HomeMy WebLinkAboutPOLESTAR VILLAGE - PDP220010 - DOCUMENT MARKUPS - ROUND 3 - ECS REPORT15
Comment Number: 9
07/27/2022: FOR PERMIT
EMERGENCY RESPONDER RADIO COMMUNICATION - AMPLIFICATION
SYSTEM TEST New and existing buildings require a fire department
emergency communication system evaluation after the core/shell but prior to
final build out. For the purposes of this section, fire walls shall not be used to
define separate buildings. Where adequate radio coverage cannot be
established within a building, public-safety radio amplification systems shall be
designed and installed in accordance with criteria established by Poudre Fire
Authority. The installation of required ERRC systems shall be reviewed and
approved under a separate permit process through PFA.
LOCAL EXCEPTION: PFA will waive the testing requirement and system
installation in all buildings less than 10,000 sq. ft. and any Type V construction
building less than 15,000 sq. ft. PFA policy P15-510.1
RESPONSE: NOTED
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801,bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
07/20/2022: INFORMATION:
This project is located within the City's MS4 boundaries and is subject to the
erosion control requirements located in the Fort Collins Stormwater Criteria
Manual (FCSCM), Chapter 2, Section 6.0. A copy of those requirements can be
found at www.fcgov.com/erosion .
This project was evaluated based upon the submittal requirements of FCSCM.
Based upon the provided materials we were able to determine a total disturbed area.
Based upon the area of disturbance or this project is part of a larger common
development, State permits for stormwater will be required should be pulled
before Construction Activities begin.
RESPONSE: NOTED
Comment Number: 3
07/20/2022: FOR FINAL:
Please note that the supplied plans are sufficient for a PDP level submittal.
Based upon the supplied materials, site disturbs more than 10,000 sq. ft. and/or
meets one of the other triggering criteria (sensitive area, steep slopes, or larger
common development) that would require Erosion and Sediment Control
Materials to be submitted.
Please provide an erosion control plan for 'Final Plan or Approval Submittal'.
This project disturbs 5 or more acres so erosion control phasing materials will
need to be provided in the erosion control plans, reports and escrow. Please
ensure that the Erosion Control Plans, Escrows, and Reports include phasing
requirements (FCSCM Ch 2 Section 6.1.3, 6.1.4, & 6.1.5)
16
Based upon the supplied materials, site disturbs more than 1 acre or is part of a
larger common development that requires Erosion and Sediment Control
Report to be submitted. Please submit an Erosion Control Report to meet City
Criteria (FCDCM Ch 2 Section 6.1.4) at time of Final Plan or Approval Submittal.
Based upon the supplied materials, an Erosion Control Escrow Calculation will
need to be provided. Please submit an Erosion Control Escrow / Security
Calculation based upon the accepted Erosion Control Plans to meet City
Criteria (FCDCM Ch 2 Section 6.1.5) at time of Final Plan or Approval
Submittal.
RESPONSE: NOTED
Topic: Fees
Comment Number: 2
07/20/2022: INFORMATION:
The City Manager’s development review fee schedule under City Code 7.5-2
was updated to include fees for Erosion Control and Stormwater Inspections.
As of January 1st, 2021, these fees will be collected on all projects for such
inspections. The Erosion Control fees are based on; the number of lots, the
total site disturbance, the estimated number of years the project will be active.
Based on the proposed site construction associated with this project we are
assuming 119 lots, 20.51 acres of disturbance, 3 years from demo through
build out of construction and an additional 3 years until full vegetative
stabilization due to seeding. Which results in an Erosion Control Fee estimate
of $6,620.31
The Stormwater Quality Inspection Fees are based on the number of LID/WQ
Features that are designed for on this project. Based on the plans we identified
5 bioretention/rain gardens, 1 extended detention basin, the estimate of the
Stormwater LID/WQ Inspection fee to be $ $1,825.00 . Please note that as the
plans and any subsequent review modifications of the above-mentioned values
change the fees may need to be modified.
I have provided a copy of the spreadsheet used to arrive at these estimates for
your review.
RESPONSE: NOTED
Department: Floodplain
Contact: Claudia Quezada, (970)416-2494,cquezada@fcgov.com
Topic: Floodplain
Comment Number: 4
07/25/2022: INFORMATION ONLY: A portion of this property is located in the
City-designated, 100-year Canal Importation floodplain and floodway. Any
development within the floodplain must comply with the safety regulations of
Chapter 10 of City Municipal Code
RESPONSE: NOTED, SEE CLOMR
Comment Number: 5
07/25/2022: For Hearing: The drainage report states that the applicant is
A Westrian CompanyA PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES ORSHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLICRIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANSAND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIESTO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORTCOLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT INREPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.STREET TREE NOTE
A Westrian Company ’“”–’’’—’“”