Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS AMENDMENT TRACT B - MA210028 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORT ADDENDUM TO FINAL DRAINAGE REPORT Ridgewood Hills Sixth Filing Tract “B” Multi-Family Residential Development North of Avondale Road and East of Triangle Drive Fort Collins, Colorado Prepared For: M. Timm Development, Inc. 233 E. Carrillo St., Suite D Santa Barbara, CA 93101 (805) 963-0358 Prepared By: 6112 E. Sienna Bouquet Pl., Cave Creek, AZ 85331 Phone: (303) 913-5382 Revised May 2023 Revised October 2022 December 2020 Proj. No.: 19-449 RIDGEWOOD HILLS SIXTH FILING TRACT “B” MULTI-FAMILY RESIDENTIAL DEVELOPMENT ADDENDUM TO FINAL DRAINAGE REPORT Table of Contents ENGINEER’S CERTIFICATION .............................................................................................. 1 I INTRODUCTION AND BACKGROUND .................................................................................. 2 II PROPOSED MINOR AMENDMENT TO THE DEVELOPMENT PLAN .................................. 3 III DRAINAGE SYSTEM REVISIONS FOR THE NORTH PORTION OF THE SITE .................. 3 IV LOW IMPACT DEVELOPMENT (LID) REVISIONS ................................................................ 5 V CONCLUSIONS ...................................................................................................................... 6 A. COMPLIANCE WITH STANDARDS .................................................................................. 6 B. DRAINAGE CONCEPT ..................................................................................................... 6 VI REFERENCES ........................................................................................................................ 6 APPENDIX DRAWINGS 5/25/23 1 RIDGEWOOD HILLS SIXTH FILING TRACT “B” MULTI-FAMILY RESIDENTIAL DEVELOPMENT ADDENDUM TO FINAL DRAINAGE REPORT ENGINEER’S CERTIFICATION I hereby certify that this Addendum to Final Drainage Report for the design of stormwater management facilities for the Ridgewood Hills Sixth Filing, Tract “B”, multi-family residential development was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the owners thereof. Larry C. Owen, P.E. Registered Professional Engineer State of Colorado No. 29871 5/25/23 2 RIDGEWOOD HILLS FOURTH FILING TRACT “B” MULTI-FAMILY RESIDENTIAL DEVELOPMENT ADDENDUM TO FINAL DRAINAGE REPORT I. INTRODUCTION AND BACKGROUND This report is an addendum to the Final Drainage Report for the Ridgewood Hills Fourth Filing, dated October 2014, which was reviewed and approved by the City of Fort Collins in January 2017. That Final Drainage Report assessed the potential drainage impacts of the contemplated development of a 10.4-acre parcel, located east of Triangle Dr in the southwest region of Fort Collins, CO. That parcel is bisected by what is to be the eastward extension of Avondale Rd. The Final Drainage Report presented designs for stormwater management improvements to mitigate any impacts. The site development contemplated at the time of preparation of the Final Drainage Report consisted of a multi-family residential complex, including 146 dwelling units in a mix of 6-unit, 8-unit, 16-unit and 24-unit buildings, comprising a total of 11 buildings. The drainage analysis in the Final Drainage Report addressed the requirements for on-site stormwater management infrastructure, as well as any necessary upgrades to the two existing detention basins located near the site, and which will serve the detention requirements of the project. The design of on-site improvements also addressed facilities necessary to comply with the City’s Low Impact Development (LID) criteria. The drainage analysis also included an update of the findings of previous drainage studies for the Ridgewood Hills subdivision, to reflect revisions that had been made to the City’s Storm Drainage Design Criteria, subsequent to preparation of those previous reports and construction of the existing detention facilities. Among the findings of the drainage analysis documented in the Final Drainage Report for the Ridgewood Hills Fourth Filing were the following: • The drainage systems for the proposed development of the Fourth Filing would effectively match the two geographic components of the site. • The portion of the site north of Avondale Rd. would, for the most part, be collected by one system, draining to the existing detention basin located north of Triangle Dr. • The portion of the site south of Avondale Rd., and including Avondale Rd. and portions of the existing single-family lots west and south of the south portion of the development site, would be collected by a second system, draining to the existing detention basin located south of Peyton Dr. and east of Fountain Dr. • The two existing detention basins each have adequate capacity to also accommodate the anticipated runoff from the proposed development of the Fourth Filing, with only minor modifications required to the outlet control orifices in the respective detention basins. The reader is referred to the Final Drainage Report for the Ridgewood Hills Fourth Filing for details of the assessment of the overall site, and for context for this Addendum. 5/25/23 3 II. PROPOSED MINOR AMENDMENT TO THE DEVELOPMENT PLAN Subsequent to finalization of the Final Drainage Report for the Ridgewood Hills Fourth Filing, the developer determined that it would be preferable to phase the development of the site and to proceed first with construction of the south portion of the development (Tract A), as well as Avondale Rd., and to delay develop the north portion of the site (Tract B). It was also decided that minor revisions should be made to the building footprints in the respective portions of the site, but with no increase in the development density, number or location of buildings, and no significant change in the land-use percentages for the site. Minor modifications to the parking configuration were determined to be necessary, in order to ensure stand-alone compliance of each portion of the development with respect to the City’s parking requirements for multi-family residential developments. Development of the portion of the site north of Avondale Rd. was deferred, pending reconsideration of the most appropriate style and scope of development for that property. It was determined that no major revisions to the nature or scope of development of the north portion of the site were warranted and, therefore, the revisions to the design of the stormwater management system for that portion of the site were to be only those appropriate to comply with recent revisions to City design criteria. It was further determined that no further modifications would be necessary to the existing detention basin into which Tract “B” will drain. It has since been determined that the clubhouse and pool complex would be removed from the Tract “B” development, and that alternate recreational amenities would be included instead. This proposed substitution was discussed with City staff and approval to proceed with the Minor Amendment application, on that basis, was received from the City on July 26, 2021. Further discussions with staff of the Stormwater Management Department indicated that revisions to the nature and design of the LID facilities in Tract “B” should be made, which led to some redesign of the grading in the eastern portion of the site and some minor revisions to the delineation of the drainage sub-basin boundaries and the hydrologic analysis of the stormwater regime in Tract “B”. This addendum addresses the minor modifications to the stormwater management system for Tract “B” corresponding to the revisions in the site development plan. III. DRAINAGE SYSTEM REVISIONS FOR NORTH PORTION OF THE SITE The overall area that will be drained by the system serving the north portion of the site will be essentially as originally proposed. There will be a portion of the site, consisting of a band of land extending along much of the southern perimeter of Tract “B” and identified as Sub- basin 1, that cannot practicably be collected into and conveyed through the Tract “B” drainage system. This portion of the site, located immediately north of the Avondale Rd. right-of-way, includes approximately 50% of the footprints of the two buildings adjacent to Avondale Rd., along with the landscaped areas between the buildings and the street, and the temporary turn-around at the east end of the Avondale Rd. extension. This area will drain onto Avondale Rd. and into the stormwater system serving the southern portion (Tract “A”) of the site. The aggregate area of this sub-basin is 0.493 ac, which represents 5/25/23 4 approximately 5.9% of the previously proposed total catchment area of the south drainage system (8.334 ac). A significant portion of Tract ”B”, Sub-basin 1, was originally included as part of the catchment area for the south drainage system, as delineated in the 2014 Final Drainage Report for the Ridgewood Hills Fourth Filing, but was deleted from the catchment area associated with the south drainage system, in the 2018 Addendum to the Final Drainage Report, pending the reconsideration of the nature and scope of the development plans for Tract “B”. The deleted catchment area amounted to 0.39 ac, representing approximately 79% of the 0.493 acres that is now proposed to be added back into the south drainage system catchment area. Analysis of the anticipated runoff from this “added back” catchment area indicates a Q2 of 0.62 cfs and a Q100 of 3.18 cfs. A review of the storm drain improvements installed as part of the development of Tract “A” indicates that there is adequate capacity in those improvements (the 5’ Type R inlet on the north side of Avondale Rd. at the southeast corner of Tract “B” and the downstream piping from that inlet to the existing detention pond south of Tract “A”) to accommodate the re-inclusion of the runoff from Sub-basin 1 of Tract “B” into the aggregate stormwater flow to be collected and conveyed by the Tract “A” drainage system. The installed 5’ Type R inlet will intercept 100% of the minor storm flow and 71% of maximum design gutter flow of 3.2 cfs in the north gutter of Avondale Rd., with a carry-over flow of less than one cfs, and there will continue to be excess capacity in the piping runs downstream of the inlet, ranging from 53% to 214% of the required capacity. Based on the analyses conducted as part of the original design of the storm drain system for both Tract “A” and Tract “B” of the development site (see the Final Drainage Report for Ridgewood Hills Fourth Filing), it was concluded that the detention capacities of both detention ponds are adequate to accommodate the expected runoff resulting from build-out of Ridgewood Hills Fourth Filing (both north and south parcels, respectively), and that the only warranted modification to Pond 2 (serving the south portion of the site) would be to replace of the orifice plate at the outlet control works, reducing the diameter of the orifice opening by 0.75”, in order to continue to restrict outflow from the detention pond to the allowable, pre-development rate. The maximum incremental inflow to the existing detention pond, due to the inclusion of this sub-basin in the catchment area of the Tract “A” system, compared to the design inflow indicated by the 2014 analysis for the entire Fourth Filing site, amounts to only 0.115 cfs (0.14% of the total design discharge into the detention basin from the Fourth Filing), which does not warrant any further revisions to the detention facility or outlet control works, compared to those recommended in the 2014 Final Drainage Report. The revised development layout for Tract “B” includes somewhat less impervious area than originally proposed, and thus the design runoff from Tract “B” is somewhat less than set out in the 2014 Final Drainage Report. The maximum design discharge from the site to the existing inlet in Triangle Dr., near the north end of the site, and onward to the existing Detention Pond 1, is calculated to be 21.95 cfs, compared to 28.97 cfs of collected on-site runoff documented in the 2014 Final Drainage Report. Thus, consistent with the recommendations of the 2014 Final Drainage Report, no revisions to Pond 1 appear to be warranted, either to amend the operational capacity or to adjust the outflow restricting orifice. 5/25/23 5 IV. LOW-IMPACT DEVELOPMENT (LID) REVISIONS The previously approved stormwater management design for the north portion of the proposed development (Tract “B”) included a pair of pea gravel-filled, curb-side sediment traps, overflowing to grassed catchment / impoundment swales, each underlain by areas of bio-treatment media. Runoff captured in the impoundment swales was to be discharged to the downstream piped drainage system, either through the bio-treatment media and a embedded perforated underdrain pipe, or via an outlet control structure designed to pass flows in excess of the required Water Quality Capture Volume (WQCV). Subsequent revisions to the City’s LID Criteria (1-19-16) allow for treatment, using one or a combination of LID techniques, designed to capture and treat not less than 75% of the WQCV emanating from any newly developed impervious areas. The aggregate area of impervious surface in Tract B (buildings, pavement, sidewalks and trash enclosures) is 2.389 ac. The revised design of the stormwater management system for the site captures the runoff from 2.105 ac of roof and pavement area in Sub-basins 2 – 10, thus capturing 88.1% of the runoff from impervious areas of the site. The runoff from Sub-basins 2 and 3 is captured and directed to a rain garden located along the downstream edge of Sub-basin 3, designated as the Upper Rain Garden, and having capacity to detain and treat a WQCV treatment volume of 1,194 c.f. (104% of the required capacity). The runoff from Sub-basins 2 – 10 is captured and directed to a rain garden located in Sub-basin 10, designated as the Lower Rain Garden, and having capacity to detain and treat a WQCV treatment volume of 1,784 c.f. (101% of the required capacity). Design worksheets documenting the required and provided capacities of the two rain gardens are included in the attachments to this Addendum. Runoff flows from the respective tributary drainage sub-basins that are in excess of the calculated WQCV for each of the two rain gardens are passed through the rain garden basins, over the top of the WQCV depth, and are conveyed out of the rain gardens ,via appropriate outlet control structures and independent downstream piping, to discharge into the existing Type “R” inlet in Triangle Drive, and from there to the existing Extended Detention Pond facility west of Triangle Drive. The two rain garden areas are designed in accordance with the guidelines set out in Volume 3 of the Mile High Flood District (MHFD) Criteria Manual and the City of Fort Collins Bioretention standard cross-sections, details, and specifications. Each of the two rain gardens includes a Bioretention sand media layer, a diaphragm aggregate layer, and a reservoir aggregate layer enveloping a perforated PVC underdrain system. Consideration of the nature of the native soils underlying the site led to a decision to include a geotextile separator fabric beneath the reservoir aggregate layer, but not an impermeable geosynthetic membrane. Details of the rain garden design are shown on the project drawings. The table below presents a summary of the provided capacities of the two LID rain garden facilities. 5/25/23 6 L.I.D. RAIN GARDEN VOLUME SUMMARY Treatment Area Designation Required Provided Volume (c.f.) Volume (c.f.) Upper Rain Garden 1,147 1,194 Lower Rain Garden 1,763 1,784 Total available WQCV 2,910 2,978 V. CONCLUSIONS A. COMPLIANCE WITH STANDARDS The design of the stormwater management improvements to serve the development of Ridgewood Hills Sixth Filing Tract “B” is in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage system. B. DRAINAGE CONCEPT The proposed drainage improvements for the development of Ridgewood Hills Sixth Filing Tract “B” will effectively protect the proposed development, as well as downstream properties, drainage facilities and natural waterways from the potential impacts of stormwater runoff from the development, resulting in no adverse effects due to the development of this site. Development of the site, as proposed, should have a beneficial impact on water quality in downstream drainage facilities and drainage ways, by reducing and/or delaying the initial discharge of runoff from the site, such that sediments and other potential pollutants typically carried by this first flush are removed from the flow. VI. REFERENCES “City of Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December 2011 “Urban Storm Drainage Criteria Manual”, Volumes 1 & 2, UDFCD, Revised December 2012 “Urban Storm Drainage Criteria Manual”, Volume 3, UDFCD, Revised December 2012 APPENDIX Drainage Area Summary - Entire Site Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.965 0.73 0.75 0.77 0.83 90 Pavement 1.424 0.89 0.90 0.92 0.96 100 Landscape 2.804 0.04 0.15 0.25 0.50 0 Total 5.193 0.40 0.47 0.53 0.69 44.15 Sub-Basin 1 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.136 0.73 0.75 0.77 0.83 90 Pavement 0.148 0.89 0.90 0.92 0.96 100 Landscape 0.209 0.04 0.15 0.25 0.50 0 Total 0.493 0.48 0.54 0.59 0.73 54.85 Sub-Basin 2 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.195 0.73 0.75 0.77 0.83 90 Pavement 0.468 0.89 0.90 0.92 0.96 100 Landscape 0.126 0.04 0.15 0.25 0.50 0 Total 0.789 0.71 0.74 0.77 0.85 81.56 Sub-Basin 3 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.026 0.73 0.75 0.77 0.83 90 Pavement 0.046 0.89 0.90 0.92 0.96 100 Landscape 1.009 0.04 0.15 0.25 0.50 0 Total 1.081 0.09 0.20 0.29 0.53 6.42 Sub-Basin 4 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.316 0.73 0.75 0.77 0.83 90 Pavement 0.672 0.89 0.90 0.92 0.96 100 Landscape 0.325 0.04 0.15 0.25 0.50 0 Total 1.313 0.64 0.68 0.72 0.81 72.84 Sub-Basin 10 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.016 0.73 0.75 0.77 0.83 90 Pavement 0.003 0.89 0.90 0.92 0.96 100 Landscape 0.171 0.04 0.15 0.25 0.50 0 Total 0.190 0.11 0.21 0.30 0.54 9.16 Ridgewood Hills 4th Filing - Tract "B" TRIBUTARY AREAS, RUNOFF COEFFICIENTS, AND PERCENT IMPERVIOUSNESS Sub-Basin 5 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.072 0.73 0.75 0.77 0.83 90 Pavement 0.018 0.89 0.90 0.92 0.96 100 Landscape 0.103 0.04 0.15 0.25 0.50 0 Total 0.193 0.37 0.44 0.51 0.67 42.90 Sub-Basin 6 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.036 0.73 0.75 0.77 0.83 90 Pavement 0.006 0.89 0.90 0.92 0.96 100 Landscape 0.022 0.04 0.15 0.25 0.50 0 Total 0.064 0.50 0.55 0.61 0.73 60.00 Sub-Basin 7 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.070 0.73 0.75 0.77 0.83 90 Pavement 0.012 0.89 0.90 0.92 0.96 100 Landscape 0.062 0.04 0.15 0.25 0.50 0 Total 0.144 0.44 0.50 0.56 0.70 52.08 Sub-Basin 8 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.052 0.73 0.75 0.77 0.83 90 Pavement 0.034 0.89 0.90 0.92 0.96 100 Landscape 0.084 0.04 0.15 0.25 0.50 0 Total 0.170 0.42 0.48 0.54 0.69 47.53 Sub-Basin 9 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.046 0.73 0.75 0.77 0.83 90 Pavement 0.017 0.89 0.90 0.92 0.96 100 Landscape 0.053 0.04 0.15 0.25 0.50 0 Total 0.116 0.44 0.50 0.56 0.70 50.34 Sub-Basin 11 Surface Type Area C2 C5 C10 C100 % Imperv. Roof 0.000 0.73 0.75 0.77 0.83 90 Pavement 0.000 0.89 0.90 0.92 0.96 100 Landscape 0.640 0.04 0.15 0.25 0.50 0 Total 0.640 0.04 0.15 0.25 0.50 0.00 Prepared by:L.C.O.Date:10/14/20 Final Tc Remarks Basin Area C5 Length Slope Ti Length Slope Velocity Tt Comp Tc Tot. Length Tc =(L/180)+10 I.D.(ac)(ft)(%)(min)(ft)(%)(fps)(min)(min)(ft)(min)(min) 1 0.493 0.54 25 2.0%4.03 518 2.30%3.03 2.85 6.88 543 13.0 6.9 2 0.789 0.74 90 2.5%4.56 340 2.30%3.03 1.87 6.43 430 12.4 6.4 3 1.081 0.20 30 0.5%11.24 110 12.30%2.50 0.73 11.97 140 10.8 10.8 4 1.313 0.68 80 1.6%5.88 460 3.90%3.95 1.94 7.82 540 13.0 7.8 5 0.190 0.21 39 20.5%3.70 3 33.30%8.66 0.01 3.70 42 10.2 3.7 5 0.193 0.44 20 5.0%3.13 165 3.60%2.85 0.97 4.09 185 11.0 4.1 6 0.064 0.55 6 3.3%1.63 39 1.80%2.01 0.32 1.95 45 10.3 1.9 7 0.144 0.50 40 13.8%2.87 34 1.00%1.50 0.38 3.25 74 10.4 3.3 8 0.170 0.48 53 9.4%3.88 30 1.70%1.96 0.26 4.14 83 10.5 4.1 9 0.116 0.50 20 13.0%2.09 0.00 2.09 20 10.1 2.1 11 0.640 0.15 167 12.6%9.61 0.00 9.61 167 10.9 9.6 0 10.0 Total 5.193 Notes: 1. Channel flow velocity is a function of the channel slope and the channel conveyance factor (K). Vt = K(S^0.5). K = 15 for grassed waterways and 20 for shallow paved swales. 2. Flow velocity across a non-channelized surface is a function of the slope and the nature of the surface. In the case of sub-basins 3, 7, 8 and 9, where concentrated flow from a roof downspout is discharged onto a grassed slope, the distributed flow velocity is considered to range between 1.9 and 2.5 ft/sec. Ridgewood Hills - Tract "B" TIMES OF CONCENTRATION Sub-Basin Data Initial / Overland Time Channel Travel Time Tc Check Prepared by:L.C.O.Date:10/29/22 Basin Design Sub-Basin Runoff Time of C * A Rainfall Design Total Time Cumm.Rainfall Cumm.Design Pipe Pipe Pipe Length Velocity Time I.D.Point Area Coeffic Concentr.Intensity Runoff of Conc.C*A Intensity Runoff Flow Slope Size Capacity (ac)(min)(ac)(in/hr)(cfs)(min)(ac)(in/hr)(cfs)(cfs)(%)(in)(cfs)(ft)(ft/sec)(min) Developed Condition Upper LID System 1 1 0.493 0.48 6.9 0.24 2.60 0.62 6.9 0.24 2.60 0.62 2 2 0.789 0.71 6.4 0.56 2.65 1.49 6.4 0.56 2.65 1.49 1.49 2.92 12.00 7.93 63.3 11.51 0.09 1.49 7.53 12.00 12.73 111.8 17.68 0.11 3 3 1.081 0.09 10.8 0.10 2.21 0.22 10.8 0.66 2.20 1.46 1.46 1.22 15.00 9.29 109.7 4.94 0.37 1.46 1.22 15.00 9.29 161.2 4.94 0.54 1.46 Design 2-yr storm discharge from Upper LID system Lower LID System 4 4 1.313 0.64 7.8 0.84 2.49 2.08 7.8 0.84 2.49 2.08 2.08 5.00 12.00 10.38 19.3 5.17 0.06 5 2.08 5 6 0.193 0.37 4.1 0.07 2.85 0.21 4.1 0.07 2.85 0.21 0.21 1.15 12.00 4.98 43.5 2.37 0.31 6 7 0.064 0.50 1.9 0.03 2.85 0.09 4.4 0.10 2.85 0.30 0.30 4.37 12.00 9.70 98.5 4.28 0.38 7 8 0.144 0.44 3.3 0.06 2.85 0.18 3.3 0.06 2.85 0.18 0.18 1.00 12.00 4.64 10.5 2.07 0.08 9 4.8 0.17 2.85 0.48 0.48 2.50 12.00 7.34 156.2 3.82 0.68 8 10 0.170 0.42 4.1 0.07 2.85 0.20 4.1 0.07 2.85 0.20 0.20 1.00 12.00 4.64 12.0 2.18 0.09 11 5.5 0.24 2.78 0.67 0.67 6.03 12.00 11.39 31.5 5.80 0.09 9a 12 0.033 0.44 2.1 0.01 2.85 0.04 5.6 0.25 2.77 0.70 0.70 2.04 12.00 6.63 78.4 3.90 0.33 9b 13 0.083 0.44 2.1 0.04 2.85 0.10 5.9 0.29 2.72 0.79 0.79 13.83 12.00 17.26 47.0 8.20 0.10 14 7.9 1.13 2.48 2.80 2.80 9.19 12.00 14.07 25.1 6.69 0.06 10 15 0.190 0.11 3.7 0.02 2.85 0.06 2.80 Design 2-yr storm discharge from Lower LID system 11 16 0.640 0.04 9.6 0.03 2.31 0.06 0.06 Design 2-yr storm undetained discharge from the site. Ridgewood Hills - Tract "B" STORM DRAINAGE SYSTEM DESIGN (Rational Method Procedure) 2-YR STORM EVENT Direct Runoff Cummulative Runoff Pipe Flow Travel Time Prepared by:L.C.O.Date:10/29/22 Basin Design Sub-Basin Runoff Time of C * A Rainfall Design Total Time Cumm.Rainfall Cumm.Design Pipe Pipe Pipe Length Velocity Time I.D.Point Area Coeffic Concentr.Intensity Runoff of Conc.C*A Intensity Runoff Flow Slope Size Capacity (ac)(min)(ac)(in/hr)(cfs)(min)(ac)(in/hr)(cfs)(cfs)(%)(in)(cfs)(ft)(ft/sec)(min) Developed Condition Upper LID System 1 1 0.493 0.73 6.9 0.36 8.85 3.18 6.9 0.36 8.85 3.18 2 2 0.789 0.85 6.4 0.67 8.72 5.87 6.4 0.67 8.72 5.87 5.87 2.92 12.00 7.93 63.3 11.51 0.09 5.87 7.53 12.00 12.73 111.8 17.68 0.11 3 3 1.081 0.53 10.8 0.57 7.48 4.26 10.8 1.24 7.48 9.30 9.30 1.22 15.00 9.29 109.7 4.94 0.37 9.30 1.22 15.00 9.29 161.2 4.94 0.54 9.30 Maximum discharge from Upper LID system Lower LID System 4 4 1.313 0.81 7.8 1.07 8.21 8.77 7.8 1.07 8.21 8.77 8.77 5.00 12.00 10.38 16.5 5.17 0.05 5 8.77 0.00 5.00 12.00 10.38 22.8 5.17 0.07 5 6 0.193 0.67 4.1 0.13 9.95 1.28 4.1 0.13 9.95 1.28 1.28 1.15 12.00 4.98 43.5 2.37 0.31 6 7 0.064 0.73 1.9 0.05 9.95 0.47 4.4 0.18 9.95 1.75 1.75 4.37 12.00 9.70 98.5 4.28 0.38 7 8 0.144 0.70 3.3 0.10 9.95 1.00 3.3 0.10 9.95 1.00 1.00 1.00 12.00 4.64 10.5 2.07 0.08 9 4.8 0.28 9.95 2.75 2.75 2.50 12.00 7.34 156.2 3.82 0.68 8 10 0.170 0.69 4.1 0.12 9.95 1.17 4.1 0.12 9.95 1.17 1.17 1.00 12.00 4.64 12.0 2.18 0.09 11 5.5 0.39 9.63 3.80 3.80 6.03 12.00 11.39 31.5 5.80 0.09 9a 12 0.033 0.70 2.1 0.02 9.95 0.23 5.6 0.42 9.57 3.99 3.99 2.04 12.00 6.63 78.4 3.90 0.33 9b 13 0.083 0.70 2.1 0.06 9.95 0.58 5.9 0.48 9.37 4.46 4.46 13.83 12.00 17.26 47.0 8.20 0.10 14 7.9 1.54 8.19 12.65 12.65 9.19 12.00 14.07 25.1 6.69 0.06 10 15 0.190 0.54 3.7 0.10 9.95 1.01 12.65 Maximum discharge from Lower LID system 11 16 0.640 0.50 9.6 0.32 8.17 2.61 2.61 Maximum undetained discharge from the site. Ridgewood Hills - Tract "B" STORM DRAINAGE SYSTEM DESIGN (Rational Method Procedure) 100-YR STORM EVENT Direct Runoff Cummulative Runoff Travel TimePipe Flow Drainage Design Basin Basin No.Point Area 2-Year 100-Year 2-Year 100-Year (ac)(cfs)(cfs) 1 1 0.493 0.48 0.73 0.62 3.18 2 2 0.789 0.71 0.85 1.49 5.87 3 3 1.081 0.09 0.53 0.22 9.30 4 4 1.313 0.64 0.81 2.08 8.77 5 6 0.193 0.37 0.67 0.21 1.28 6 7 0.064 0.50 0.73 0.09 0.47 7 8 0.144 0.44 0.70 0.18 1.00 8 9 0.170 0.42 0.69 0.20 1.17 9 10, 11, 12, 13 0.116 0.44 0.70 0.14 0.81 10 5, 14 0.190 0.11 0.54 0.06 1.01 11 15 0.640 0.04 0.50 0.06 2.61 Ridgewood Hills - Tract B DRAINAGE DATA SUMMARY TABLE Design RunoffComp. Runoff Coeff. Rain Garden Analysis Worksheet - Sub-Basins 2 & 3 (Upper RG) 10-19-22.xlsm, RG 10/31/22, 11:19 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1.Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =40.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.407 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.15 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area =81,486 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.50 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =1,147 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2.Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =6.00 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =663 sq ft D) Actual Flat Surface Area AActual =2001 sq ft E) Area at Design Depth (Top Surface Area)ATop =2776 sq ft F) Rain Garden Total Volume VT=1,194 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3.Growing Media 4.Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =1.958 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =1,147 cu ft iii) Orifice Diameter, 3/8" Minimum DO =13/16 in Design Procedure Form: Rain Garden (RG) Larry Owen Owen Consulting Group, Inc. October 31, 2022 Ridgewood Hills Tract B (Drainage Sub-Basins 2 & 3) Fort Collins, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden Analysis Worksheet - Sub-Basins 2 & 3 (Upper RG) 10-19-22.xlsm, RG 10/31/22, 11:19 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5.Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6.Inlet / Outlet Control A) Inlet Control 7.Vegetation 8.Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Larry Owen Owen Consulting Group, Inc. October 31, 2022 Ridgewood Hills Tract B (Drainage Sub-Basins 2 & 3) Fort Collins, CO Temporaty irrigation will be provided until such time as the native grasses in the rain garden become established. Subsequent to vegetation establishment, the temporary irrigation improvements will be remove and reliance will be upon rainfall and snow events. Choose One Choose One Choose One Sheet Flow-No Energy Dissipation Required Concentrated Flow-Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Rain Garden Analysis Worksheet - Sub-Basins 4 - 10 (Lower RG) 10-19-22.xlsm, RG 10/31/22, 11:20 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1.Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =60.9 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.609 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.19 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area =95,040 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.50 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =1,763 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2.Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =9.00 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =1158 sq ft D) Actual Flat Surface Area AActual =2001 sq ft E) Area at Design Depth (Top Surface Area)ATop =2756 sq ft F) Rain Garden Total Volume VT=1,784 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3.Growing Media 4.Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =1.962 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =1,763 cu ft iii) Orifice Diameter, 3/8" Minimum DO =1 in Design Procedure Form: Rain Garden (RG) Larry Owen Owen Consulting Group, Inc. October 31, 2022 Ridgewood Hills Tract B (Drainage Sub-Basins 4 - 10) Fort Collins, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden Analysis Worksheet - Sub-Basins 4 - 10 (Lower RG) 10-19-22.xlsm, RG 10/31/22, 11:20 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5.Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6.Inlet / Outlet Control A) Inlet Control 7.Vegetation 8.Irrigation A) Will the rain garden be irrigated? Notes:Temporaty irrigation will be provided until such time as the native grasses in the rain garden become established. Subsequent to vegetation establishment, the temporary irrigation improvements will be remove and reliance will be upon rainfall and snow events. Design Procedure Form: Rain Garden (RG) Larry Owen Owen Consulting Group, Inc. October 31, 2022 Ridgewood Hills Tract B (Drainage Sub-Basins 4 - 10) Fort Collins, CO Choose One Choose One Choose One Sheet Flow-No Energy Dissipation Required Concentrated Flow-Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Gutter & Inlet Analysis.xlsm, Q-Allow 10/14/20, 12:31 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =13.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.028 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =19.5 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =19.3 19.3 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract B Gutter Analysis D/S of DP 1 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Gutter & Inlet Analysis 10-15-20.xlsm, Inlet On Grade 1/6/21, 10:32 AM Project: Inlet ID: Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =2 2 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =10.00 10.00 ft Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow'MINOR MAJOR Total Inlet Interception Capacity Q =0.6 3.2 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.0 cfs Capture Percentage = Qa/Qo =C% =100 100 % INLET ON A CONTINUOUS GRADE Ridgewood Hills Tract B Inlet Analysis at DP 1 CDOT Type R Curb Opening Gutter & Inlet Analysis.xlsm, Q-Allow 10/15/20, 10:23 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =4.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =24.0 ft Gutter Width W =1.50 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =24.0 24.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract B Gutter Analysis at DP 2 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Gutter & Inlet Analysis.xlsm, Inlet In Sump 10/15/20, 10:21 AM Project = Inlet ID = Design Information (Input)MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow')alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =2 2 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Warning 1 Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =9.00 9.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =11.2 11.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK)Q PEAK REQUIRED =1.4 6.3 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. INLET IN A SUMP OR SAG LOCATION Ridgewood Hills Tract B Inlet Analysis at DP 2 CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP Override Depths Gutter & Inlet Analysis.xlsm, Q-Allow 10/15/20, 10:27 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =4.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =16.7 ft Gutter Width W =1.50 ft Street Transverse Slope SX =0.030 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =16.7 16.7 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no)check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Ridgewood Hills Tract B Gutter Analysis at DP 4 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Gutter & Inlet Analysis.xlsm, Inlet In Sump 10/15/20, 10:29 AM Project = Inlet ID = Design Information (Input)MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow')alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =2 2 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Warning 1 Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =9.00 9.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =11.2 11.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK)Q PEAK REQUIRED =2.2 10.2 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. INLET IN A SUMP OR SAG LOCATION Ridgewood Hills Tract B Inlet Analysis at DP 4 CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP Override Depths DRAWINGS EXISTING INLET CORE SOUTH WALL OF INLET BOX TO ACCEPT PIPING FROM PROPOSED DEVELOPMENT PIPE ELEVATION AT ENTRANCE TO STORM INLET APPROXIMATELY 5070.69' TOT-LOT BUILDING B BUILDING C BUILDING D BUILDING E BUILDING F LOWER RAIN GARDEN 10' TYPE 'R' INLET INLET STRUCTURE MANHOLE LID-2 DAYLIGHT HDPE STORM DRAIN IN EROSION PROTECTED RUNDOWN TO RAIN GARDEN, (TYP) INLET INVERT ELEV. = 5081.1 TEE INVERT ELEV. = 5083.0 8.6 LF 12" HDPE N-12 STORM DRAIN @ 1.2% ± APPROX. CENTERLINE OF DRAINAGE SWALE @ 2.0% +/- SLOPE (TYP) 43.7 LF 12" HDPE N-12 STORM DRAIN @ 1.2% ± 98.1 LF 12" HDPE N-12 STORM DRAIN @ 4.4% ± TEE INVERT EL. = 5086.9 INLET INV. EL. = 5086.0 INLET INV. EL. = 5091.7 INLET INV. EL. = 5091.2 NYLOPLAST AREA INLET W/ 12" SQ. STD. GRATE (TYP) SEE DETAIL SHT. 12 10.6 LF 12" HDPE N-12 STORM DRAIN @ 1.0% ± INLET INV. EL. = 5087.0 156.5 LF HDPE N-12 STORM DRAIN @ 2.5% ± 12.0 LF 12" HDPE N-12 STORM DRAIN @ 0.8% +/- 31.4 LF 12" HDPE N-12 STORM DRAIN @ 6.1% +/- 123.5 LF 12" HDPE N-12 STORM DRAIN @ 6.5% +/- INLET INVERT ELEV. = 5092.2 40.5 LF HDPE N-12 STORM DRAIN @ 0.5% +/- INLET INVERT ELEV. = 5092.0 EXISTING 24" RCP EXISTING 36" RCP UPPER RAIN GARDEN DOG PARK SPORT COURT SHELTER FOREBAY OVERFLOW WEIR, 12" TALL, WITH 1" WIDE, FULL-DEPTH DRAINAGE SLOTS @ 1.5' +/- CENTERS. KEY WEIR INTO SIDE EMBANKMENTS. RAIN GARDEN CONCRETE FOREBAY WITH OVERFLOW WEIR, FOR DETAILS, SEE SHEET 13 FOREBAY OVERFLOW WEIR, 12" TALL, WITH 1" WIDE, FULL-DEPTH DRAINAGE SLOTS @ 1.5' +/- CENTERS. KEY WEIR INTO SIDE EMBANKMENTS. RAIN GARDEN CONCRETE FOREBAY WITH OVERFLOW WEIR, FOR DETAILS, SEE SHEET 13 LOWER RAIN GARDEN OUTLET CONTROL STRUCTURE. FOR DETAILS, SEE SHEET 13 INDICATED INVERT OF EXISTING INLET = 7070.69 TO BE CONFIRMED PRIOR TO COMMENCEMENT OF CONSTRUCTION. MANHOLE LID-1 INFLOW ENERGY DISSIPATION STRUCTURE - 1 LID SYSTEM PIPING (SEE PROFILE ON SEPARATE SHEET) BUILDING A 32.7 LF HDPE N-12 STORM DRAIN @ 1.2% ± INLET INV. EL. = 5086.5 TEE INV. EL. = 5086.4 106.1 LF 12" HDPE N-12 STORM DRAIN @ 4.7% +/- INLET INVERT ELEV. = 5083.1 INLET INVERT ELEV. = 5081.5 TEE INVERT ELEV. = 5081.0 24.6 LF HDPE N-12 STORM DRAIN @ 2.0% +/- OUTLET CONTROL STRUCTURE - 1 107.0 LF 12" HDPE N-12 STORM DRAIN @ 1.9% +/-50985099 5099 5098509750965095509450935092509150905089508850875086508550845083508250815089 5 0 8 3508850875086508550845093509250915090508950 9 3 509 4 509550995098 5097509650955100 510050 9 9 50 9 8 50 9 7 50 9 6 50 9 5 5097 5096 5095 5094 5093 509 4 509 3 5090 50955097 5095 5100 5088 5096 509450935092 509150945093 5092 5092 5091 5090 5089 5079 50785077 5076 5076 507750785078 5088 50805087 5086 5085 5084 5083 5082 5081 50805089509050885087 5086 5085 5084 5083 5082 5081 5080 5079 5078 5077 5076 5075 5074 5073 5072 5088 508750 8 7 5086 5085 5084 5083 5082 5081 5080 5079 5081 5080 5079 5078 5077 5076 5 0 7 5 507550765077509050895090 5095 5085 5080 5100 507550754" DIA. SLOTTED PVC SUB-DRAIN PIPES FOR DETAILS, SEE SHEET 13FLOW TO EX. POND 1EXISTING DETENTION POND 11b 1 2 5 15 6 12 1 2 4 5 6 9 11 0.493 0.48 0.789 0.71 1.313 0.64 0.193 0.37 0.064 0.50 0.116 0.44 0.640 0.04 11 14 8 0.170 0.42 10 0.190 0.11 13 4 10 8 9 7 7 0.144 0.44 3 1.081 0.09 3 5091 50915092 5092 4" DIA. SLOTTED PVC SUB-DRAIN PIPES FOR DETAILS, SEE SHEET 13 FFE 5100.30 FFE 5092.50 FFE 5095.50 FFE 5094.20 FFE 5089.00 FFE 5084.10 5100 5095 5090 5085 5080 Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked:NO DATE BY CHKREVISIONSDESCRIPTION123456Phone: (303) 913-5382larrycowen@comcast.netOWENCONSULTINGGROUP, INC.DRAWN BY: saraZ:\Shared\Projects\111 Owen Consulting\111-2001FC Ridgewood Hills North\AutoCAD\111-2001FC Ridgewood Hills Tract B MA - 02\DWG\FUP\05 DRAINAGE PLAN.dwgFILE LOCATION:5/31/2023 10:06 AMPLOT DATE:05 DRAINAGE PLAN10/28/20222ND RESUBMITTAL - NO CLUBHOUSEMARCH 25, 2021 RIDGEWOOD HILLS FIFTH FILING - MAFINAL UTILITY PLANSFORT COLLINS, COLORADO28505/30/20233RD RESUBMITTAL0 SCALE:1" = 30' 15' 30'60'90' NORTH NOTES 1. SEE SHEETS 12 - 13 FOR STORM DRAIN PLANS & PROFILES. LEGEND DRAINAGE BASIN I.D. DESIGN POINT OVERLAND FLOW DIRECTION # # 0.000.000 MINOR STORM RUNOFF COEFFICIENT DRAINAGE BASIN AREA (AC) Ridgewood Hills Fith Filing DRAINAGE DATA SUMMARY TABLE Drainage Design Basin Comp. Runoff Coeff.Design Runoff Basin No. Point Area 2-Year 100-Year 2-Year 100-Year (ac)(cfs)(cfs) 1 1 0.493 0.48 0.73 0.62 3.18 2 2 0.789 0.71 0.85 1.49 5.87 3 3 1.081 0.09 0.53 0.22 9.30 4 4 1.313 0.64 0.81 2.08 8.77 5 6 0.193 0.37 0.67 0.21 1.28 6 7 0.064 0.50 0.73 0.09 0.47 7 8 0.144 0.44 0.70 0.18 1.00 8 9 0.170 0.42 0.69 0.20 1.17 9 10, 11, 12, 13 0.116 0.44 0.70 0.14 0.81 10 5, 14 0.190 0.11 0.54 0.06 1.01 11 15 0.640 0.04 0.50 0.06 2.61 DRAINAGE BASIN 6112 E. Sienna Bouquet Pl.Cave Creek, AZ 85331