Loading...
HomeMy WebLinkAboutHARMONY MARKET PUD, 12TH FILING - PRELIMINARY & FINAL - 54-87AG - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL STUDY FOR HARMONY MARKET P.U,D.,TWELFTH FILING FORT COLLINS, COLORADO February 20, 1996 Prepared for: Bogaard Construction 5006 Blue Stem Court Fort Collins, Colorado 80525 Prepared by: RBD, Inc. Engineering Consultants 209 South Meldrum Fort Collins, Colorado 80521 (970) 482-6368 RBD Job No. 673-003 Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 970/482-5922 FAX: 970/482-6368 February 20, 1996 Mr. Basil Hamdan City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 RE: FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE HARMONY MARKET P.U.D., TWELFTH FILING Dear Basil: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Study for the Harmony Market P.U.D., Twelfth Filing. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, RBD Inc. Engineering Consultants Prepared by: . m Allen Morley, Project Manager Reviewed by: x"/ David L. Thaemert, P.E. Water Resources Project Engineer Denver 3031458-5526 1 TABLE OF CONTENTS DESCRIPTION PAGE GENERAL LOCATION AND DESCRIPTION ......... .. .................... 1 Location 1 Description of Property .............................................. 1 DRAINAGE BASINS .................................. .. . • . .. _ 1 Major Basin Description ...................................... .. .. 1 Sub -Basin Description .............................................. 2 DRAINAGE DESIGN CRITERIA ................................... .. .... 2 Regulations......_ ........................................... 2 Development Criteria Reference and Constraints ............................ 2 Hydrological Criteria ................................ ...... ..... 3 Hydraulic Criteria.. ................................................. 3 Variances from Criteria ......... .. .. ........................ 3 DRAINAGE FACILITY DESIGN ............................................. 3 GeneralConcept .......................... ..................................................... .......:.................. 3 Specific Details 3 ' EROSION CONTROL ............................ .....:..... .. ........ 5 General Concept 5 SpecificDetails ...................................................... 5 ■ CONCLUSIONS .......................................... ... 6 Compliance with Standards ............................................. 6 ' Drainage Concept . .. 6 Erosion Control Concept ............................................... 6 ' REFERENCES .......... .................................................. ............................................. 7 APPENDIX VICINITY MAP 2 HYDROLOGY CALCULATIONS 3 EROSION CONTROL 8 INLETS 13 TABLES AND FIGURES EXCERPTS FROM FINAL DRAINAGE REPORTS for HARMONY MARKET P.U.D. SECOND AND T MM FILING (pocket) 18 DRAINAGE AND EROSION CONTROL PLAN (pocket) 20 FINAL DRAINAGE AND EROSION CONTROL STUDY ' FOR THE HARMONY MARKET P.U.D.TWELFTH FILING FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION A. Location i n The Twelfth Filing of Harmony Market P.U.D. is located south of Harmony Road between Boardwalk Drive and Lemay Avenue. It can also be described as being immediately south of Harmony Road between the Red Robin Restaurant and the Outback Steak House. More specifically, this site is located in the Northeast Quarter of Section 1, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, Larimer County, Colorado. B. Description of Proper 1 The existing Harmony Market P.U.D. has been developed in several phases and contains a Pace Warehouse, Builders Square, Steele's Market, First Bank, Jiffy Lube, Lee's Cyclery, and several restaurants along the frontage of Harmony Road. The Harmony Market P.U.D. Twelfth Filing site contains approximately 0.65 acres and is currently undeveloped and is sparsely vegetated. The site slopes gently ( 1.7%) from north to south. The proposed purpose for the subject site is currently understood to be retail usage. It. DRAINAGE BASINS A. M-g,jor Basin Description The project site is located within the McClellands Basin. No major drainage way exists within the Harmony Market P.U.D. development or immediately downstream within the Oak/Cottonwood Farm site. B. Sub -Basin Description The Twelfth Filing of Harmony Market P.U.D. lies within Basin A, as laid out in the Harmony Market RUD. Overall Drainage Plan, amended with the Third Filing of the P.U.D., also known as Steele's Market. The Basin A catchment encompasses an area 1 which contains a parking lot, access road, two restaurants and a portion of Boardwalk Drive. The completion of this project will fully develop Basin A. (see Overall Drainage Plan, provided in the back pocket of this report). Detention for Basin A is provided by Pond A, which has had no modifications to its catchment area since the original Report - Harmoniy Market P U D , Filing One Final, Total Site Preliminary: Pond A provides a detention volume of 1.75 ac-fft. and has a release rate of 1.7 cubic feet per second. M. )RAVAGE DESIGN CRITERIA A. Regulations. The City of Fort Collins Storm Drainage Design Criteria is being used for this subject site. B. Development Criteria Reference and Constraints As stated earlier, flows from the site contribute to Detention Pond A in Basin A, shown on the Overall Drainage Plan for the Harmony Market P.U.D. in the back pocket of this report. The Harmony Market P.U.D.- Overall Drainage Plan, amended with the Third Filing, Total Site Prelimin report considered this site to be completely impervious. This site is considered to have an impervious coefficient of 0.95. C. wdrological Criteria ' The Rational Method is being used to determine run-off peak flows from the study site. Rainfall criteria for this study was obtained from the City of Fort Collins and is included in the Appendix within the Detention Section. The 10- and 100-year rainfall criteria were utilized to determine the developed flows D. Hydraulic Criteria All calculations within this study have been prepared in accordance with the City of Fort Collins Drainage Criteria. E. Variances from Criteria A variance for erosion control is sought. The effectiveness during construction is 72.9 during construction instead of the required 79.6. We feel that the measures provided will effectively prevent erosion transport to adjacent areas and any further Imeasures are unnecessary. IV. DRAINAGE FACILITY DESIGN A. General_ Concept All stormwater, off -site and on -site, will sheet flow to the north area inlet in Pond "A" where they will be detained and released. As stated previously this flow contribution was expected and accounted for in the calculations for Pond W. Included in the back pocket of this report is the Drainage and Erosion Control Plan for Harmony Market P.U.D., Eleventh Filing. B. Specific Details Off --site stormwater flows will be taken east around the back of the building in a trickle channel discharging to the parking lot then to a curb chase at design point 1.. Then the offsite flows will cross the access road and parking lot to the north inlet of Pond `A'. On -site stormwater is taken south to the north area inlet of Pond `A'. The roof areas of basins 1,2 and 3 discharge to the parking area at the front of the building. Basin 1 includes a small strip of land at the back of the building which receives off -site flows from Basin 6. The storm water from this area is taken east around the building in a trickle channel to the parking lot. All stormwater then sheet flows south across the access road and to the north Inlet of Pond W. Basin 2 takes all of its flows to a 2 foot wide curb chase which discharges onto the access road in Basin5. ' Basin 3 takes all of its flows to a 2 foot wide curb chase which discharges onto the access road in Basin 4. Basin 4 receives stormwater through the curb chase in Basin 3 and from offsite basin 7, all stormwater then sheet flows through the site access drive and across the access road to the north area inlet of Pond `A'.. Basin 5 receives stormwater from Basin 2 through a curb chase. The stormwater then flows across the access road to the north area inlet of Pond W. 1 L�' V. EROSION CONTROL A. General Conceot The Harmony Market P.U.D., Twelfth Filing lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins zone maps. The potential exists for silt movement during construction of the parking/driveways and building Thus the new improvements will be subjected to both wind and rainfall erosion. ' Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites and related calculations in the appendix, the erosion control performance standard(PS) for the subject site during construction is 79.6 and after construction is 93.7 From the calculations in the appendix, the effectiveness(EFF) of the proposed erosion control plan is 72.9, during construction and 98.07 after construction. It is anticipated that the construction duration of this project will be less than 8 weeks due to the limited amount of work to be completed, therefore the erosion control plan as specifically detailed below, should meet the City of Fort Collins requirements. A copy of the erosion control calculations is included in the Appendix. An erosion control escrow cost estimate of $2,250 is also included in the Erosion Control Section of the Appendix. B. Specific Details ' Immediately upon completion of over lot grading the silt fencing shown on the drainage and erosion control plan should be installed. In order to protect the curb chases from receiving excessive silt deposits, the curb chases will. have gravel filters installed around them. The above items can be removed once asphalt and landscaping in their respective areas have been completed. VIOL CONCLUSI ONS A. Compliance with Standards All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. 1 1 B. h] C. 0' Drainage Concept. The proposed drainage concepts presented in this report and shown on the Drainage and Erosion Control Plan are in compliance with the City of Fort Collins drainage criteria. This project was designed to be in conformance with the intent of the Overall Drainage Plan for Harmony Market P.U.-D.. The proposed erosion control plan adequately provides for the control of wind and rainfall erosion from the study site. A variance has been requested to allow an effectiveness during construction 72.9 instead of the calclulated performance standard of 79.6. Through the construction sequence and proposed erosion control measures, the City of Fort. Collins performance standards will be met. The proposed erosion control concepts presented in this report and shown on the Erosion Control Plan are in compliance with the City of Fort Collins erosion control criteria. 5 1 1. 2. 3. 4. RBD Inc., Harmony Market P UD Second Filing Final Drainage Report Total Site Preliminary- Revised Drainage Report- Fort Collins, Colorado, August 13, 1990. RBD Inc., Harmony Market P.U.D., Third Filing Final Drainage Report City of Fort Collins, Storm Drainage Design Criteria and Construction Standards, May 1984, Revised 1992. City Of Fort Collins, Erosion Control Reference Manual for construction Sites, January 1992. 0 D APPENDIX I J 7 q 7 1 YICE'SaTY MAP 7 1 n Z% WARREN LAKE TROUTM kN PKWY• S� HARMONY RD. OR- i W PROJECT o� Lou :OAKIIDGE SITE2 � 0 r4 di } Q y T 0 W Ti vi �FF,F •..�, MAIL CREEK O% PORTNER cy LAKE h, I - - - - - - Al VICINITY MAP 3/ n 1 1 1 H"ROLOGIC CALCULATIONS 4/ L 0 El 0 1 1 Z O S c F- LL w U O U p LL d w V C 0 E mQ m p W F- Ug W � O� dU M O 0 cq P- R e Y � M T B � W C C O N O O CO L6 L6 Sri (O Lci L6 vi LL W s 5 O 0 O x U U �i 0 z 0 0 0 O N O O w . O V O 6 O C O O U, (V 6C74HhM rn W �W W w M 000aG000 N��W OOtt v v Zw �E ao •- ch ai ri _� H aoQaaao Zsr- Lo w movotoOv W p t0 v NcviNcM ZW oa�ov��oo �a. oFeLo (V (V fV TCV W CO p = o000000 v�oMC14 F=Wv ZW �tntANtnOM MO)OC�f*MO U M o00000 Q 0 0 h 6 01-- v NT—TIT -O �jN Ooo000fO Z fA QUT. �NMst�01� W T �p N lC U A2 s U f- v c 0 c 0 d rn m c E `0 N r s1 O p M U x< U CO N II 11 � v F- 0 d a O 0 01 'LNL N v �a � o0 o LL p � LLI Q p OQ Z N O Q O C lL z W O U p O (L W y ' F- c oc ` C G ' eQ m p W U� o Wjo ' w Q aU C o 0 m Q M E g t E W E o A A E E E E E E E E 5 E E �.0.00000 Q(o Ul) LO LO ui LO LO z«�.'E A w a c a a Ia U Z a a a 0. a W O A A w g g g OU. :3 20 A A A A 2 V I�OOONOO M(D(OCMO(o(o r-MMd'M1�1� U y m W w �> �' WW ob000000 �n�vrn000 �o F- CO _ OO O 00 0D C co F- Z M v~ W J e uJ E (O Zy H Z 0 0 0 0 0 0 0 W oao.r(of`0.o N g o c Ln N N N � J W N ox o000000 .t 0 M V � .- Q Z _� Z W rn o 0 0 •t cl co st O O O 431 st M Ln(or—m0 t NV� V7T- * •-O o000000 Q m Q z fn,.. �NM�tn (Ot� U m W �p co W z Z LL tiO>01O.CaIW 0 D z U. U. Z N OQV� �LLL 000Ir-V-00 Z- Oy LO co r-- m co 1-et N 0000000 c7OO000C OggcoNqq z -9a LA U-) N LA Ln to tr) u ti 0 In N LO M O uiC)CRC�IlMch U c O 0 0 0 0 0 0 0 0) O O O N O O E v (O Lr; N L6 CD (1) Lf) O O O O O O O W ccgNMlntocor .— to ui N N .-NMI tAcol*- � J V L F I I E L I I � I I I I � k 2 � kR � § o0,N � 4 d d 7% � / §� ` .. .. .. ... 03 ddddddd $� � 0000ddo R�9C�RRCD $f 00 0)0) a) ¢ CY) ¥ -AdgodA dLf)agLOaLf) �i- § opooddo E\ R � T--V- � ---cb��r-cDor- _ 1.6 § cli $§- Ell 1 r- I r f J EROSION CONTROL 27 1 IRBD, Inc. �l ' #673-003 11 1 1 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: Harmony Market PUD, 12th filing STANDARD FORM CALCULATED BY: JAM DATE: 02/19/96 Developed Erodibilty Asb Lsb Ssb Lb Sb PS Subbasin Zone (ac) (ft % ft % % 1 moderate 0.08 430 0.90 2 moderate 0.16 110 1.80 3 moderate 0.17 100 2.40 4 moderate 0.19 130 2.60 5 moderate 0.05 40 2.70 Total 0.65 147 2.1 79.6 tXAMVLt I:ALUULA I IUN0 Lip = sum(AiLi)/sum(Ai) = (0.08 x 430 + .;. + 0.00 x 0)/ 0.65 447 ft Sb = sum(AiSi)/sum(Ai) = (0.08 x 0.90 + ... + 0.00 x 0.00)/ 0.65 2.1 % PS (during construction) = 79.6 PS (after construction) = 79.6/0.85 = (from Table 8A) 93.7 1 1 RBD, Inc. 1 1 1 1 1 1 1 1 71 U 0 E EFFECTIVENESS CALCULATIONS Total Site as one phase i4F7'i_nn4 PROJECT: Harmony Market PUD, 12th filing STANDARD FORM B CALCULATED BY: JAM DATE: 02/19/96 Erosion Control C-Facto P-Facto Comment Number Method Value Value 6 Gravel Filter 1 0.8 placed at curb chase 8 Silt Fence Barrier 1 0.5 placed at downstream property boundaries 9 Asphalt/Concrete Pavement 0.01 1 building also considered paved 1 Bare Soil - Packed and smooth 1 1 1 Bare Soil - Packed and smooth 1 1 1 Bare Soil - Packed and smooth 1 1 1 Bare Soil - Packed and smooth 1 1 MAJOR AREA BASIN % ac SITE 79.6 0.65 SUB AREA Practice C'A P'A Remarks BASIN_ BASIN ac SITE . DURING CONSTRUCTION 1 0.08 8 0.08 0.04 Sift Fence Barrier 2 w/o building 0.10 8 0.10 0.05 Sift Fence Barrier 2-building 0.06 9 0.00 0.06 Asphait/Concrete Pavement 3 w/o building 0.07 8 0.07 0.04 Sift Fence Barrier 3-11building 0.10 9 0.00 0.10 Asphalt/Concrete Pavement 4 w/o building 0.06 8 0.06 0.03 Silt Fence Barrier 4-building 0.02 9 0.00 0.02 Asphalt/Concrete Pavement 4-ebst asphalt 0.05 9 0.00 0.05 Asphaft/Concrete Pavement 5 construction 0.01 8 0.01 0.01 Sift Fence Barrier 5-existing asphalt 0.05 9 0.00 0.05 Asphalt/Concrete Pavement 0.32676 0.438 Cnet[0.08x1.00+...+0.05x0.01)/0.65 = 0.50 Pnet = 0.8x[0.08x0:50+...+0.05x1.00)/0.65 = 0:54 EFF = (1-C•P)100 = (1-0.50.0 54)100 = 72.90 ««< 79.6 (PS) Assume paving not constructed within 6 weeks; use gravel inlet fillers at all area inlets & silt fence at swales & downstream perimeters. 1 u/ RBD, Inc. 1 1 1 1 1 1 1 1 1 Total Site PROJECT: Harmony Market PUD, 12th filing STANDARD FORM B CALCULATED BY: JAM DATE: 02/19/96 Erosion Control C-Facto P-Facto Comment Number - - Method Value Value 9 Asphalt/Concrete Pavement 0.01 1 Paved and constructed also building 16 Established Grass Ground Cover- 70% 0.04 1 Lawns and openspace 19 Established Grass Ground Cover - 100% 0.02 1 Area not disturbed during construction BASIN %o ac SITE 93.7 0.65 tggn- 1 2 w/o building 2-building 3 w/o building 3-building 4 w/o building 4-building 4-exist asphalt 5 construction 5-existing asphalt AKCA 0.08 0.10 0.06 0.07 0.10 0.06 0.02 0.05 0.01 0.05 Practice C'" A P * A Remarks AFTER CONSTRUCTION 16 0.00 0.08 Established Grass Ground Cover - 70% 9 0.00 0.10 Asphalt/Concrete Pavement 16 0.00 0.06 Established Grass Ground Cover - 70% 9 0.00 0.07 Asphalt/Concrete Pavement 16 0.00 0.10 Established Grass Ground Cover- 70% 9 0.00 0.06 Asphalt/Concrete Pavement 9 0.00 0.02 Asphalt/Concrete Pavement 9 0.00 0.05 Asphalt/Concrete Pavement. 16 0.00 0.01 Established Grass Ground Cover - 70% 9 0.00 0.05 Asphalt/Concrete Pavement Cnet = [0.08x0.04+...+0.05x0.01.j/0,65 = 0.02 Pnet = [0.08x1.00+...+0.05x1.00]/0.65 0.92 EFF= (1-C-P)100 = (1 -0.02-0:92)1 00 98.07 > 93.7 (PS) 1q RBD, Inc.: EROSION CONTROL COST ESTIMATE PROJECT: -Harmony Market PUD, 12th filing #673-003 PREPARED BY: JAM ___ DATE: 02/19/96 CITY RESEED—ING COST Unit Total Method Quantity Unit Cost Cost Notes Reseed/mulch 0.65 ac $1,300 _ $845 See Note 1. Subtotal $845 Contingency 50% $423 Total $1,268 EROSION CONTROL_ MEASURES Unit Total Number Method Quantity Unit Cost Cost .Notes 6 Gravel Filter 2 ea $300 $600 8 Silt Fence Barrier 300 LF $3 $900 Subtotal $1,500 Contingency 50% $750 Total $2 250 Total Security $2,250_ Notes: 1. A<1 ac=$1300/ac; A=1-10 ac=$650/ac; A>10 ac=$500/ac. L i3/ 0 1 0 1 1 p 1 INLETS 24 1 Rectangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: jim Comment: Check capacity of curb 2 foot curb chase Solve For Discharge Given Input Data: Bottom Width..... 2.00 ft Manning's n...... 0.016 Channel Slope.... 0.0020 ft/ft Depth............ 0.39 ft Computed Results: Discharge........ 1.36 cfs Velocity......... 1.77 fps Flow Area _........ 0.77 sf Flow Top Width... 2.00 ft Wetted Perimeter. 2.77 ft Critical Depth... 0.24 ft Critical Slope... 0.0080 ft/ft Froude Number.... 0.50 (flow is Subcritical) Open Channel Flow Module, Version 3.21 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 1 1 1 1 1 1 1 1 1 1 1 1 Q w �O wto 0w V) z �o U)W W O J Li a. acoo 14V B I J a ww (no I�� I 7 y Q ' EN OO ' F- W ~Q Lo Z a o aQ 0y W OQ N. 11 Q LL- Z/ t o ' (V „9 Q Q O U W UI N W Q- r. O (V (n .` m o co` b in m I LO I I Z i14 14- �• � W = a 'a w O • N (n 151 d Fj CLIENT �� �� -� 7 � ti� �=• ti JOB NO. INC PROJECT �• �� Z*� CALCULATIONS FOR Engineering Consultants MADEBYa' 'DATE_2w CHECKEDBY DATE SHEET / OF Z�� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: jim Comment: capacity of trickle pan Solve For Discharge Given Input Data: Left Side Slope.. 4.00:1 (H:V) Right Side Slope. 4.00:1 (H:V) Manning's n...... 0..016 Channel Slope.... 0.0050 ft/ft Depth............ 0.38 ft 4,S Computed Results: Discharge........ 1.19 cfs Velocity......... 2.11 fps Flow Area........ 0.56 sf Flow Top width... 3.00 ft Wetted Perimeter. 3.09 ft Critical Depth... 0.35 ft Critical Slope... 0.0069 ft/ft Froude Number.... 0.86 (flow is Subcritical) Open Channel Flow Module, Version 3.21 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 k G/ LI 1 G TABLES AND FIGURES 34 LIJ o o� Q U �- u z z �1,0) o O O Q u U } -- `` U_ r Q V) N I cf i`- c Oz u O z �} Q r' J ct w z ^ u - D 0 � Oc O n o }- W CLL�u cL `z z `J I � w W / Fa'NL:1 = D `'- z — z _moo o o Q J U >-- Q a ' LLL.. tN .J 0 2 Q U z Q _I I 1 TT T 1 If L I 1 1 1 II 1 I I I I IIIII, i l l l I I ILA __ 1 IT 11f1 I I III spa imfmnwM . �rmr�,s>em� a�urcca min r.m...s . O to �;- N - O 8nOH 82d &IHO'•I—N01.Ldlld1038d 3.2 DESIGN CAITIEFIA 2 1 �1 EXCERPTS FROM ' FINAL DRAINAGE REPORTS for ' HARMONY MARKET P.U.D. SECOND AND THIRD FILINGS 1 1-1 1 1 15 ' BASIN "A" MASS DIAGRAM METHOD f or - DETENTION VOLUMES PROjECT: PACE COMMENTS: 100 YEAR STOR11 !"!AXI!"!t. M AL_1._OWi,l=LE RELEASE QF'S) _ 1.7 C -- 1 A(area) = 8.43 TIME OF CONCENTRATION TIME t i*f ---•---------•--- 5 10 ' 15 20* 25 30 40 45 50 55 60 iJ 70 so 90 100 110 lzu CA I INFLOW OUTFLOW lirfl!-r) (cu +0 ti u ft) ------------------------ 8. 40 9 22896 510 8.43 7.3 37142.4 1020 8.48 6 45792 1 530 8.48 5.2 52915.2 2040 8.48 4.6 58512 2550 8. 48 4.15 63345.6 3060 9.48 3.8 67670.4 3570 8.48 3.5 712.E+2 4080 8.48 3.25 74412 4590 8.48-- 3 76320 5100 8.48 2.8 7e355.2 5610 8.48 2.6 79372.6 6120 8.48 2.3 81916.8 7.140 8.48 2.05 .83443.2 8160 8.48 1.85 84715.2 9180 8.48 1.7 86496 10200 8.48 1.55 26750.4 11220 8.48 1.45 88531.2 12240 STORAGE t (ac_' ft) 22086 0.511911 9.11 36122.4 0.829256 4426; 1.016115 50875.2 1:167933 55962 1.284710 60285. 6 1 . ZS3966 64100.4 1.471542 67152 1.541597 69S22 1.602892 71.220 1.634996 72745.2 1.6.7 73252.8 . 1.491652 74776,8 1.716639 75283.2 1.728264 75535.2 1.734049 76296 1.751215 75530.4 1.733939 76291.2 1.751404 dF�F�c.F 7EStc��+- 4 .3 A ' Z 2.� A5