Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS AMENDMENT TRACT B - MA210028 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (3)Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked:NODATEBYCHKREVISIONSDESCRIPTION1234566614 E. Brilliant Sky, Dr.Scottsdale, AZ 85266Phone: (303) 913-5382larrycowen@comcast.netOWENCONSULTINGGROUP, INC.DRAWN BY: saraZ:\Shared\Projects\111 Owen Consulting\111-2001FC Ridgewood Hills North\AutoCAD\111-2001FC Ridgewood Hills Tract B MA - 02\DWG\FUP\01 TITLE SHEET.dwgFILE LOCATION:10/31/2022 10:24 AMPLOT DATE:01 TITLE SHEET10/28/20222ND RESUBMITTAL - NO CLUBHOUSE MARCH 25, 2021 RIDGEWOOD HILLS TRACT B - MAFINAL UTILITY PLANSFORT COLLINS, COLORADO 281 NORTH FINAL DEVELOPMENT PLAN VICINITY MAP SCALE: 1"=1000' RIDGEWOOD HILLS TRACT B - MALEGAL DESCRIPTION A PARCEL OF LAND LOCATED IN SECTION 14, T.6N., R.69W., OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO AND BEING PARTICULARLY DESCRIBED AS FOLLOWS: TRACT B OF RIDGEWOOD HILLS P.U.D., FOURTH FILING ACCORDING TO THE RECORDED PLAT THEREOF AS RECORDED BY THE LARIMER COUNTY CLERK AND RECORDER ON JANUARY 20, 2017 AT RECEPTION NO. 20170004364. . . . (WHICH ABOVE DESCRIBED TRACT CONTAINS 5.195 ACRES, MORE OR LESS) INDEX TO DRAWINGS MARCH 25, 2021 A PARCEL OF LAND SITUATED IN THE SOUTHEAST QUARTER OF SECTION 14, TOWNSHIP 6 NORTH, RANGE 69 WEST, OF THE 6TH PRINCIPLE MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. FINAL UTILITY PLANS FOR SUPPLEMENTAL GENERAL NOTES LEGEND ALL SANITARY SEWER LINE CONSTRUCTION SHALL CONFORM TO THE SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. ALL WATER LINE CONSTRUCTION SHALL CONFORM TO THE FORT COLLINS - LOVELAND WATER DISTRICT STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. REDUCED PRESSURE PRINCIPLE (RP) BACK-FLOW-PREVENTION-DEVICES TO BE INSTALL ON THE FIRE LINE RISER AND DOMESTIC WATER SERVICES. ALL SANITARY SEWER LINE CONSTRUCTION SHALL CONFORM TO THE SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. SEE SHEET 3 FOR THE LARIMER COUNTY URBAN AREA STREET STANDARDS STANDARD GENERAL NOTES AND STANDARD CONSTRUCTION NOTES. LIMITS OF STREET CUTS SHOWN ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. THE FORT COLLINS - LOVELAND WATER DISTRICT SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. THE PROPERTY OWNER WILL BE RESPONSIBLE FOR THE MAINTENANCE OF ALL ONSITE AND OFFSITE DRAINAGE FACILITIES ASSOCIATED WITH THIS PROJECT THAT ARE OUTSIDE THE PUBLIC RIGHT OF WAY. THIS INCLUDES ALL TRACTS AND PRIVATE DRIVES. A DRAINAGE AND EROSION CONTROL REPORT HAS BEEN PREPARED SPECIFICALLY FOR RIDGEWOOD HILLS. ALL RECOMMENDATIONS INCLUDED IN SAID REPORT SHALL BE CONSIDERED A PART OF THESE GENERAL NOTES AND SPECIFICATIONS AND SHALL BE FOLLOWED DURING CONSTRUCTION. ALL SITE WORK CONSTRUCTION MUST CONFORM TO ADA (AMERICAN DISABILITIES ACT) REQUIREMENTS FOR HANDICAP ACCESS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. CONTRACTOR AND ALL SUBCONTRACTORS TO THOROUGHLY FAMILIARIZE THEMSELVES WITH THESE DOCUMENTS. ALL STORM DRAIN PIPES SHALL BE CLASS III REINFORCED CONCRETE PIPE (RCP) WITH R4 JOINTS MEETING THE REQUIREMENTS OF ASTM STANDARD SPECIFICATION C443, LATEST VERSION, UNLESS OTHERWISE SPECIFIED. PROPOSED STORM DRAIN WITH MANHOLE PROPOSED STORM INLET PROPOSED SANITARY SEWER WITH MANHOLE PROPOSED WATERLINE WITH VALVE & FIRE HYDRANT PROPOSED WATERLINE TAP METER PROPOSED FIRELINE TAP PROPOSED IRRIGATION LINE WITH METER PROPOSED ELECTRIC LINE PROPOSED GAS LINE EXISTING SANITARY SEWER EXISTING WATERLINE EXISTING STORM DRAIN PIPE ROAD OR DRIVE AISLE CENTERLINE BUILDING SETBACK LINE EASEMENT LINE BOUNDARY LINE PROPOSED CONTOUR PROPOSED INDEX CONTOUR PROJECT DATUM PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM) BENCHMARK #1: East side of South College Ave. at Rob’t Benson Lake, on top of the S.E. corner of an inlet. ELEVATION: 5019.54 ft. BENCHMARK #2: Azimuth mark (31⁄4” aluminum cap) on the north side of Trilby Rd., 1⁄2 mile west of College Ave., at the southwest corner of 508 W. Trilby. Also, 5.5 ft. west of power pole and 24.5 ft. south of wood fence. ELEVATION: 5090.58 ft. NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED + 3.18 ft. All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT SURVEYOR: ENGINEER: PLANNER: OWNER/APPLICANT: APPROVED: City Engineer,Approved Sheets Date APPROVED: Water & Wastewater Utility,Approved Sheets Date APPROVED: Stormwater Utility,Approved Sheets Date APPROVED: Park Planning and Development,Approved Sheets Date APPROVED: Traffic Operations,Approved Sheets Date APPROVED: Environmental Planner,Approved Sheets Date Does not match the required format. See written comments. 11/29/2022 Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked:NODATEBYCHKREVISIONSDESCRIPTION1234566614 E. Brilliant Sky, Dr.Scottsdale, AZ 85266Phone: (303) 913-5382larrycowen@comcast.netOWENCONSULTINGGROUP, INC.DRAWN BY: saraZ:\Shared\Projects\111 Owen Consulting\111-2001FC Ridgewood Hills North\AutoCAD\111-2001FC Ridgewood Hills Tract B MA - 02\DWG\FUP\03 GENERAL NOTES.dwgFILE LOCATION:10/31/2022 10:24 AMPLOT DATE:03 GENERAL NOTES10/28/20222ND RESUBMITTAL - NO CLUBHOUSEMARCH 25, 2021 RIDGEWOOD HILLS TRACT B - MAFINAL UTILITY PLANSFORT COLLINS, COLORADO 283 GENERAL NOTES AS ADOPTED FROM LARIMER COUNTY URBAN AREA STREET STANDARDS APPENDIX E 1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE CITY OF FORT COLLINS. 2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE CITY OF FORT COLLINS ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE CITY OF FORT COLLINS PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE CITY OF FORT COLLINS, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE CITY OF FORT COLLINS ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE CITY OF FORT COLLINS, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5. ALL SANITARY SEWER AND WATER LINE CONSTRUCTION AND ALL POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE CITY OF FORT COLLINS ENGINEER. 6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7. THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH/IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE CITY OF FORT COLLINS PRIOR TO BEGINNING CONSTRUCTION. 10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE CITY OF FORT COLLINS, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. 18. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE CITY OF FORT COLLINS FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY,"FINAL EROSION CONTROL STUDY FOR "ASPEN HEIGHTS" BY OWEN CONSULTING GROUP INC., SHALL BE FOLLOWED AND IMPLEMENTED. 20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE CITY OF FORT COLLINS STREET INSPECTOR. 22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE CITY OF FORT COLLINS ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEERS ABSENCE. HOWEVER, THE CITY OF FORT COLLINS RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE CITY OF FORT COLLINS'S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE CITY OF FORT COLLINS ENGINEER APPROVES THE FINAL REPORT. 25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE CITY OF FORT COLLINS INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE CITY OF FORT COLLINS THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE CITY OF FORT COLLINS BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE CITY OF FORT COLLINS FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (CITY OF FORT COLLINS, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT CITY OF FORT COLLINS TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE CITY OF FORT COLLINS ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE CITY OF FORT COLLINS. 35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE CITY OF FORT COLLINS ENGINEER IMMEDIATELY. 39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE CITY OF FORT COLLINS'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE CITY OF FORT COLLINS ENGINEER. 40. PROJECT BENCHMARKS:ELEVATIONS ARE BASED ON THE CITY OF FORT COLLINS BENCHMARK NO. 42-97, WITH A PUBLISHED ELEVATION OF 4966.75 AND CITY OF FORT COLLINS BENCHMARK NO. 1-00, ELEVATION OF 4965.57 (NGVD 1929 UNADJUSTED). 41. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS EXCEPT AT FLOWLINE PROFILES OR UNLESS OTHERWISE NOTED. 42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE ORIGINAL STREET CONDITION SHALL BE DOCUMENTED BY THE CITY OF FORT COLLINS CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE CITY OF FORT COLLINS TRAFFIC ENGINEER AND/OR THE CITY OF FORT COLLINS INSPECTOR AT THE TIME THE CUTS ARE MADE. 44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS. 46. AFTER ACCEPTANCE BY THE CITY OF FORT COLLINS, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: 48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: NONE See Sheet 1. 11/29/2022 SAW CUT AND REPLACE EXISTING PAVEMENT IN CROSS-HATCHED AREA 509850995099 50985097509650955094509350925091509050895088508750865085508450835082508150755074507350835082508150805079507850775076 507 7 5083 50885087508650855084509350925091509050895093 50945095 509950985097509650955100 51005099 5098 5097 5096 5095 5097 5096 5095 509450955097 5096 5095 5 0 9 2 5093 50945095 50955096 5097 5098 50995100 EAST PROPERTY LINEDRIVE AISLE CENTERLINE PROFILE EXISTING GROUND PROFILE ALONG DRIVE AISLE CENTERLINE 7' SIDEWALK 17' PARKING 26' DRIVE AISLE 13' TRAVEL LANE 13' TRAVEL LANE 5' GARAGE APRON 3' CONCRETE VALLEY PANVERTICAL CURB W/ 18" GUTTER, (TYP) EMERGENCY ACCESS CENTERLINE PROFILE EXISTING GROUND PROFILE ALONG EMERGENCY ACCESS CENTERLINE VPI STA. 1+67.37 VPI ELV.=5083.96 BVC 1+42.375085.21-5.0 %5084.171+82.371.0%5084.451+62.375084.771+52.375084.251+72.37EVC 1+92.375084.2150' VERTICAL CURVE Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked:NODATEBYCHKREVISIONSDESCRIPTION1234566614 E. Brilliant Sky, Dr.Scottsdale, AZ 85266Phone: (303) 913-5382larrycowen@comcast.netOWENCONSULTINGGROUP, INC.DRAWN BY: saraZ:\Shared\Projects\111 Owen Consulting\111-2001FC Ridgewood Hills North\AutoCAD\111-2001FC Ridgewood Hills Tract B MA - 02\DWG\FUP\14 WEST ACCESS DRIVE - PLAN and PROFILE.dwgFILE LOCATION:10/31/2022 11:59 AMPLOT DATE:14 WEST ACCESS DRIVE - PLAN AND PROFILE10/28/20222ND RESUBMITTAL - NO CLUBHOUSE MARCH 25, 2021 RIDGEWOOD HILLS TRACT B - MAFINAL UTILITY PLANSFORT COLLINS, COLORADO 0 SCALE:1" = 40' 20'40'80'120' 2814 SEE PLAN NORTH HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 4' WEST ACCESS DRIVE ROAD PROFILE WEST ACCESS DRIVE ROAD PLAN TYPICAL INTERIOR DRIVE AISLE SECTION W/ GARAGE N.T.S. EMERGENCY ACCESS ROAD PROFILE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 4' 11/29/2022 **All circled are line over text.** 1 4 BASIN SIDE SLOPE (TYP) 1 4 TYPICAL CROSS-SECTION THROUGH RAIN GARDEN DESIGN WATER QUALITY CAPTURE VOLUME (WQCV) WATER SURFACE ELEVATION FLOOR OF RAIN GARDEN (FLAT) BOTTOM OF GROWTH MEDIUM / TOP OF FILTER AGGREGATE FOR MATERIAL SPECIFICATIONS FOR GROWTH MEDIUM AND AGGREGATE FILTER GRAVEL, SEE TABLE BELOW. 4" DIA. SLOTTED PVC UNDERDRAIN FOR SPECIFICATIONS, SEE SHT. ???18"6"5.0' (TYPICAL ALL SIDES)6"(TYP)EXCESS RUNOFF OUTLET PIPE (SIZE VARIES, SEE TABLE THIS SHEET) A REINFORCED CONCRETE OUTLET CONTROL STRUCTURE #5 REBAR @ 1.0' O/C E/W (TYPICAL ALL WALLS) 4" SUB-DRAIN DISCHARGE PIPE A 6" CLR1 4 EXCESS RUNOFF OUTLET PIPE SUB-DRAIN ORIFICE PLATE 8"4" DIA. SLOTTED PVC SUB-DRAIN PIPE DRAINAGE FILTER LAYER GROWTH MEDIUM LAYER FLOOR OF RAIN GARDEN WATER QUALITY CAPTURE VOLUME WATER SURFACE (SEE TABLE FOR ELEV.) 4 1 RIP RAP ENERGY DISSIPATION MEDIA D50 SIZE = 4" VARIES (1.0' MAX.) REINFORCED CONCRETE FOREBAY PAN #5 REBAR @ 12" O/C E/W 12"6"FLOOR OF RAIN GARDEN GROWTH MEDIA LAYER DRAINAGE FILTER LAYER1.5' ±1" WIDE x FULL DEPTH DRAINAGE SLOTS IN FOREBAY OVERFLOW WEIR Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked:NODATEBYCHKREVISIONSDESCRIPTION1234566614 E. Brilliant Sky, Dr.Scottsdale, AZ 85266Phone: (303) 913-5382larrycowen@comcast.netOWENCONSULTINGGROUP, INC.DRAWN BY: saraZ:\Shared\Projects\111 Owen Consulting\111-2001FC Ridgewood Hills North\AutoCAD\111-2001FC Ridgewood Hills Tract B MA - 02\DWG\FUP\28 LID - DETAILS AND CROSS-SECTIONS.dwgFILE LOCATION:10/31/2022 10:31 AMPLOT DATE:28 LID - DETAILS AND CROSS-SECTIONS10/28/20222ND RESUBMITTAL - NO CLUBHOUSEMARCH 25, 2021 RIDGEWOOD HILLS TRACT B - MAFINAL UTILITY PLANSFORT COLLINS, COLORADO 2828 DETAIL - RAIN GARDEN FOREBAY DETAIL - RAIN GARDEN OUTLET CONTROL STRUCTURE (PLAN) DETAIL - RAIN GARDEN OUTLET CONTROL STRUCTURE (SECTION) BIORETENTION GROWTH MEDIA SPECIFICATIONS Particle Size Distibution 80-90% sand (0.05 - 2.0 mm dia.) 3-17% silt (0.002 - 0.5 mm dia.) 3-17% clay (<0.002 mm dia.) Chemical Attribute and Nutrient Analysis pH 6.8 - 7.5 Organic matter <15% Nitrogen <15ppm Phosophorus <15ppm Salinity <6 mmh os/cm Bioretention Organics 3 to 5% shredded mulch (by weight of growing mdia) UNDERDRAIN AGGREGATE SPECIFICATIONS CDOT Filter Material (Class B or C) Mass % Passing Square Mesh Sieve Sieve Size Class B Class C 1.5" (37.5 mm)100 0.75" (19.0 mm)100 No. 4 (4.75 mm)20-60 60-100 No. 16 (1.18 mm)10-30 No. 50 (300 um)0-10 10-30 No. 100 (150 um)0-10 No. 200 (75 um)0-3 0-3 SUB-DRAIN PIPE SPECIFICATIONS Pipe Diameter and Type:4-inch Slotted PVC Maximum Slot Width:0.032 inch Minimum Open Area (per foot):1.90 sq. in. RAIN GARDEN COMPONENT ELEVATIONS/THICKNESSES Upper Rain Garden Lower Rain Garden Rain Garden floor Elevation:5076.00 ft 5075.00 ft WQCV Water Surface / Overflow Weir Sill Elev.:5075.50 ft 5075.75 ft Outlet Control Structure Invert Elevation:5074.00 ft 5073.00 ft Growth Media Layer Thickness:18 in 18 in Drainage Fliter Layer Thickness:6 in 6 in Underdrain Outlet Orfice Diameter:13/16 in 1 in 11/29/2022 Mask Text