HomeMy WebLinkAboutHARMONY MARKET PUD, 8TH FILING, OUTBACK STEAKHOUSE - PRELIMINARY & FINAL - 54-87AB - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDRAINAGE AND EROSION CONTROL REPORT
FOR THE
OUTBACK STEAKHOUSE SITE
HARMONY MARKET
FORT COLLINS, COLORADO
Engineers/Surveyors
Incorporated
Boulder,
Colorado Springs
4840 Pearl East Circle
Suite 114
Boulder, Colorado 80301
303 4424338
Drexel B arrell
6
v
M
Engineers/Surveyors
Incorporated
Boulder,
Colorado Springs
4W Pearl East Circle
Suite 114
Boulder, Colorado 80301-2473
303 442 4338
Drexel B arrell
July 15, 1994
Mr. Basil Hamden
City of Fort Collins
Utility Services Stormwater
235 Mathews
Port Collins, Colorado 80522
RE: Drainage and erosion control study
for Outback Steakhouse, Harmony Market
Dear Basil
We are submitting to you, for your review and approval, this Drainage and
erosion control study for the Outback Steakhouse at Harmony Market. All
computations within this report have been completed in compliance with
the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal.
Please call if you have any questions.
Respectfully,
David L. Takeda
FA520
John Common, P.E.
Project Engineer
i
PRELI
MINARY &FINAL
I DRAINAGE AND EROSION CONTROL REPORT
FOR THE
OUTBACK STEAKHOUSE SITE
HARMONY MARKET SITE
FORT COLLINS, COLORADO
JULY 15, 1994
Location and Description
The proposed Outback Steakhouse site is located midway between Boardwalk Dr. and S.
Lemay Ave. on the south side of Harmony Rd. The site is a 1.26 acre parcel in the
existing Harmony Market Shopping Center. More specifically the site is in the NE
quarter of Section 1, T6N, R69W, 6th P.M., Larimer County, Colorado. Harmony Rd.
borders the site on the north side.
The proposed site is currently undeveloped with the exception of some minor landscaping.
For the most part the existing ground is grass covered and slopes downward to the
southeast at 2% to 3%.
The only existing utilities within the proposed site is an 8" sanitary sewer line that ends
in the southeast comer. At this point there is a manhole. There is an 8" water line that
runs east -west along the south side.
Existing_ Drainage _Conditions
The proposed Outback Steakhouse site is located in Basin C of Harmony Market.
Currently the site receives runoff from a small section of land. south of Harmony Rd(0.34
acres). This sheet flow continues to run through the proposed site and continues onto
either an existing entry road or an existing access road. These two roads drain into
existing Pond C located further south of the proposed Outback site(see sheets 3 and 6,
Overall Drainage Plan: Builder's Square, and Site Grading Plan; prepared by RBD
Inc.[#386-001, May 1990]). From Pond C, the runoff enters 4 inlets and is carried to
Pond D via 15" RCP. From Pond D runoff flows through a series of culverts to the outlet
located under Oakridge Dr., which borders the Harmony Market on the south side.
Master Drainage Reference
The Outback site is a sub -basin of the Harmony Market PUD Second Filing. Flow and
ponding are in accordance with the original drainage design done by RBD Inc. For more
information, see the drawings previously referenced.
Proposed Drainage Design
All developed site runoff shall drain south to Pond C as planned previously by "D Inc.
All runoff from off -site locations to the north of the proposed site(0:34 acres) will drain
through the Outback parking lot as shown, and then to the existing access road on the
south side of the site. Detention ponding for the proposed Outback site is provided by
Pond C per the original drainage plan.
Flow from the Outback site joins runoff from existing or other sites to Pond C. The
subsequent drainage is outlined previously in this report in the Existing Drainage
Conditions section.
Erosion Control Desi
The Outback site is located within moderate rainfall and wind erodibility zones as
indicated by City of Ft. Collins zoning maps. Potential for erosion exists as soon as
construction begins and will exist until paving and landscaping is completed.
Construction is planned to begin in early October, 1994. The projected opening for the
restaurant is set for late Winter/early Spring 1995. Overlot grading should begin at the
anticipated beginning of the project. Paving should be installed within six weeks of the
overlot grading and permanent landscaping should follow as soon as possible after paving
is complete..
Prior to construction, silt fencing shall be installed on the south side of the site as shown
in the Drainage and Erosion Control plan(in back pocket). Hay bales will be placed at
the entry to the construction site. The hay bales must be in place while construction is
not occurring.
Materials and equipment storage areas should be located to minimize wind erosion. Areas
disturbed but not addressed by paving or landscaping shall be seeded with dry land native
grasses and protected initially with a hydraulic mulch.
Erosion Control Security
Temporary erosion control Measures
Measure
Silt Fences
Hay Bails
Unit
LF
EA
Total site revegitation:
Mulching &
seeding AC
Use temp. measures to establish security.
Security = $1613 x 1:5 = $2419.50
Conclusion
Quandy
355
10
Cost
$2.25
$4
Total
1.26 _ 1$1,280
Per Unit
Total
$800.00
$40.00
$840.00
$1613
All design and computations have been completed in compliance with the City of Fort Collins
storm drainage design criteria. The site design does not substantially change the drainage
patterns. All site drainage will be directed to existing detention ponds.
Wind erosion will be minimized by equipment and supply storage placement and by wetting
exposed bare ground. The project will also be scheduled to minimize the amount of time bare
ground is exposed to the elements.
Written by; ,
David L..Takeda
Reviewed by:
John Common, P.E.
r
► I v66 ♦1 • I IW I!'71
'NO SCALE
41340 PEARL EAST CIRCLE, SUITE 114 (303)442-4338 740 WOOTEN RO.. #108 [7191 591-5151
41340 PEARL EAST CIRCLE, SUITE 114 (303)442-4336 740 WOOTEN RO. #108 [719) 591-5151
EFFECTIVENESS CALCULATIONS
COMPLETED BY: QL7
DATE: 711YI-T-1
Erosion Control
C-Factor P-Factor
Method
Value value Cominent
MAJOR
PS
SUB
AREA
BASIN
BASIN
(Ac)
CALCULATIONS
1.60
MARCH 1991 8-1 s
DESIGN CRITERIA
LOJECT:
CONSTRUCTION SEQUENCE
ovr�,Fc�<
5-/,Vw00se
ar +IARMgrJY MAiztFr- (tFvsao
STANDARD FORM C
iffXQUENCE FOR 19
ONLY COMPLETED BY: _ .p47-
DATEa//r/1 y
Tndicate by use of a
bar line or
symbols when erosion control measures will be installed.
jor modifications to an approved schedule may require submitting a
new schedule for
proval by the City
Engineer.
YEAR
MONTH
0c,4.
I Nov (/mac I JM I Fcb ( I I
I I I I
OVERLOT.GRADING
- -
IND EROSION CONTROL
Soil Roughening
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
®� Other
INFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet. Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
oil Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
i Other