Loading...
HomeMy WebLinkAboutCROWNE AT SUNIGA - PDP230007 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORT NORTHERNENGINEERING.COM | 970.221.4158 PRELIMINARY DRAINAGE REPORT: THE CROWNE AT SUNIGA FORT COLLINS | GREELEY 6 | 11 Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the "Minor" or "Initial" Storm, with a 2-year recurrence interval. The second event considered is the "Major Storm," which has a 100-year recurrence interval. The final event analyzed was the 10-year recurrence interval for comparative analysis only. E. HYDRAULIC CRITERIA The drainage facilities proposed with the Crowne at Suniga project are designed in accordance with criteria outlined in the NECCO Backbone Design Report, FCSCM and/or the Mile High Flood District's (UDFCD) Urban Storm Drainage Criteria Manual. As stated in Section I. C. 1. above, the subject property is not located within a FEMA 100-year or a City of Fort Collins designated floodplain. F. FLOODPLAIN REGULATIONS COMPLIANCE As stated in Section I. C. 1. above, the subject property is not located within a FEMA 100-year or a City of Fort Collins designated floodplain. G. MODIFICATIONS OF CRITERIA No formal modifications are requested at this time. H. CONFORMANCE WITH LOW IMPACT DEVELOPMENT (LID) The project site will conform with the requirement to treat a minimum of 75% of newly or modified impervious area using an LID technique. Please see Appendix C for LID design information, table, and exhibit(s). As shown in the LID table provided in the appendix, 98% of the proposed site will receive LID Treatment, which exceeds the minimum required. I. SIZING OF LID FACILITIES The Stormtech isolator chambers were sized by determining the required water quality capture volume (WQCV) for Major Basin SC. A 12-hour drain time was used in this calculation. Once the WQCV was identified, the minimum number of vaults needed to achieve this volume was calculated. The required WQCV for Major Basin SC is 13,691 cf . A minimum of 60, MC-7200 chambers will be required to meet the storage needs and will supply 16,038 cf of WQCV. Each isolator row will have an inspection port and a Nyloplast basin at the end for easy maintenance and cleanout. A volume calculation utilizing the WQ flow rate into the chamber and the calculated release rate through the fabric was completed. The number of chambers has been increased as needed to confirm the resulting volume is provided within the empty volume of the uderground chambers. This is intended to ensure the chambers do not become overwhelmed in the water quality storm event before "discharging" flows into the surrounding aggregates. For additional clarification, please refer to Appendix C. NORTHERNENGINEERING.COM | 970.221.4158 PRELIMINARY DRAINAGE REPORT: THE CROWNE AT SUNIGA FORT COLLINS | GREELEY 7 | 11 DRAINAGE FACILITY DESIGN A. GENERAL CONCEPT The main objective of the Crowne at Suniga drainage design is to maintain existing drainage patterns and to not adversely impact downstream infrastructure. No notable off-site runoff passes directly through the project site. A list of tables and figures used within this report can be found in the Table of Contents at the front of this document. The tables and figures are located within the sections to which the content best applies. Drainage for the project site has been analyzed using two (2) Major Drainage Basins, designated as Basins SC, & OSC. Both basins have associated sub-basins. The drainage patterns anticipated for the basins are further described below. Major Basin SC Major Basin SC (Stormtech Combined) has 23 sub-basins A-H & R1-R15. Sub-basins A-H consist of asphalt & concrete paving, and landscaping. Sub-basins R1-R15 consist of building roofs only. Major Basin SC has a total area of 9.28 acres and an impervious value of 84%. All runoff generated within Major Basin SC is routed via a combination of overland flow, storm line conveyance, and curb and gutter routing to the Stormtech system. Major Basin SC will receive LID treatment and detention within the Stormtech system. After being treated and detained by the Stormtech system runoff from Major Basin SC will be routed to the NECCO Backbone via an HDPE pipe that is connected to a proposed manhole, which will replace the existing area inlet located in the south-east portion of the site. Major Basin OSC Major Basin OSC (off-Site Combined) has four (4) sub-basins (OS1-OS4) and is associated with the outer permitter of the Crowne at Suniga project site. Major Basin OSC has a total area of 1.79 acres and an impervious value of 6%. Major Basin OSC consists of primarily landscaping and some concrete and asphalt paving. All runoff generated within Major Basin OSC is routed via a combination of overland flow, storm line conveyance, and curb and gutter routing to existing inlets located on 9th street, East Suniga Road, & North Lemay Avenue. These existing inlets outfall into the NECCO Backbone. Runoff generated in Major Basin OSC is negligible and will not have an adverse impact on downstream infrastructure. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. In addition, excerpts from earlier drainage reports referenced in this Section can be found in Appendix E. NORTHERNENGINEERING.COM | 970.221.4158 PRELIMINARY DRAINAGE REPORT: THE CROWNE AT SUNIGA FORT COLLINS | GREELEY 8 | 11 B. SPECIFIC DETAILS As mentioned in Section III.A. the historical 2-year release rate, as perscribed by the NECCO Design Report, will be used as the allowable release rate for the project site. City staff agreed that the Major Basin OSC is mostly pervious and therefore will be allowed to free release into adjacent curb & gutter. However, Major Basin OSC’s area of 1.79 acres will be subtracted from the the project sites total area of 11.07 acres and the remaining area of 9.28 acres (Major Basin SC) will be multiplied by the perscirbed 0.2 cfs/acre to obtain the release rate from the Stormtech system. See Table 1. below. Max Release Rate Calculation by Area Project Site Area (acres) 11.07 Major Basin OSC Area (acres) 1.79 Major Basin SC Area (acres) 9.28 Max Release Rate (cfs) (9.28 ac x 0.2 cfs/ac) 1.86 Table 1 - Maximum release rate calculated by area. LID treatment will be provided for Major Basin SC within the Stormtech System. LID Summary Table Area (ac) % of Area Total Area Treated 9.28 84% Total Area Not Being Treated by LID 1.79 16% Table 2 - Summary of new impervious areas being treated by LID The area that is not getting treated by LID is unable to be captured and routed to the Stormtech system for a few reasons. A. Existing sanitary lines in this area are very shallow and it makes it impossible to have storm lines that are capable of bucking grade all the way back to the Stormtech system. B. The site is bordered by existing easements and Crowne at Suniga is unable to modify the grading in these areas that allow for drainage to flow back into the site. It should be noted that the areas that are not getting LID treatment are mostly landscapinG and thus will have negligible impact on downstream water quality. CHARACTER OF SURFACE1: Percentage Impervious 2-yr Runoff Coefficient 10-yr Runoff Coefficient 100-yr Runoff Coefficient Developed Asphalt .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Concrete .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 0.95 1.00 Rooftop .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………90%0.95 0.95 1.00 Gravel .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Pavers .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 0.50 0.63 Landscape or Pervious Surface Playgrounds .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………25%0.35 0.35 0.44 Lawns Clayey Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.25 0.25 0.31 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.15 0.15 0.19 Notes: Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Rooftop (ac) Area of Lawns (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient A 0.48 0.37 0.05 0.00 0.06 88%0.86 0.86 0.91 B 0.37 0.27 0.04 0.00 0.05 86%0.85 0.85 0.90 C 0.83 0.66 0.05 0.00 0.12 86%0.85 0.85 0.90 D 1.23 0.84 0.11 0.00 0.27 78%0.79 0.79 0.85 E 0.34 0.00 0.34 0.00 0.00 100%0.95 0.95 1.00 F 0.75 0.35 0.15 0.00 0.25 68%0.72 0.72 0.77 G 0.44 0.31 0.08 0.00 0.06 87%0.86 0.86 0.91 H 1.83 1.31 0.21 0.00 0.31 83%0.83 0.83 0.88 R1 0.16 0.00 0.00 0.16 0.00 90%0.95 0.95 1.00 R2 0.12 0.00 0.00 0.12 0.00 90%0.95 0.95 1.00 R3 0.24 0.00 0.00 0.24 0.00 90%0.95 0.95 1.00 R4 0.17 0.00 0.00 0.17 0.00 90%0.95 0.95 1.00 R5 0.14 0.00 0.00 0.14 0.00 90%0.95 0.95 1.00 R6 0.22 0.00 0.00 0.22 0.00 90%0.95 0.95 1.00 R7 0.15 0.00 0.00 0.15 0.00 90%0.95 0.95 1.00 R8 0.15 0.00 0.00 0.15 0.00 90%0.95 0.95 1.00 R9 0.20 0.00 0.00 0.20 0.00 90%0.95 0.95 1.00 R10 0.26 0.00 0.00 0.26 0.00 90%0.95 0.95 1.00 R11 0.14 0.00 0.00 0.14 0.00 90%0.95 0.95 1.00 R12 0.34 0.00 0.00 0.34 0.00 90%0.95 0.95 1.00 R13 0.24 0.00 0.00 0.24 0.00 90%0.95 0.95 1.00 R14 0.31 0.00 0.00 0.18 0.13 53%0.66 0.66 0.71 R15 0.18 0.00 0.00 0.18 0.00 90%0.95 0.95 1.00 OS1 0.48 0.00 0.02 0.00 0.46 6%0.28 0.28 0.34 OS2 0.56 0.02 0.02 0.00 0.52 9%0.30 0.30 0.36 OS3 0.34 0.00 0.00 0.00 0.34 2%0.25 0.25 0.31 OS4 0.41 0.00 0.01 0.00 0.40 5%0.27 0.27 0.33 MAJOR BASIN SC (STORMTECH, COMBINED)9.28 4.11 1.04 2.88 1.25 84% 0.86 0.86 0.91 MAJOR BASIN OSC (OFF-SITE, COMBINED)1.79 0.02 0.05 0.00 1.72 6% 0.28 0.28 0.34 DEVELOPED BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Combined Basins Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2 Tc100 a1 A 0.86 0.91 59 2.24%2.6 2.1 160 0.87%0.013 0.08 2.03 1.3 11.2 3.9 3.4 5.0 5.0 b1 B 0.85 0.90 44 1.66%2.6 2.1 117 0.61%0.013 0.08 1.69 1.2 10.9 3.8 3.3 5.0 5.0 c1 C 0.85 0.90 130 1.82%4.4 3.5 194 1.07%0.013 0.08 2.25 1.4 11.8 5.8 4.9 5.8 5.0 d1 D 0.79 0.85 161 4.08%4.6 3.7 158 0.60%0.013 0.08 1.68 1.6 11.8 6.2 5.3 6.2 5.3 e1 E 0.95 1.00 210 1.67%3.4 2.3 0 N/A 0.013 0.08 N/A N/A 11.2 3.4 2.3 5.0 5.0 f1 F 0.72 0.77 39 6.17%2.4 2.1 175 0.60%0.013 0.08 1.68 1.7 11.2 4.1 3.8 5.0 5.0 g1 G 0.86 0.91 32 4.84%1.5 1.2 196 0.83%0.013 0.08 1.98 1.6 11.3 3.1 2.8 5.0 5.0 h1 H 0.83 0.88 89 2.18%3.7 3.0 156 1.00%0.013 0.08 2.17 1.2 11.4 4.9 4.2 5.0 5.0 R1 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R2 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R3 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R4 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R5 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R6 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R7 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R8 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R9 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R10 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R11 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R12 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R13 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 R14 0.66 0.71 46 2.19%4.3 3.8 0 N/A N/A N/A N/A N/A 10.3 4.3 3.8 5.0 5.0 R15 0.95 1.00 46 2.19%1.5 1.0 0 N/A N/A N/A N/A N/A 10.3 1.5 1.0 5.0 5.0 os1 OS1 0.28 0.34 71 10.95%5.8 5.4 557 1.01%0.013 0.08 2.19 4.2 13.5 10.1 9.6 10.1 9.6 os2 OS2 0.30 0.36 42 2.29%7.3 6.8 592 0.60%0.013 0.08 1.68 5.9 13.5 13.2 12.6 13.2 12.6 os3 OS3 0.25 0.31 70 6.91%7.0 6.5 379 0.58%0.013 0.08 1.66 3.8 12.5 10.8 10.3 10.8 10.3 os4 OS4 0.27 0.33 42 2.29% 7.6 7.0 592 0.60% 0.013 0.08 1.68 5.9 13.5 13.5 12.9 13.5 12.9 a1 MAJOR BASIN SC (STORMTECH, COMBINED)0.86 0.91 59 2.24% 2.6 2.1 160 0.87% 0.013 0.083 0.20 13.1 10.3 1.5 1.0 5.0 5.0 c1 MAJOR BASIN OSC (OFF- SITE, COMBINED)0.28 0.34 71 10.95% 5.8 5.4 59 9.49% 0.013 0.083 0.67 1.5 12.5 10.1 9.6 10.1 9.6 Combined Basins DEVELOPED DIRECT TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration Frequency Adjustment Factor: (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Table 3.2-3 FCSCM Therefore Tc2=Tc10 Rational Method Equation: Rainfall Intensity: a1 A 0.48 5.0 5.0 0.86 0.91 2.85 4.87 9.95 1.19 2.03 4.39 b1 B 0.83 5.0 5.0 0.85 0.90 2.85 2.85 9.95 2.00 2.00 7.41 c1 C 0.83 5.0 5.0 0.85 0.90 2.85 4.87 9.95 2.00 3.42 7.41 d1 D 0.34 5.3 5.3 0.95 1.00 2.85 2.85 9.95 0.92 0.92 3.39 e1 E 0.34 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.92 1.58 3.39 f1 F 0.44 5.0 5.0 0.86 0.91 2.85 2.85 9.95 1.08 1.08 3.98 g1 G 0.44 5.0 5.0 0.86 0.91 2.85 4.87 9.95 1.08 1.84 3.98 h1 H 0.16 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.45 0.45 1.64 R1 0.16 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.45 0.76 1.64 R2 0.24 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.64 0.64 2.35 R3 0.24 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.64 1.09 2.35 R4 0.14 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.37 0.37 1.37 R5 0.14 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.37 0.64 1.37 R6 0.15 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.41 0.41 1.49 R7 0.15 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.41 0.69 1.49 R8 0.20 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.53 0.53 1.95 R9 0.20 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.53 0.91 1.95 R10 0.14 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.38 0.38 1.40 R11 0.14 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.38 0.65 1.40 R12 0.24 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.64 0.64 2.36 R13 0.24 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.64 1.10 2.36 R14 0.18 5.0 5.0 0.95 1.00 2.85 2.85 9.95 0.49 0.49 1.79 R15 0.18 5.0 5.0 0.95 1.00 2.85 4.87 9.95 0.49 0.83 1.79 os1 OS1 0.56 9.6 9.6 0.30 0.36 2.26 2.26 7.88 0.38 0.38 1.58 os2 OS2 0.56 12.6 12.6 0.30 0.36 2.02 3.45 7.04 0.34 0.58 1.41 os3 OS3 0.41 10.3 10.3 0.27 0.33 2.21 2.21 7.72 0.24 0.24 1.04 os4 OS4 0.41 12.9 12.9 0.27 0.33 2.02 3.45 7.04 0.22 0.38 0.95 MAJOR BASIN SC (STORMTECH, COMBINED) 9.28 5.0 5.0 0.86 0.91 2.85 2.85 9.95 22.74 24.06 84.01 MAJOR BASIN OSC (OFF- SITE, COMBINED)1.79 9.6 9.6 0.28 0.34 2.26 2.26 7.88 1.13 1.38 4.80 DEVELOPED RUNOFF COMPUTATIONS Design Point Basin(s)Area, A (acres) Tc2 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM Intensity, i10 (in/hr) Flow, Q10 (cfs) Combined Basins Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) ()()()AiCCQf= B2 100-yr 0.92 5.00 min Storage 121531 ft3 11.07 acres Max Release Rate =1.86 cfs 2.79 ac-ft Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 30400 1.00 1.86 558 29842 10 7.720 47174 1.00 1.86 1116 46058 15 6.520 59762 1.00 1.86 1674 58088 20 5.600 68439 1.00 1.86 2232 66207 25 4.980 76077 1.00 1.86 2790 73287 30 4.520 82860 1.00 1.86 3348 79512 35 4.080 87260 1.00 1.86 3906 83354 40 3.740 91415 1.00 1.86 4464 86951 45 3.460 95143 1.00 1.86 5022 90121 50 3.230 98687 1.00 1.86 5580 93107 55 3.030 101834 1.00 1.86 6138 95696 60 2.860 104859 1.00 1.86 6696 98163 65 2.720 108036 1.00 1.86 7254 100782 70 2.590 110786 1.00 1.86 7812 102974 75 2.480 113658 1.00 1.86 8370 105288 80 2.380 116347 1.00 1.86 8928 107419 85 2.290 118944 1.00 1.86 9486 109458 90 2.210 121541 1.00 1.86 10044 111497 95 2.130 123649 1.00 1.86 10602 113047 100 2.060 125879 1.00 1.86 11160 114719 105 2.000 128323 1.00 1.86 11718 116605 110 1.940 130401 1.00 1.86 12276 118125 115 1.890 132815 1.00 1.86 12834 119981 120 1.840 134923 1.00 1.86 13392 121531 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION VOLUME CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1893-001 The Crowne at Suniga Project Number : Project Name : Stormtech System - Detention A = Tc = Project Location : Design Point C = Design Storm Storage System : Page 1 of 1 1893-001_Pond_FAA_Fort Collins_Detention Volume.xls User Inputs Chamber Model: MC-7200 Outlet Control Structure: Yes Project Name: Crowne at Suniga Engineer: S. King KING Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 121531 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 9 in. Stone Above Chambers: 12 in. Average Cover Over Chambers: 24 in. Design Constraint Dimensions:(110 ft. x 292 ft.) Results System Volume and Bed Size Installed Storage Volume: 123008.69 cubic ft. Storage Volume Per Chamber: 175.90 cubic ft. Number Of Chambers Required: 441 Number Of End Caps Required: 22 Chamber Rows: 11 Maximum Length:282.21 ft. Maximum Width: 101.77 ft. Approx. Bed Size Required: 28127.46 square ft. System Components Amount Of Stone Required: 4127 cubic yards Volume Of Excavation (Not Including Fill): 7032 cubic yards Total Non-woven Geotextile Required:8200 square yards Woven Geotextile Required (excluding Isolator Row): 192 square yards Woven Geotextile Required (Isolator Row): 644 square yards Total Woven Geotextile Required:835 square yards Impervious Liner Required:0 square yards Project Title Date: Project Number Calcs By: City Basins 0.8 WQCV = Watershed inches of Runoff (inches)84% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100)0.284 in A =11.07 ac V = 0.3143 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 13691 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Crowne at Suniga February 13, 2023 1893-001 S. King Fort Collins Stormtech LID Pond 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 00.10.20.30.40.50.60.70.80.91WQCV (watershed inches)Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr ()iii78.019.10.91aWQCV 23 +-= ()iii78.019.10.91aWQCV 23 +-= 12 hr 1.20 WQCV 12 ∗ Pond No : Stormtech Pond WQ 0.92 5.00 min 10453 ft3 11.07 acres 0.24 ac-ft Max Release Rate =2.35 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustmen t Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 4354 1.00 2.35 705 3649 10 1.105 6752 1.00 2.35 1409 5343 15 0.935 8570 0.67 1.57 1409 7161 20 0.805 9838 0.63 1.47 1761 8077 25 0.715 10923 0.60 1.41 2114 8809 30 0.650 11916 0.58 1.37 2466 9450 35 0.585 12512 0.57 1.34 2818 9693 40 0.535 13077 0.56 1.32 3170 9906 45 0.495 13611 0.56 1.30 3523 10089 50 0.460 14054 0.55 1.29 3875 10179 55 0.435 14620 0.55 1.28 4227 10392 60 0.410 15032 0.54 1.27 4580 10453 65 0.385 15292 0.54 1.26 4932 10360 70 0.365 15613 0.54 1.26 5284 10329 75 0.345 15811 0.53 1.25 5636 10175 80 0.330 16132 0.53 1.25 5989 10143 85 0.315 16361 0.53 1.24 6341 10020 90 0.305 16774 0.53 1.24 6693 10080 95 0.290 16835 0.53 1.24 7046 9789 100 0.280 17110 0.53 1.23 7398 9712 105 0.270 17324 0.52 1.23 7750 9574 110 0.260 17476 0.52 1.23 8102 9374 115 0.255 17919 0.52 1.23 8455 9465 120 0.245 17965 0.52 1.22 8807 9158 *Note: Using the method described in FCSCM Chapter 6 Section 2.3 A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1893-001 The Crowne at Suniga Project Number : Project Name : Stormtech LID Pond Page 1 of 1 1893-001 LID Chamber Summary.xlsx Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Ratea (cfs) Chamber Volumeb (cf) Installed Camber w/ Aggregatec (cf) Mimimum No. of Chambersd Total Release Ratee (cfs) Required Storage Volume by FAA Method (cf) Mimimum No. of Chambersf Storage Provided within the Chambersg (cf) Minimum Total Installed System Volumeh (cf) Stormtech LID Pond 13691 11.37 MC-7200 0.045 175.90 267.30 52 2.35 10453 60 10554 16038 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Chamber Configuration Summary P:\1893-001\Drainage\LID\1893-001 LID Chamber Summary.xlsx