Loading...
HomeMy WebLinkAboutHAMLET CONDOMINIUMS AT MIRAMONT PUD - FINAL - 54-87AF - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSr Utility vices Stormwater October 4, 1995 Mr. Ted Shepard, CPES 281 N. College Ave. Fort Collins,,CO 80522 Re: The Hamlet at Miramont P.U.D. Dear Ted, This letter is to document the need to finalize the design of the detention facility to be located at the Northwest corner of Boardwalk and Lemay. This request may have an effect on the P&Z hearing date for the Hamlet at Miramont development project. During conceptual and preliminary comments to the developer on this project the Stormwater Utility had indicated that the detention facility at the comer of Lemay and Boardwalk serving this site had to be designed at time of final submittal for this project. The design of this pond is to be done in accordance with the regional (SWIM) drainage model developed for this region in the report titled Oak -Cottonwood Farm Overall Drainage Plan. This report was prepared by RBD and submitted to the City in its current form in October 1994. In that report the modeling methodology that was used consisted of restricting release rates to the actual capacity of the outlet pipes creating in effect fictitious storage at the upstream end of the pipes. At that time this approximating method of modeling drainage from the Miramont development area was considered adequate and it was recognized by the City Stormwater Utility and the design engineers from RBD that further refinement would be necessitated as the Miramont development area builds out. Other refinements to the model include adding back some truncated conveyance elements to the regional drainage model. Since this detention pond is in effect the most critical piece left in the Oak -Cottonwood Farm Overall Drainage Plan, this is our last chance to properly address these regional drainage issues. Now is the time to better model the Oak -Cottonwood area in a manner that would reflect more closely what is actually present in the field I believe that these issues were only verbally communicated between Stormwater Utility staff, and Mr. Kevin Gingery, senior project engineer at RBD. This letter is intended to formalize this request, and to inform affected property owners, such as the developers of the Hamlet at Mfiramont of the issue. We believe that failing to address these concerns could potentially delay the date of their scheduled final P&Z hearing on this project now slated for October 20 since the Stormwater Utility's position is that this issue should be resolved and finalized prior to final P&Z approval for the Hamlet at Iiramont. 235 Mathews Street • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6589 • FAX (970) 221-6239 11 The City of Fort Collins Stormwater Utility would welcome the opportunity of meeting with the developer and/or his engineer in order to discuss and set-up a plan of action that would appropriately address our concerns. Sincerely, sail Hamdan City of Fort Collins Stormwater Utility xc: Kem Homes Nk Kevin Gingery, RBD Ms. Susan Hayes, Stormwater Utility File C-