HomeMy WebLinkAboutHAMLET CONDOMINIUMS AT MIRAMONT PUD - PRELIMINARY - 54-87AE - CORRESPONDENCE - STAFF'S PROJECT COMMENTSComm
Current
City of Fort Collins
June 14, 1995
Mr. Mick Aller
Aller-Lingle. Architects
748 Whalers Way
Building E. Suite 20
Fort Collins,.CO 80525
Dear Mick:
; and Environmental
Staff has reviewed the request for the Hamlet at Miramont
Preliminary P.U.D. and offers the following comments:
1. The easterly drive cut on Boardwalk Drive should be shifted to
the shared property line. The adjacent property will be
required to place its curb cut as far west as possible due to
the proximity of the Lemay/Boardwalk intersection. Staff will
assist in obtaining the necessary access. easement from this
property owner. Staff can also assist in writing a. repay
agreement for collecting the expense of installing a public
improvement on the adjacent property.
2. The sidewalk on Boardwalk should be detached to match existing
improvements.. The.walk.may.be four feet wide.. The.parkway
strip should be 4.5 feet wide and feature the street trees.
As noted, street trees will be kept 40 feet from streetlights.
Ornamentals, however, may be planted to within 15 feet of a
streetlight. A detached sidewalk may require some regrading
of the swale to accommodate a parkway strip.
3. Under Plant Notes, Note #2 should state that trees and shrubs
are specified to be kept a minimum distance away from water
and sewer lines including services
4. As mentioned previously, this P.U.D. will trigger the
completion of the large detention pond across the street.
This pond is presently in a temporary condition. The
Stormwater Utility will require that this pond be finished up
as part of the obligation of this P.U.D. Drainage and Utility
Plans should. reflect this requirement. Please. refer to
Stormwater comments being provided to RBD under separate
cover.
5. The Preliminary Plat indicates the title is "Miramont Third
Filing." This title has already been used and cannot be
duplicated. It is suggested that the title be Miramont Fourth
281 North College Avenue • P.O.. Box 580 • Fort. Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (970) 224-6002
r Filing so the all the Miramont plats can be filed
alphabetically in sequence. The P.U.D. can remain "Hamlet at
Miramont".
6. The entire parcel will have one address. Mail will be
delivered to a cluster box by Unit/Building. Number and Name.
The location of the cluster box should be worked out with U.S.
Postal Service for ease of delivery and ease of pick up. This
mail area should feature a concrete pad and meet the other
specifications of the U.S.P.O. There should be some open area
around the cluster box. Have you considered a covering for
the cluster box? For further information, please contact Mike
.Spurgin at the U.S.P.O.
7. Staff is concerned that there is a lack of pedestrian
sidewalks and amenities in the project. The internal drives
should have an edge that defines a safe place for a
pedestrian. Within the given area for hard surface, there
should be a four foot wide concrete area. This area could be
flush with the asphalt drive but it creates a safe zone for a
Pedestrian. Depending on how these internal drives will drain
(crown versus inverted), this concrete area could double as a
wide drainage pan or sloped to accommodate sheet flow
.drainage. This concrete area provides a safe zone that is
clearly delineated from the asphalt and alerts the motorist
accordingly. Please note that this is not a request to widen.
the hard surface already indicated but to treat the edge of
the given area with concrete for pedestrian safety.
8. Staff suggests that there be an internal pedestrian path
within the greenbelt area behind the community building that
runs east to west. This would link six buildings (four six-
plexes and two four-plexes) directly with the clubhouse' (Lots
5, 6, 9, 10, 13, and 14). This would be a great way for
pedestrians to get to the mail cluster box. This path could
be five feet wide and would help establish the clubhouse as a
focal point for the project. (It would be helpful to assign
building numbers or letters for identification on the P.U.D.)
9. Staff is concerned about the lack of pedestrian connections to
the Mail Creek Ditch access road. This area will be an
attractive destination for walking and jogging. Concrete
paths should.be provided at the ends of the parking drives to
take advantage of this amenity. There are three areas where
the parking drives dead. end at the ditch. These .areas would.
be the logical points to connect the project to the ditch
access road.
10. Since the drive aisles are dominated by the garages,
landscaping is needed to soften the appearance of the internal
street system. It is strongly suggested that deciduous shade
trees and ornamental trees be provided along the drive aisles
at the front entries and in the little island between_ adjacent
garages. As presently shown, there is a lack of landscape
materials along the drive aisles creating a very stark, barren
feel. For those units gaining front entry along the drive
aisles, there is very little "curb appeal". Please
investigate other methods of introducing more plant materials
along the internal streets.
11. Along Boardwalk Drive, on the south side of the swale, there
should be more plant material. At minimum, there should be
foundation plantings along all buildings facing Boardwalk.
Additional trees and shrubs could be. planted at the top of the
swale above the high water line.
12. Staff is concerned about the proximity of two four-plexes
(Lots 3 and 4) to Highcastle Drive. The area between these.
buildings and the sidewalk should feature landscape materials
to soften the two story structures and improve the streetscape
along Highcastle Drive.
13. The project does not provide very much guest parking. Will
eight parking spaces located at the clubhouse be sufficient
for 108 dwelling units? Will visitors know that once they
past the clubhouse, there is not surface parking available?
Are there opportunities for providing internal guest parking
spaces that can be scattered throughout the project? Staff is
interested in exploring guest parking options that will make
sense.
14. The entry walls off Boardwalk are acceptable. However, please
delete references to signage from the P.U.D. as project
identification signs are only authorized.if in conformance
with the Sign Code.
15. The Residential Density Point Chart that was submitted is now
out of date. A. new Point Chart was created last summer at the
direction of City Council to implement their "Interim Phasing
Criteria". Based on the new chart, the P.U.D. scores only 63
base points plus 9 bonus points for a preliminary estimated
total of 72 points. Other bonus points may be. available under
criteria k, p, u, and v. You are encouraged to explore
gaining points under these bonus criteria.
(A significant discrepancy is under criterion j. Staff
estimates that only the perimeter along Highcastle Drive is
contiguous to existing urban development. The park. is not
developed. Therefore., only 13 points were awarded for
contiguity,, not 30.)
16. On the architectural elevations, Staff is concerned about the
specification for "fiberglass shingles". A windshield survey
of Miramont .reveals that the fiberglass shingles that are up
are of a high -profile, high-shadowline, series. These
shingles are estimated to be 350 to 400 lbs. per square and
often come with a 30 to 4.0 year warranty. Such shingles are
attractive and durable. The Hamlet should feature fiberglass
shingles of no less quality in order to blend in. with the
neighborhood. "Ordinary three tab" fiberglass shingles will
not be acceptable. Please specify in greater detail the
.roofing material so Staff can evaluate the elevations for
neighborhood compatibility.
17. Staff.is concerned that there is no brick on the elevations.
Is there to be no brick banding along the visible elevations?
Since there is so much of the elevation.taken up.by garages,
there seems to be a need to dress up the structures with
quality materials. Staff suggests that brick be considered
for a portion of the elevations that are most visible.
18. The site plan should indicate the future park to the north and
the surrounding Miramont filings that have been approved.
Also, please provide information regarding the clubhouse (and
its parking) under Site Data. At the time of Final, the site
plan will need a legal description, ownership signature block
with notary, and City approval block. Please provide an
approximate scale for the vicinity map.
This concludes Staff comments at this time. Please note the
following deadlines for the July 24, 19.95 Planning and. Zoning Board
hearing:
Plan revisions are due July 5, 1995.
P.M.T.Is, 10 prints, colored renderings are due July 17, 1995.
As always, please call our office to discuss these comments or to
set up a meeting with the appropriate Staff to discuss the issues
in depth.
Sincerely:
T
Ted Shepard -
Senior Planner
xc: Linda Ripley, 228 Jefferson Street, Fort Collins, CO. 80524