HomeMy WebLinkAbout1612 SMITH PL EXTRA OCCUPANCY - FDP230017 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTExtra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
Development
Application
Complete Submittal
Checklist
Submittal Instructions
•A City Development Review Coordinator will be assigned to all projects -Your
Development Review Coordinator is available to assist you with the review
process.If you do not have a review coordinator assigned to your project,please
contact us at 970-221-6689 or DRCoord@fcgov.com for assistance.
•Advanced notice of Submittal and resubmittals is appreciated -A completed copy
of this checklist,all submittal materials and fee payments are due at the time of
project submittal.Please contact your Development Review Coordinator at
970-221-6689 or DRCoord@fcgov.com for more submittal details including
turnaround times and next steps.
•Only complete submittals are accepted -The submittal may be returned to the
applicant if any required materials or application fees are missing or insufficient.
Submittals received Monday morning through Wednesday noon will be routed for
review the same week and submittals received after Wednesday noon will be
held and routed the following week.
•This checklist shall be used in tandem with the Submittal Requirements
Document.The applicant must complete this checklist and acknowledgement of
the Submittal Requirements Document.
•The applicant shall be the designated contact person who will receive
correspondence from city staff and referral agencies.
Additional Resources
•Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
•Development Review Applications and Submittal Requirements Main Page:
https://www.fcgov.com/developmentreview/applications.php
•City Land Use Code:
https://library.municode.com/co/fort_collins/codes/land_use
•City Utilities:
Development Forms,Guidelines &Regulations
•City Engineering main page:
https://www.fcgov.com/engineering/
•The City’s Comprehensive Plans:
City Plan and Transportation Master Plan
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
•Online City Map Resources:
https://www.fcgov.com/gis/maps.php
•Larimer County Urban Area Street Standards:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standar
ds
Development Review Center |281 N College Ave |Fort Collins CO 80522 |970.221.6689 |
DRCoord@fcgov.com
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
Complete Submittal Checklist:
Final Development Plan (FDP)·Basic Development Review
(BDR)
Project Name:1612 Smith Place,Extra Occupancy
Applicant Name:Laura Grant &Kevin Feldis,owners
Office Use Only:Project Type:______PDP/FDP
Project Number (if assigned):__________________
X New Submittal Revision Review
Round:____
Submittal Date:_____________
Project Review Meeting Date:_________________
Development Review Coordinator:____________________________________
This checklist is for the Final Review phase for all development projects (see Step
7 of the process flowchart).This includes final detail required for Project
Development Plans (PDP).The checklist shall also be used for Basic
Development Reviews (BDR)or plan amendments including Major Amendments
(MJA)and Minor Amendments (MA)as determined by staff.
All checklist items are required unless city staff indicates an item is
(W)aived,(D)eferred,(N/A)Not Applicable or already (R)eceived.If the staff
code is blank,then the item is required.This checklist must be reviewed,
completed and accepted by staff prior to project routing.Additional information
may be requested from the applicant during the review process,if necessary,to
address specific issues that arise.Please note that all application materials,once
submitted,become a matter of public record.
Checklist,Submittal Forms and Fees:
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
Staff
Code
Applic
ant
Validat
ion
Item Description Submittal
Requirement
Resources
REQ X One copy of this checklist,completed and signed by
applicant
Development Review
Coordination
DRCoord@fcgov.com
970-221-6689REQXOnesignedcopyofDevelopmentApplicationForm
REQ X Payment for the above application form
Payments can be made by check or credit card.
Check:Make payable to City of Fort Collins.Mail to the
Development Review Center,281 N College Ave,Fort Collins,
CO 80524,OR place in the blue drop box located at the west
side of the building.Credit Card:Would be processed over the
phone.Credit card payments include a convenience fee of 2%+
$0.25 added to all payments under $2,500.00,and 2.75%added
to all payments over $2,500.00.
5/13/2022 2 FDP/BDR Development Application Submittal Checklist
Electronic Copies*
All copies must be provided per City file naming standards and submitted
electronically.All copies must be prepared per city PDF formatting standards.
See:Submittal Requirements Section M –File Naming Standards &PDF formatting
standards *Paper copies of plans and reports are not required during development
review.See Submittal Requirements,Section D for drawing format guidelines.All plan
elements shall be clearly drawn and labelled.A scale bar must be provided on all scaled
drawings.Paper copies of plan sheets may be requested complete a timely review,
including instances when the drawing scale is not accurately depicted.
1)General Information:
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
NA X A comment response letter from the project's
Conceptual Review or Preliminary Development
Review staff meeting;for 1st round FDP include
response from the last round PDP;or for resubmittals
include a comment response letter from the prior round
of review.To receive a final copy of the staff comment
letter,contact your Development Review Coordinator
Section C
Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
REQ X Project Information and Design Narrative
2)Planning Submittal Package:
Staff
Code
Applicant
Validation
Item Description Submittal
Requirement
Resources
REQ X Title Block information on all plan sheets Section D
REQ X Cover Page,including:
REQ X Title Block
X Land Use Table Section E
X Sheet Index Section D
X Signature Blocks
REQ X Site Plan Notes Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
REQ X Site Location Map Section D
REQ X Legal Description
5/13/2022 3 FDP/BDR Development Application Submittal Checklist
REQ X Final Site Plan Sheet(s)(and related hardscape
design detail sheets,See Section I for
Requirements)
Section F
NA Final Architectural Elevation Sheet(s),Materials and
other Detail Sheets (color elevations recommended)
Section G
NA Final Landscape Plan Sheet(s)
Standard city landscape notes,and related planting
detail sheets (See Section I for planting detail
requirements)
Section H and I
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
NA Preliminary Irrigation Plan Section H
Water Conservation
NA Final Lighting Plan,Photometric Plan and Lighting
Detail Sheets
Section I
NA Final Trash and Recycling Enclosure Details (include
these details with the site plan sheets or elevation
sheets)
REQ X Confirmation that all Sheets provided incorporate
City drafting and format standards
Section D
NA Staff Comments:
5/13/2022 4 FDP/BDR Development Application Submittal Checklist
3)Final Subdivision Plat:
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
NA A final subdivision plat of the site.This plat must
conform to the subdivision requirements of the City.
The subdivision plat shall contain proper designations
for public streets,easements,flood plains,floodways
with base flood elevations if required and all other
public rights-of-way.Approval by the Director for Type I
Administrative Review,and approval by the Planning
and Zoning Board for Type II Review by the Planning
and Zoning Board,of the final plan and subdivision
plat,and complete execution,together with all
necessary certifications,shall be required before filing
of the subdivision plat or issuance of building permits.
Each residential lot on the subdivision plat shall
identify if the garage door(s)is recessed behind the
front face of the building,located on one of the other
sides of the building,
detached from the building or located to the front of the
front face of the building.
Please note that,with the Recording submittal,the
subdivision plat is required to be provided in CAD format
at time of recordation.The CAD file for plat must be set
up to be in conformance with GIS's Subdivision Plat
Digital Submittal Standards.Refer to the Recording
Submittal Checklist which will be provided by your
Development Review Coordinator.
Section J
LUC Division 3.3
Engineering Standards
City Contact(s):
•Technical Services –
Jeff County,
JCounty@fgov.com
•Surveying –
John Von Nieda
JVonNieda@fcgov.com
Monument Records
Closure Report
5/13/2022 5 FDP/BDR Development Application Submittal Checklist
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
4)Final Civil Construction Plans (Utility Plans):
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
NA Cover Sheet Utility Plans Checklist.pdf
City Contact:
Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
NA Standard Notes Sheet
NA Existing Conditions and/or Demolition Plan (if required)
NA Overall Grading Plan (if required)
NA Detailed Grading Plan Sheets
NA Overall Utility Plan Sheet (if required)
NA Detailed Utility Plan Sheets
NA Sanitary Sewer Plan and Profile Sheets
NA Storm Sewer Plan and Profile Sheets
NA Water Plan and Profile Sheets (if required)
NA Street Plan and Profile Sheets (if required)
NA Street Cross-sections (if required)
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
NA City of Fort Collins Standard Construction Details
5/13/2022 6 FDP/BDR Development Application Submittal Checklist
5)Final Drainage and Erosion Control Report:
Staff
Code
Applic
ant
Validat
ion
Item Description Submittal
Requirement
Resources
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
NA Final Drainage and Erosion Control Report may
include the following:
Items from the PDP Checklist:
Detention Requirements andCalculations
Offsite Flows (if required)
Floodplain Zone (if required)--Contact
Floodplain Administration staff at
970-416-2632 for questions
Hydraulic Calculations
Detention Basin Calculations
Standard Water Quality and LID
Calculations Include Drainage Plan or
Exhibit in the report
Additional Final Items:
Hydraulic Calculations
Four Step Process
SDI Data Spreadsheet (if required)
Erosion Control Materials
Note:All items shown above are components that
may be necessary with a drainage report analysis.
Not all components may be necessary.The
drainage report analysis must be prepared by a
professional engineer.
Stormwater Criteria
Manual Resource
Page
Stormwater Criteria
Manual Appendices:
A.Required Submittal
Content
B.Stormwater
Facilities
Landscape
Standards
C.LID Implementation
D.Erosion Control
Guidance
E.Erosion Control
Construction Measures
Fact Sheets
F.Erosion Control
Construction Measures
Standard Notes
City Utilities:
Development Forms,
Guidelines &Regulations
For Stormwater or
Floodplain questions,
contact:
waterutilitieseng@
fcgov.com
970-221-6689
Erosion Control
Information:
www.fcgov.com/erosion
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
5/13/2022 7 FDP/BDR Development Application Submittal Checklist
6)Final Reports and Supporting Documents:
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
NA Meeting
Date:
(mm/dd/yy
)
REQUIRED PRIOR TO FDP SUBMITTAL
Building Services Presubmittal Meeting:
Confirmation of completed Pre-Submittal Code
Feasibility Meeting with Building Services.
New Commercial Projects require a pre-submittal
meeting for building code feasibility.This typically takes
place when drawings are 50%complete and in the mid
phases of the Development Review Process,and prior to
Building Permit Submittal.
Applicants are encouraged to review building
requirements as early as possible in the process.For
questions or to schedule this meeting please reach out to
your Development Review Coordinator.
Please Note:Building
Permits will not be
reviewed until
Development Plan
review process is
completed and
recorded.
Building Codes and
Standards
Building Permit Fees
NA Planning Services:
Perspective views of the Building Exterior
(Incorporated into the building elevation sheets)
Section G
NA Building Material Sample Board
D Neighborhood Context Plan
(Overall site plan diagram indicating
surrounding neighborhood features,to be
incorporated into Site Plan sheets or cover
page)
Section C
NA Land Use Code Modification and Alternative
Compliance Requests;staff review,and approval
required prior to Development Review Completion
(if required)
LUC Division 2.8
City Contact:Planning
Services
planning@fcgov.com
970-416-4311
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
D Parking Alternative Compliance Studies
Guidelines for these studies are held by the
Director Parking Impact Study Guidelines
(ifrequired)
LUC Section 3.2.2(K)
City Contact:Planning
Services
planning@fcgov.com
970-416-4311
NA Certification of Notice to Mineral Owner(s)
(if required)
Mineral Rights
Certificate.pdf
5/13/2022 8 FDP/BDR Development Application Submittal Checklist
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
NA Development Review Engineering:
Soils Report
In conformance with the Larimer County Urban
Area Street Standards
Larimer County Urban
Area Street Standards
NA Subsurface Hydrologic Study
NA Development Agreement Information Form Engineering Main Page
City Contact:
Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
NA Final legal descriptions for accompanying deeds of
dedication by separate document
Easement and
Right-of-Way Dedication
Process
NA Final legal descriptions for accompanying
easement vacation request by separate
document
Vacation of Easements
Process
NA Approved and Signed Engineering or Utility Variance
Requests
Larimer County Urban
Area Street Standards
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
NA Traffic Operations:
Transportation Impact Study (TIS)OR
waiver indicated from Traffic Operations staff
(Waiver indication to be provided with initial submittal)
Traffic Operations
Resource Page
City Contact:
Traffic Operations
970-221-6630
NA Utilities –Environmental Engineering:
Erosion Control Cost Estimate
City Utilities:
Development Forms,
Guidelines &
Regulations
NA Utilities –Electric Systems
Engineering:Electric Utility Service C-1
Form
City Utilities:
Development Forms,
Guidelines &
Regulations
NA Utilities –Water Development Fees:
Water Fee Form
City Utilities:Water
development fees page
5/13/2022 9 FDP/BDR Development Application Submittal Checklist
Staff
Code
Applic
ant
Validati
on
Item Description Submittal
Requirement
Resources
NA Environmental Planning:
Ecological Characterization Study (ECS)
If an ECS is required,this must be submitted at
least ten days prior to the development review
application.A copy shall also be submitted at
the time of the application with this checklist.
Section J
Section H
LUC Section 3.4.1
City Contact:
Environmental Planning
970-416-4311
NA Phase 1 Environmental Site Assessment To be provided by
qualified third-party
consultant
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
D City Forestry:
Existing Tree Inventory Plan
Prior to the review submittal,the applicant must
schedule an on-site meeting with City Forestry
to obtain tree inventory information for all
existing trees within the development area.The
meeting is also intended to discuss any
proposed tree removal.
PLEASE NOTE THAT EXISTING TREES
SHOULD NOT BE REMOVED OR DAMAGED
PRIOR TO SUBMITTAL,REVIEW AND
APPROVAL OF THE PROPOSED
DEVELOPMENT.
See Submittal
Requirements Sections
H and L for more
information regarding
documentation of existing
and proposed trees on
landscape plans
City Contact:
City Forestry
forestry@fcgov.com
970.221.6660
City Forestry
Resources:
www.fcgov.com/fores
try
Land Use Code Section:
3.2.1(F)Tree Protection
and Replacement
D Existing Tree Removal Feasibility Request
Provide a letter to City Forestry outlining the
justification for the removal of any existing trees,if
proposed.
D Existing Tree Mitigation Plan
At your site meeting,City Forestry will determine
the characteristics and mitigation requirements
for all existing trees within the project's
proposed Limits of Disturbance.
(if required).
5/13/2022 10 FDP/BDR Development Application Submittal Checklist
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
D Other information and data as required for the
full and complete consideration of the
development (to be completed by City staff):
Hazardous Materials Impact Analysis (if required).
Any special wildlife,wetland,natural habitats and
features,ecological or environmental study or
mapping pursuant to Section 3.3 and 3.4 of the
Land Use Code as requested by the Director.
Other items required:
City Contact:
Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements,Sections A –M.All
documents submitted are complete and the Development Application Submittal
Requirements have been incorporated into the plans (See Development Application
Submittal Requirements for detailed description of requirements).All documents
submitted have been compared and consistent design information is shown on all plan
sheets and reports.
I understand that submittal requirements not sufficiently addressed or deferred may result in
added review time.
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners
Applicant Signature:___Laura_Grant &Kevin Feldis________________Date:____6-14-23__
Phone:______907-529-2050_/907-529-1599____________
Email:____ljgrantalaska@gmail.com_/_kfeldis@perkinscoie.com___
(See Development Application Submittal Requirements for detailed description of
requirements)
5/13/2022 11 FDP/BDR Development Application Submittal Checklist
Extra Occupancy Rental Unit Application;June 14,2023
1612 Smith Place,Ft.Collins,CO 80525;Parcel #9724206004 Glantz subdivision Lot 4
Laura Grant &Kevin Feldis,owners