50'5'
STORM D 10+00.00 12+09.79
50'5'
STM B
STM C&D
WSTMSTM W W W
8''SS 8''SS 8''SS 8''SS8''SSUEUEU
E
UE UE UE UET
T
UEUEUEUEUEUEUE UE
UE UE UE UEUEUEUE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C6.2_Storm P&P.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
UNDERDRAIN PLAN AND
PROFILE
C5.3
W
SS
W
SS
S
SCALE: 1"=50'
0 20 5010
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
UNDERDRAIN 10+00.00 11+83.96
50'5'
C5.3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD6.1_Storm Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
1 TYPE 13 INLET
COMBINATION INLET2
STORM DETAILS
C5.4
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD6.1_Storm Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
RIRRAP INSTALLATION AT FES4
ROUND AREA INLET W/ STANDARD GRATE3
STORM DETAILS
C5.5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD6.1_Storm Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
ADS STORMTECH DETAILS
C5.6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD6.1_Storm Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
ADS STORMTECH DETAILS
C5.7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_CD6.1_Storm Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
ADS STORMTECH DETAILS
C5.8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C7.0_Road Plan and Profile.dwg - Matthew Kasch - 6/21/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SCALE: 1"=50'
0 20 5010
MARS DRIVE PLAN AND
PROFILE
C7.0
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING LOTLINE
EXISTING EASEMENT LINE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK BEFORE COMMENCING
NEW CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR
ADDITIONAL RIGHT-OF-WAY, EASEMENT AND ROADWAY CENTERLINE INFORMATION.
3. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINTS. CONTRACTOR SHALL
CONFIRM ALL BUILDING CORNERS AND DIMENSIONS WITH ARCHITECT PRIOR TO CALLING FOR STAKES.
4.ALL DIMENSIONS REFERENCE FLOWLINE, BUILDING OR PROPERTY LINE UNLESS SPECIFIED
OTHERWISE.
5.CONTRACTOR TO COORDINATE WITH CIVIL ENGINEER AND ARCHITECT PRIOR TO STAKING BUILDING
COORDINATES.
6.FOR ALL CATCH AND SPILL CURB INFORMATION AND TRANSITIONS, SEE GRADING PLANS C2.1-C2.2.
7.ALL STRIPING AND PAVEMENT MARKINGS SHALL COMPLY WITH THE MUTCD AND SECTION 627 OF THE
CDOT SPECIFICATIONS FOR SKYWAY DRIVE AND SOUTH COLLEGE AVENUE INTERSECTION
IMPROVEMENTS.
8.ALL STRIPING AND PAVEMENT MARKING FOR SKYWAY DRIVE AND MARS DRIVE SHALL COMPLY WITH
THE CITY OF FORT COLLINS STREET DESIGN AND CONSTRUCTION STANDARDS.
8.ALL TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD WITH REGARD
TO SIGN TYPE, SIZE, LOCATION AND MOUNTING SPECIFICATIONS.
9.ALL ON-SITE CURB AND GUTTER SHALL BE 18" CATCH OR SPILL CURB AND GUTTER UNLESS NOTED
10.ALL H/C RAMPS SHALL HAVE TRUNCATED DOMES PER SITE PLAN DETAILS SHEET.
11.REFER TO DETAIL SHEET -- FOR H/C PARKING STALL DETAILS AND SIGN REQUIREMENTS - ALL SPACES
ARE VAN ACCESSIBLE AND SHOULD BE POSTED AS SUCH. PROVIDE 2.5' CLEAR FROM FLOWLINE TO
POST.
12.THERE SHALL BE A 3' MINIMUM TRANSITION FROM SPILL TO CATCH CURB AND GUTTER.
13.ALL SIGNS TO BE H.I.P.
14.FOR PAVEMENT DESIGN, PAVEMENT SECTIONS, AND SUBGRADE PREPARATION, REFER TO
PRELIMINARY SUBSURFACE EXPLORATION REPORT DATED JULY 17, 2019 BY EARTH ENGINEERING
CONSULTANTS. CONTRACTOR TO VERIFY FINAL PAVEMENT AND SUBGRADE DESIGN WITH
GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION.
15.ALL PROPOSED EASEMENTS ARE TO BE RECORDED BY SEPARATE DOCUMENT.
PROPOSED CURB AND GUTTER - SPILL
PROPOSED CONCRETE CROSSPAN
TRANSITION
PROPOSED FENCE
PROPOSED SIDEWALK
PROPOSED EASEMENT LINE
KEYMAP
MARS DRIVE
SKYWAY DRIVE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C7.1_Section View.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
MARS DRIVE CROSS
SECTIONS
C7.1
8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSSS SS
SSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS
STMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTOHEGGGGGGGSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
UT
UT
UT
UT
UT
UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT
STM STM STM
UEUEUEUEUEUEUEUE8''SS8''SS8''SS8''SS-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C7.1_287 Sidewalk Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
SCALE: 1"=30'
0 15 30
COLLEGE AVENUE
SIDEWALK PLAN
C7.2
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING LOTLINE
EXISTING EASEMENT LINE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK BEFORE COMMENCING
NEW CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR
ADDITIONAL RIGHT-OF-WAY, EASEMENT AND ROADWAY CENTERLINE INFORMATION.
3. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINTS. CONTRACTOR SHALL
CONFIRM ALL BUILDING CORNERS AND DIMENSIONS WITH ARCHITECT PRIOR TO CALLING FOR STAKES.
4.ALL DIMENSIONS REFERENCE FLOWLINE, BUILDING OR PROPERTY LINE UNLESS SPECIFIED
OTHERWISE.
5.CONTRACTOR TO COORDINATE WITH CIVIL ENGINEER AND ARCHITECT PRIOR TO STAKING BUILDING
COORDINATES.
6.FOR ALL CATCH AND SPILL CURB INFORMATION AND TRANSITIONS, SEE GRADING PLANS C2.1-C2.2.
7.ALL STRIPING AND PAVEMENT MARKINGS SHALL COMPLY WITH THE MUTCD AND SECTION 627 OF THE
CDOT SPECIFICATIONS FOR SKYWAY DRIVE AND SOUTH COLLEGE AVENUE INTERSECTION
IMPROVEMENTS.
8.ALL STRIPING AND PAVEMENT MARKING FOR SKYWAY DRIVE AND MARS DRIVE SHALL COMPLY WITH
THE CITY OF FORT COLLINS STREET DESIGN AND CONSTRUCTION STANDARDS.
8.ALL TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD WITH REGARD
TO SIGN TYPE, SIZE, LOCATION AND MOUNTING SPECIFICATIONS.
9.ALL ON-SITE CURB AND GUTTER SHALL BE 18" CATCH OR SPILL CURB AND GUTTER UNLESS NOTED
10.ALL H/C RAMPS SHALL HAVE TRUNCATED DOMES PER SITE PLAN DETAILS SHEET.
11.REFER TO DETAIL SHEET -- FOR H/C PARKING STALL DETAILS AND SIGN REQUIREMENTS - ALL SPACES
ARE VAN ACCESSIBLE AND SHOULD BE POSTED AS SUCH. PROVIDE 2.5' CLEAR FROM FLOWLINE TO
POST.
12.THERE SHALL BE A 3' MINIMUM TRANSITION FROM SPILL TO CATCH CURB AND GUTTER.
13.ALL SIGNS TO BE H.I.P.
14.FOR PAVEMENT DESIGN, PAVEMENT SECTIONS, AND SUBGRADE PREPARATION, REFER TO
PRELIMINARY SUBSURFACE EXPLORATION REPORT DATED JULY 17, 2019 BY EARTH ENGINEERING
CONSULTANTS. CONTRACTOR TO VERIFY FINAL PAVEMENT AND SUBGRADE DESIGN WITH
GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION.
15.ALL PROPOSED EASEMENTS ARE TO BE RECORDED BY SEPARATE DOCUMENT.
PROPOSED CURB AND GUTTER - SPILL
PROPOSED CONCRETE CROSSPAN
TRANSITION
PROPOSED FENCE
PROPOSED SIDEWALK
PROPOSED EASEMENT LINE
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
COLLEGE AVENUE NOTE:
1. THESE COLLEGE AVENUE IMPROVEMENTS ARE CONCEPTUAL IN NATURE AND NOT FOR
CONSTRUCTION. SEE DEVELOPMENT AGREEMENT FOR ADDITIONAL INFORMATION AND
RESPONSIBILITIES.
UEUEUEUEUEUEUEUEUEUEUE UE UE UE
UEUEUEUEUEUEUEUEE
E
F F
C
C
G
1
2
2 2
2
2
1
1
G
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C7.2_Striping Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
SCALE: 1"=30'
0 15 30
SIGNAGE AND STRIPING
PLAN
C7.3
LEGEND:
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE
WORK BEFORE COMMENCING NEW CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY, EASEMENT
AND ROADWAY CENTERLINE INFORMATION.
3. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINTS. CONTRACTOR SHALL CONFIRM ALL BUILDING CORNERS AND
DIMENSIONS WITH ARCHITECT PRIOR TO CALLING FOR STAKES.
4.ALL DIMENSIONS REFERENCE FLOWLINE, BUILDING OR PROPERTY LINE UNLESS SPECIFIED OTHERWISE.
5.CONTRACTOR TO COORDINATE WITH CIVIL ENGINEER AND ARCHITECT PRIOR TO STAKING BUILDING COORDINATES.
6.FOR ALL CATCH AND SPILL CURB INFORMATION AND TRANSITIONS, SEE GRADING PLANS C2.1-C2.2.
7.ALL STRIPING AND PAVEMENT MARKINGS SHALL COMPLY WITH THE MUTCD AND SECTION 627 OF THE CDOT SPECIFICATIONS FOR SKYWAY
DRIVE AND SOUTH COLLEGE AVENUE INTERSECTION IMPROVEMENTS.
8.ALL STRIPING AND PAVEMENT MARKING FOR SKYWAY DRIVE AND MARS DRIVE SHALL COMPLY WITH THE CITY OF FORT COLLINS STREET
DESIGN AND CONSTRUCTION STANDARDS.
9.ALL TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD WITH REGARD TO SIGN TYPE, SIZE, LOCATION AND
MOUNTING SPECIFICATIONS.
10.ALL ON-SITE CURB AND GUTTER SHALL BE 18" CATCH OR SPILL CURB AND GUTTER UNLESS NOTED
11.ALL H/C RAMPS SHALL HAVE TRUNCATED DOMES PER SITE PLAN DETAILS SHEET.
12.REFER TO DETAIL SHEET -- FOR H/C PARKING STALL DETAILS AND SIGN REQUIREMENTS - ALL SPACES ARE VAN ACCESSIBLE AND SHOULD
BE POSTED AS SUCH. PROVIDE 2.5' CLEAR FROM FLOWLINE TO POST.
13.THERE SHALL BE A 3' MINIMUM TRANSITION FROM SPILL TO CATCH CURB AND GUTTER.
14.ALL SIGNS TO BE HIGH INTENSITY PRISMATIC GRADE SHEETING..
15.FOR PAVEMENT DESIGN, PAVEMENT SECTIONS, AND SUBGRADE PREPARATION, REFER TO PRELIMINARY SUBSURFACE EXPLORATION
REPORT DATED JULY 17, 2019 BY EARTH ENGINEERING CONSULTANTS. CONTRACTOR TO VERIFY FINAL PAVEMENT AND SUBGRADE DESIGN
WITH GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION.
16.ALL PROPOSED EASEMENTS ARE TO BE RECORDED BY SEPARATE DOCUMENT.
17.SPACING REQUIREMENTS FROM SKYWAY TO DRIVEWAY ALONG MARS HAS BEEN ACCEPTED.
18.THE CITY RESERVES THE RIGHT TO RESTRICT THE NORTH SITE ACCESS TO RIRO IN THE FUTURE, IF CONDITIONS WARRANT.
PROPOSED CONCRETE CROSSPAN
PROPOSED FENCE
PROPOSED SIDEWALK
1
2
R1-1 STOP SIGN
TYPE 3 BARRICADE
A
B
PREFORMED PLASTIC PAVEMENT MARKING
STRAIGHT/LEFT TURN ARROW (15.5 S.F. EA.)
PREFORMED PLASTIC PAVEMENT MARKING
RIGHT TURN ARROWS (15.5 S.F. EA.)
D6" WHITE SOLID LINE
E
DOUBLE YELLOW LINE
4" SOLID, 8" O.C.
R7-1
NO PARKING ANYTIME
WITH DIRECTIONAL ARROW CPREFORMED PLASTIC PAVEMENT
MARKING BICYCLIST AND ARROW
F
BUFFERED BIKE LANE - DIAGONAL HASH 6"
WHITE SOLID LINE AT 45° TO LANE 40' O.C.G
6" WHITE BROKEN LINE
PREFORMED PLASTIC PAVEMENT MARKING
18" WIDE STOP BAR
H
PREFORMED PLASTIC PAVEMENT MARKING
SHARED BIKE/VEHICLE LANE MARKING I
EXISTING RIGHT-OF-WAY
PROPOSED EASEMENT LINE
EXISTING EASEMENT LINE
EXISTING LOT LINE
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
MARS DRIVE
SIGNAGE AND STRIPING
A
--
SCALE: 1"=20'
0 10 20
SKYWAY DRIVE AT S COLLEGE AVENUE
SIGNAGE AND STRIPING
B
--
A
B
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
T
TUEUE
UEUEUEGGGGUTUTUTUTUTUTSTMSTMSTMSTMSTMSTMSF SF SF SF SF SF SF SF SF SF SF SF SF SFSF
SFSFCWA
SSA
SF
SF
SF SF
SF
VTC
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.0_Erosion Control Plan_Initial.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
INITIAL EROSION CONTROL
PLAN
C8.0
SCALE: 1"=30'
0 15 30
LEGEND:
1.THIS EROSION CONTROL PLAN AND ASSOCIATED SWMP ARE LIVING DOCUMENTS REQUIRING PERIODIC
REVIEW AND UPDATING AS SITE CONDITIONS CHANGE OR AS REQUIRED BY LOCAL AUTHORITIES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE ONGOING COMPLIANCE WITH THE REQUIREMENTS OF THE
STORMWATER DISCHARGE PERMIT.
2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
3.EROSION CONTROL PRACTICES, SITE PROTECTION AND REVEGETATION METHODS SHALL FOLLOW CITY
OF FORT COLLINS REGULATIONS.
4.DURING CONSTRUCTION PHASING, INSTALL EROSION CONTROL MEASURES FOLLOWING BMPS WITH EACH
PHASE, AS REQUIRED.
5.PERIMETER PROTECTION (I.E., STRAW WATTLES) IS SHOWN AROUND EACH BLOCK THAT IS A PART OF THE
PROPOSED IMPROVEMENTS. REFER TO THE LEGEND (SEE RIGHT). THIS PERIMETER PROTECTION SHALL
BE INSTALLED WHEN CURB, GUTTER AND SIDEWALK INSTALLATION IS COMPLETED IN THE ADJOINING
RIGHT-OF-WAY. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING PERIMETER PROTECTION (i.e.,
STRAW WATTLES) DAMAGED BY CONSTRUCTION TRAFFIC (e.g., TRUCKS DRIVING OVER STRAW WATTLES
AND FLATTENING THEM).
6.FOLLOWING OVERLOT GRADING OR ANY OTHER LAND DISTURBING ACTIVITY, ALL OTHER AREAS OF THE
SITE TO BE DEVELOPED DURING LATER PHASES OF CONSTRUCTION AND WHICH SHALL REMAIN EXPOSED
FOR MORE THAN THIRTY-(30) DAYS WILL REQUIRE TEMPORARY OR PERMANENT EROSION CONTROL (I.E.,
SEED/MULCH, LANDSCAPING, ETC.).
7.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION
FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE
STABILIZATION METHODS.
8.SEE EROSION CONTROL NOTES ON THIS SHEET AND GRADING & EROSION CONTROL NOTES ON SHEET
CV02, AS WELL AS DETAILS ON SHEETS C8.4-C8.5.
9.FINAL STABILIZATION WILL BE DONE IN ACCORDANCE WITH LANDSCAPE PLAN.
10.CONTRACTOR SHALL CLEAN AND REMOVE ANY TRACKED SEDIMENT OR DEBRIS FROM R.O.W. OR
ADJACENT IMMEDIATELY IF ANY TRACKING OCCURS.
11.UNDERGROUND TREATMENT FACILITY WILL BE BUILT LAST IN THE CONSTRUCTION SEQUENCE IN ORDER
TO MINIMIZE POTENTIAL FOR SEDIMENTATION OF THE CHAMBERS.
VEHICLE TRACKING CONTROL PAD
SILT FENCE
INLET PROTECTION
CONCRETE WASHOUT AREA
NOTE:
ALL BMP'S SHOWN ARE GRAPHICAL IN NATURE. FINAL SIZE AND LOCATION SHALL BE
DETERMINED BY THE CONTRACTOR.
ROCK SOCK
SF
IP
CWA
VTC
RS
GENERAL NOTES:
TEMPORARY BMPs
SF SF
EXISTING STORM SEWER
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED STORM SEWER
STABILIZED STAGING AREA SSA
ROCK CHECK DAM RCD
PROPOSED NATURAL HABITAT
BUFFER ZONE (NHBZ)
PROPOSED WETLAND
MITIGATION AREA
EXISTING MANHOLE
PROPOSED STORM INLET
EXISTING STORM INLET
PROPOSED MANHOLE
EROSION CONTROL BLANKET ECB
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
STMSS SS
SSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS
STMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTOHEGGGGGGGSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
UT
UT
UT
UT
UT
UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT
STM STM STM
UEUEUEUEUEUEUEUESF SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF SF SF SF SF
SF SF SF SF
RCD
SF
SF
SF
SF
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.0_Erosion Control Plan_Initial.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
INITIAL OFFSITE EROSION
CONTROL PLAN
C8.1
SCALE: 1"=30'
0 15 30
LEGEND:
1.THIS EROSION CONTROL PLAN AND ASSOCIATED SWMP ARE LIVING DOCUMENTS REQUIRING PERIODIC
REVIEW AND UPDATING AS SITE CONDITIONS CHANGE OR AS REQUIRED BY LOCAL AUTHORITIES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE ONGOING COMPLIANCE WITH THE REQUIREMENTS OF THE
STORMWATER DISCHARGE PERMIT.
2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
3.EROSION CONTROL PRACTICES, SITE PROTECTION AND REVEGETATION METHODS SHALL FOLLOW CITY
OF FORT COLLINS REGULATIONS.
4.DURING CONSTRUCTION PHASING, INSTALL EROSION CONTROL MEASURES FOLLOWING BMPS WITH EACH
PHASE, AS REQUIRED.
5.PERIMETER PROTECTION (I.E., STRAW WATTLES) IS SHOWN AROUND EACH BLOCK THAT IS A PART OF THE
PROPOSED IMPROVEMENTS. REFER TO THE LEGEND (SEE RIGHT). THIS PERIMETER PROTECTION SHALL
BE INSTALLED WHEN CURB, GUTTER AND SIDEWALK INSTALLATION IS COMPLETED IN THE ADJOINING
RIGHT-OF-WAY. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING PERIMETER PROTECTION (i.e.,
STRAW WATTLES) DAMAGED BY CONSTRUCTION TRAFFIC (e.g., TRUCKS DRIVING OVER STRAW WATTLES
AND FLATTENING THEM).
6.FOLLOWING OVERLOT GRADING OR ANY OTHER LAND DISTURBING ACTIVITY, ALL OTHER AREAS OF THE
SITE TO BE DEVELOPED DURING LATER PHASES OF CONSTRUCTION AND WHICH SHALL REMAIN EXPOSED
FOR MORE THAN THIRTY-(30) DAYS WILL REQUIRE TEMPORARY OR PERMANENT EROSION CONTROL (I.E.,
SEED/MULCH, LANDSCAPING, ETC.).
7.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION
FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE
STABILIZATION METHODS.
8.SEE EROSION CONTROL NOTES ON THIS SHEET AND GRADING & EROSION CONTROL NOTES ON SHEET
CV02, AS WELL AS DETAILS ON SHEETS C8.4-C8.5.
9.FINAL STABILIZATION WILL BE DONE IN ACCORDANCE WITH LANDSCAPE PLAN.
10.CONTRACTOR SHALL CLEAN AND REMOVE ANY TRACKED SEDIMENT OR DEBRIS FROM R.O.W. OR
ADJACENT IMMEDIATELY IF ANY TRACKING OCCURS.
11.UNDERGROUND TREATMENT FACILITY WILL BE BUILT LAST IN THE CONSTRUCTION SEQUENCE IN ORDER
TO MINIMIZE POTENTIAL FOR SEDIMENTATION OF THE CHAMBERS.
VEHICLE TRACKING CONTROL PAD
SILT FENCE
INLET PROTECTION
CONCRETE WASHOUT AREA
NOTE:
ALL BMP'S SHOWN ARE GRAPHICAL IN NATURE. FINAL SIZE AND LOCATION SHALL BE
DETERMINED BY THE CONTRACTOR.
ROCK SOCK
SF
IP
CWA
VTC
RS
GENERAL NOTES:
TEMPORARY BMPs
SF SF
EXISTING STORM SEWER
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED STORM SEWER
STABILIZED STAGING AREA SSA
ROCK CHECK DAM RCD
PROPOSED NATURAL HABITAT
BUFFER ZONE (NHBZ)
PROPOSED WETLAND
MITIGATION AREA
EXISTING MANHOLE
PROPOSED STORM INLET
EXISTING STORM INLET
PROPOSED MANHOLE
EROSION CONTROL BLANKET ECB
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
T
TUEUE
UEUEUEGGGGUTUTUTUTUTUTSTMSTMSTMSTMSTMSTMSF SF SF SF SF SF SF SF SF SF SF SF SF SFSF
SFSFRS
RS
RS
CWA
SSA
RCD
RCD
RCD
SF
SF
SF
SF SF
SF
RS
RS
RS
VTC IP
IP
IP
IP
IP IP
IP
IP
ECB
ECB
ECB
ECB
ECB
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.0_Erosion Control Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
FINAL EROSION CONTROL
PLAN
C8.2
SCALE: 1"=30'
0 15 30
LEGEND:
1.THIS EROSION CONTROL PLAN AND ASSOCIATED SWMP ARE LIVING DOCUMENTS REQUIRING PERIODIC
REVIEW AND UPDATING AS SITE CONDITIONS CHANGE OR AS REQUIRED BY LOCAL AUTHORITIES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE ONGOING COMPLIANCE WITH THE REQUIREMENTS OF THE
STORMWATER DISCHARGE PERMIT.
2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
3.EROSION CONTROL PRACTICES, SITE PROTECTION AND REVEGETATION METHODS SHALL FOLLOW CITY
OF FORT COLLINS REGULATIONS.
4.DURING CONSTRUCTION PHASING, INSTALL EROSION CONTROL MEASURES FOLLOWING BMPS WITH EACH
PHASE, AS REQUIRED.
5.PERIMETER PROTECTION (I.E., STRAW WATTLES) IS SHOWN AROUND EACH BLOCK THAT IS A PART OF THE
PROPOSED IMPROVEMENTS. REFER TO THE LEGEND (SEE RIGHT). THIS PERIMETER PROTECTION SHALL
BE INSTALLED WHEN CURB, GUTTER AND SIDEWALK INSTALLATION IS COMPLETED IN THE ADJOINING
RIGHT-OF-WAY. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING PERIMETER PROTECTION (i.e.,
STRAW WATTLES) DAMAGED BY CONSTRUCTION TRAFFIC (e.g., TRUCKS DRIVING OVER STRAW WATTLES
AND FLATTENING THEM).
6.FOLLOWING OVERLOT GRADING OR ANY OTHER LAND DISTURBING ACTIVITY, ALL OTHER AREAS OF THE
SITE TO BE DEVELOPED DURING LATER PHASES OF CONSTRUCTION AND WHICH SHALL REMAIN EXPOSED
FOR MORE THAN THIRTY-(30) DAYS WILL REQUIRE TEMPORARY OR PERMANENT EROSION CONTROL (I.E.,
SEED/MULCH, LANDSCAPING, ETC.).
7.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION
FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE
STABILIZATION METHODS.
8.SEE EROSION CONTROL NOTES ON THIS SHEET AND GRADING & EROSION CONTROL NOTES ON SHEET
CV02, AS WELL AS DETAILS ON SHEETS C8.4-C8.5.
9.FINAL STABILIZATION WILL BE DONE IN ACCORDANCE WITH LANDSCAPE PLAN.
10.CONTRACTOR SHALL CLEAN AND REMOVE ANY TRACKED SEDIMENT OR DEBRIS FROM R.O.W. OR
ADJACENT IMMEDIATELY IF ANY TRACKING OCCURS.
11.UNDERGROUND TREATMENT FACILITY WILL BE BUILT LAST IN THE CONSTRUCTION SEQUENCE IN ORDER
TO MINIMIZE POTENTIAL FOR SEDIMENTATION OF THE CHAMBERS.
VEHICLE TRACKING CONTROL PAD
SILT FENCE
INLET PROTECTION
CONCRETE WASHOUT AREA
NOTE:
ALL BMP'S SHOWN ARE GRAPHICAL IN NATURE. FINAL SIZE AND LOCATION SHALL BE
DETERMINED BY THE CONTRACTOR.
ROCK SOCK
SF
IP
CWA
VTC
RS
GENERAL NOTES:
TEMPORARY BMPs
SF SF
EXISTING STORM SEWER
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED STORM SEWER
STABILIZED STAGING AREA SSA
ROCK CHECK DAM RCD
PROPOSED NATURAL HABITAT
BUFFER ZONE (NHBZ)
PROPOSED WETLAND
MITIGATION AREA
EXISTING MANHOLE
PROPOSED STORM INLET
EXISTING STORM INLET
PROPOSED MANHOLE
EROSION CONTROL BLANKET ECB
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
STMSS SS
SSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSS SS SS SS
STMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTOHEGGGGGGGSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
UT
UT
UT
UT
UT
UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT
STM STM STM
UEUEUEUEUEUEUEUESF SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF SF SF SF SF
SF SF SF SF
RCD
SF
SF
SF
SF
ECB ECB
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.0_Erosion Control Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
FINAL OFFSITE EROSION
CONTROL PLAN
C8.3
SCALE: 1"=30'
0 15 30
LEGEND:
1.THIS EROSION CONTROL PLAN AND ASSOCIATED SWMP ARE LIVING DOCUMENTS REQUIRING PERIODIC
REVIEW AND UPDATING AS SITE CONDITIONS CHANGE OR AS REQUIRED BY LOCAL AUTHORITIES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE ONGOING COMPLIANCE WITH THE REQUIREMENTS OF THE
STORMWATER DISCHARGE PERMIT.
2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND
UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.
3.EROSION CONTROL PRACTICES, SITE PROTECTION AND REVEGETATION METHODS SHALL FOLLOW CITY
OF FORT COLLINS REGULATIONS.
4.DURING CONSTRUCTION PHASING, INSTALL EROSION CONTROL MEASURES FOLLOWING BMPS WITH EACH
PHASE, AS REQUIRED.
5.PERIMETER PROTECTION (I.E., STRAW WATTLES) IS SHOWN AROUND EACH BLOCK THAT IS A PART OF THE
PROPOSED IMPROVEMENTS. REFER TO THE LEGEND (SEE RIGHT). THIS PERIMETER PROTECTION SHALL
BE INSTALLED WHEN CURB, GUTTER AND SIDEWALK INSTALLATION IS COMPLETED IN THE ADJOINING
RIGHT-OF-WAY. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING PERIMETER PROTECTION (i.e.,
STRAW WATTLES) DAMAGED BY CONSTRUCTION TRAFFIC (e.g., TRUCKS DRIVING OVER STRAW WATTLES
AND FLATTENING THEM).
6.FOLLOWING OVERLOT GRADING OR ANY OTHER LAND DISTURBING ACTIVITY, ALL OTHER AREAS OF THE
SITE TO BE DEVELOPED DURING LATER PHASES OF CONSTRUCTION AND WHICH SHALL REMAIN EXPOSED
FOR MORE THAN THIRTY-(30) DAYS WILL REQUIRE TEMPORARY OR PERMANENT EROSION CONTROL (I.E.,
SEED/MULCH, LANDSCAPING, ETC.).
7.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION
FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE
STABILIZATION METHODS.
8.SEE EROSION CONTROL NOTES ON THIS SHEET AND GRADING & EROSION CONTROL NOTES ON SHEET
CV02, AS WELL AS DETAILS ON SHEETS C8.4-C8.5.
9.FINAL STABILIZATION WILL BE DONE IN ACCORDANCE WITH LANDSCAPE PLAN.
10.CONTRACTOR SHALL CLEAN AND REMOVE ANY TRACKED SEDIMENT OR DEBRIS FROM R.O.W. OR
ADJACENT IMMEDIATELY IF ANY TRACKING OCCURS.
11.UNDERGROUND TREATMENT FACILITY WILL BE BUILT LAST IN THE CONSTRUCTION SEQUENCE IN ORDER
TO MINIMIZE POTENTIAL FOR SEDIMENTATION OF THE CHAMBERS.
VEHICLE TRACKING CONTROL PAD
SILT FENCE
INLET PROTECTION
CONCRETE WASHOUT AREA
NOTE:
ALL BMP'S SHOWN ARE GRAPHICAL IN NATURE. FINAL SIZE AND LOCATION SHALL BE
DETERMINED BY THE CONTRACTOR.
ROCK SOCK
SF
IP
CWA
VTC
RS
GENERAL NOTES:
TEMPORARY BMPs
SF SF
EXISTING STORM SEWER
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED STORM SEWER
STABILIZED STAGING AREA SSA
ROCK CHECK DAM RCD
PROPOSED NATURAL HABITAT
BUFFER ZONE (NHBZ)
PROPOSED WETLAND
MITIGATION AREA
EXISTING MANHOLE
PROPOSED STORM INLET
EXISTING STORM INLET
PROPOSED MANHOLE
EROSION CONTROL BLANKET ECB
KEYMAP
US HWY 287MARS DRIVESKYWAY DRIVE
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.2_Erosion Control Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
EROSION CONTROL
DETAILS
C8.4
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.2_Erosion Control Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
EROSION CONTROL
DETAILS
C8.5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C8.2_Erosion Control Details.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
06.21.2023
EROSION CONTROL
DETAILS
C8.6
T
T
WSTMSTM
A1
A3
A4 A5 A6
A7
A8.1
A9.1
B1
B2
B3
acres
A1
0.78
0.98 0.09
acres
A2
0.79
0.99 0.38
acres
A3
0.24
0.30 0.61
acres
A4
0.80
1.00 0.24
acres
A5
0.87
1.00 0.48
acres
A6
0.64
0.80 0.85
acres
A7
0.84
1.00 0.18
acres
A8.3
0.95
1.00 0.03
acres
A9.1
0.95
1.00 0.02
acres
B1
0.39
0.48 0.12
acres
B2
0.33
0.41 0.22
acres
OS1
0.25
0.31 1.55
acres
B3
0.62
0.78 0.01
A2
A9.2 A9.3
A9.6A9.5A9.4
A8.2
A8.3
A8.4 A8.5 A8.6
A8.7
A8.8 A8.9
A8.10
A8.11
acres
A8.4
0.95
1.00 0.05
acres
A8.5
0.95
1.00 0.06
acres
A8.6
0.95
1.00 0.03
acres
A8.2
0.95
1.00 0.01
acres
A8.11
0.95
1.00 0.03acres
A8.10
0.95
1.00 0.03
acres
A8.9
0.95
1.00 0.07
acres
A8.8
0.95
1.00 0.03
acres
A8.7
0.95
1.00 0.01
acres
A8.1
0.95
1.00 0.00
A9.7 A9.8 A9.9 A9.10 A9.11 A9.12
acres
A9.2
0.95
1.00 0.04
acres
A9.3
0.95
1.00 0.03
acres
A9.4
0.95
1.00 0.03 acres
A9.5
0.95
1.00 0.03 acres
A9.6
0.95
1.00 0.03
acres
A9.7
0.95
1.00 0.03
acres
A9.8
0.95
1.00 0.03
acres
A9.9
0.95
1.00 0.01 acres
A9.10
0.95
1.00 0.02
acres
A9.11
0.95
1.00 0.04 acres
A9.12
0.95
1.00 0.04
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
Date:
Drawn By:
Project No:
Checked By:H:\G\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C9.0_Drainage Plan.dwg - Jared Licht - 6/16/2023Init.#Issue / DescriptionDateMARS LANDINGFINAL DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONGNK000008
JEP
DBC
CAUTION - NOTICE TO CONTRACTOR
1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND
FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO
BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD
LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER
SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO
CONSTRUCTION.
2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY,
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY, EITHER THROUGH POTHOLING OR
ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS,
TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR
INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK
FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING
AGENCY.
4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY
MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED
SURVEYOR REPLACE ANY DAMAGED OR DISTURBED
MONUMENTATION AT THEIR COST.
Know what's
before you dig.
06.21.2023
DRAINAGE PLAN
C9.0
SCALE: 1"=30'
0 15 30
DESIGN POINT
MAJOR BASIN BOUNDARY (i.e., C-STORE)
SUB-BASIN BOUNDARY (i.e., RATIONAL METHOD)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
MINOR (2YEAR) RUNOFF
COEFFICIENT
MAJOR (100YEAR) RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.23
0.45
1.00
A1
EXISTING STORM SEWER
EXISTING RIGHT-OF-WAY
EXISTING LOT LINE
PROPOSED EASEMENT LINE
EXISTING MANHOLE
PROPOSED CURB AND GUTTER
EXISTING CURB AND GUTTER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED STORM SEWER
PROPOSED STORM INLET
LEGEND:
EXISTING EASEMENT LINE
EXISTING STORM INLET
PROPOSED MANHOLE