HomeMy WebLinkAboutHARMONY MARKET PUD, 10TH FILING, LEE'S CYCLERY - PRELIMINARY & FINAL - 54-87AC - DECISION - MINUTES/NOTESMINUTES OF THE PLANNING AND ZONING BOARD
OCTOBER 24, 1994
STAFF LIAISON: BOB BLANCHARD
COUNCIL LIAISON:
The meeting was called to order at 6:32 p.m. by Chairman Rene
Clements.
Roll Call: Carnes, Bell, Fontane, Clements, Cottier, Strom
(arrived at 6:57 p.m.). Member Walker absent.
Staff Present: Blanchard, Eckman, Olt, Ludwig, Shepard, Herzig,
Wamhoff, Vosburg, Schlueter, Deines.
Agenda Review: Chief Planner Blanchard reviewed the consent
agenda, which includes the following items:
1.
MINUTES OF THE AUGUST 22 AND 29TH PLANNING AND
ZONING BOARD HEARINGS.
2.
#54-87AC
HARMONY MARKET PUD, LOTH FILING, LEE'S CYCLERY -
PRELIMINARY AND FINAL.
3.
#13-82BL
OAKRIDGE PUD, DIAMOND SHAMROCK CORNERSTORE - FINAL.
4.
#66-93E
WINDTRAIL PARR PUD - FINAL (CONTINUED)
S.
#43-94
HORSETOOTH EAST BUSINESS PARR PUD - PRELIMINARY AND
FINAL.
6.
#43-92C
NICO RESTORATION/OFFICE PUD (921 E. PROSPECT ROAD)
- AMENDED FINAL.
7.
#6-87G
TACO JOHNS AT THE SQUARE PUD - PRELIMINARY AND
FINAL.
8.
#3-84H
UPLANDS PROSPECT BUSINESS PARR, FILING 1 - FINAL
(CONTINUED).
9.
#146-79R
TOTAL PETROLEUM AT RAINTREE SHOPPING CENTER PUD,
TRACT H - AMENDED FINAL.
10.
#90-851
WILDWOOD FARM PUD, 3RD FILING - FINAL.
11.
MODIFICATION OF CONDITIONS OF FINAL APPROVAL.
12.
RESOLUTION PZ94-14 EASEMENT VACATION.
13.
RESOLUTION PZ94-15 EASEMENT VACATION.
-14.
RESOLUTION P294-16 EASEMENT VACATION.
15.
#40-94A
EAST LINCOLN ANNEXATION AND ZONING.
DISCUSSION AGENDA:
16. #71-93B WATERGLEN PUD - FINAL.
17. #44-94 WOODLAND STATION PUD - PRELIMINARY.
Member Bell asked for consent Item #5, Horsetooth East Business
Park PUD, be pulled for discussion.
Chairman Clements asked for a separate vote on item 2 due to a
conflict of interest.
Member Fontana moved for approval of consent items 1, 3, 6, 7, 9,
10, 11, 12, 13, 14, 15.
Planning and Zoning Board Minutes
October 24, 1994
Page 2
Member Bell seconded the motion.
The motion was approved 5-0.
Chairman Clements turned over the meeting to Vice Chairman Cottier.
Member Fontane moved for approval of Consent Item 42.
Member Carnes seconded the motion.
The motion Was approved 4-0, with Chairman Clements abstaining for
a conflict of interest.
#43-94 HORSETOOTH EAST BUSINESS PARK PUD - PRELIMINARY & FINAL
Member Bell asked for discussion about the parking demands of this
project.
Planner Olt responded that the applicant was proposing 54 vehicle
parking spaces for the 7,000 s.f. building. That would work out to
be 7.7 spaces for east 1,000 s.f. of leasable floor area. The
applicant was here to address Member Bell's question.
Eldon Ward, Cityscape Urban Design, stated that this medical
building was set up to be a fairly intense use. The 7,000 s.f.
building would be shared by 7 doctors. The breakdown would be 7
doctors, clerical and reception staff, nurses, technicians, and
patients. If, on a full booked day, 52 spaces would be needed.
There is not any readily available transit to this area. This
building is also set up for shared parking for another building in
the future. When that building develops the overall parking ratio
would be 4.8 per 1,000.
Member Bell asked if the total number of parking spaces was
including the additional future building.
Mr. Ward replied that all that was included in this PUD was this
building, the additional future building was anticipated to be
2,500 s.f. conventional office/industrial building. There was
another 100 spaces projected that would finish out the development
of this site.
Member Bell asked if the total overall parking ration would be 4.8
spaces per 1,000 s.f.
Mr. Ward replied that was correct.
Member Bell asked if this fit into a national average.