HomeMy WebLinkAboutMIRAMONT TENNIS AND FITNESS CENTER PUD - FINAL - 54-87AA - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST0/.w2iM'7vt
Checksheet
The following check sheet is to be used in the preparation of a. complete submittal of a Final PUD
Plan:
1. Application form (1 copy).
✓ 2. Filing Fee: $2,808.001 -
3. Site plan (25 folded copies).
t/ 4. Landscape plan (16 folded copies).
o2-� 5. Final subdivision plat (21 folded copies).
6. Final utility plans (10 unfolded copies).
7. Final drainage report and plans and grading plans (4 copies).
8. Other documentation as determined by special circumstances.
9. Signage (Circle size) Large Small
S.F. 100 or more D.U: S.F. up to 100 D.U.
M.F. 100 or more D.U. M.F. up to 100 D.U.
Non -Res 50,000 S.F. or more Non -Res 25,000-50,000 S.F.
Non -Res w/ regional impact All other projects not listed
4.16