Loading...
HomeMy WebLinkAboutBLOOM FILING FOUR - PDP230003 - SUBMITTAL DOCUMENTS - ROUND 2 - GEOTECHNICAL (SOILS) REPORT (2) CTL|Thompson, Inc. Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County – Colorado Cheyenne, Wyoming and Bozeman, Montana March 30, 2023 Hartford Acquisitions 4801 Goodman Street Timnath, Colorado 80547 Attn: Shane Westlind, Vice President of Land Subject: Preliminary Geotechnical Investigation Addendum Whitham Farms Property aka Bloom Development Fort Collins, Colorado CTL|T Project Number: FC08020-115 L1 CTL|Thompson, Inc. previously provided a Preliminary Geotechnical Investigation for the Whitham Farms property in Fort Collins, Colorado. The investigation was performed under CTL|T Project No. FC08020-115, report dated January 22, 2018. We were provided with cut/fill plans as well as updated site plans and were requested to review our report to verify that the recommendations contained within are still appropriate at this time. Development plans created by Galloway project No. HFH000022.10 dated August 17, 2021, Norris Design, project No. SP100, recorded November 7, 2022, and a cut/fill map provided by a subcontractor at the site were reviewed to prepare this letter. Currently, the site grading is underway over most of the subdivision. Portions of the sanitary sewer have been installed below the proposed Greenfields Drive, between Mulberry Frontage Road and International Boulevard. S torm sewer installation is underway. Cuts on the order of ½-foot to 6 feet are planned, with most of the cut greater than ½-foot expected in areas where there are to be detention ponds. Fill on the order of ½-foot to 7½ feet are planned over much of the site. The material encountered during excavations at the site, that have been observed by CTL|Thompson, appeared to be consistent with that found in our borings. Shallow groundwater and possibly expansive soils were the primary geotechnical concerns at this site. Groundwater was measured at depths of 7 to 23 feet in our borings and is assumed to have remained unchanged. The installation of utilities may result in a change in the groundwater levels. The presence of expansive soils will be further explored during future investigations at the site. The recommendations presented in the preliminary investigation report remain valid. HARTFORD HOMES WHITHAM FARMS PROPERTY CTL | T PROJECT NO. FC08020-115 2 We appreciate the opportunity to work with you on this project. Please do not hesitate to contact us with any other questions or concerns. Sincerely, CTL|THOMPSON, INC. Trace Krausse, EI R. B. “Chip” Leadbetter III, PE Geotechnical Project Engineer Senior Engineer