Loading...
HomeMy WebLinkAboutBLOOM FILING FOUR - PDP230003 - SUBMITTAL DOCUMENTS - ROUND 2 - GEOTECHNICAL (SOILS) REPORT CTL|Thompson, Inc. Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County – Colorado Cheyenne, Wyoming and Bozeman, Montana March 23, 2023 Hartford Acquisitions 4801 Goodman Street Timnath, Colorado 80547 Attn: Shane Westlind, Vice President of Land Subject: Preliminary Geotechnical Investigation Addendum Springer-Fischer Property aka the Bloom Development Fort Collins, Colorado CTL|T Project Number: FC07733-115 L1 CTL|Thompson, Inc. previously provided a Preliminary Geotechnical Investigation for the Springer-Fischer property in Fort Collins, Colorado. The investigation was performed under CTL|T Project No. FC07733-115, report dated May 11, 2017. We were provided with cut/fill plans as well as updated site plans, and were requested to review our report to verify that the recommendations contained within are still appropriate at this time. Development plans created by Galloway project No. HFH000022.10 dated August 17, 2021, Norris Design, project No. SP100, recorded November 7, 2022, and a cut/fill map provided by a subcontractor at the site were reviewed in order to prepare this letter. Currently, the site grading is underway over most of the subdivision. Portions of the sanitary sewer have been installed below the proposed Greenfields Drive, between Mulberry Frontage Road and International Boulevard. Storm sewer installation is underway. Cuts on the order of ½-foot to 6 feet are planned, with most of the cut greater than ½-foot expected in areas where there are to be detention ponds. Fill on the order of ½-foot to 7½ feet are planned over much of the site. The fill is expected to be approximately ½-foot to 3 feet on Filings 2 and 4. The material encountered during excavations at the site, which have been observed by CTL|Thompson, appeared to be consistent with that found in our borings. Shallow groundwater was the primary geotechnical concern at this site. Groundwater was measured at depths of 5½ to 11 feet in our borings and is assumed to have remained unchanged. The installation of utilities may result in a change in the groundwater levels. The recommendations presented in the preliminary investigation report remain valid. We appreciate the opportunity to work with you on this project. Please do not hesitate to contact us with any other questions or concerns. Sincerely, CTL|THOMPSON, INC. Trace Krausse, EI R. B. “Chip” Leadbetter III, PE Geotechnical Project Engineer Senior Engineer 2 HARTFORD ACQUISITIONS SPRINGER-FISCHER PROPERTY AKA THE BLOOM DEVELOPMENT CTL | T PROJECT NO. FC07733-115 L1