Dear Eldon:
For your information, attached is a copy of the Staff's comments concerning
Restaurant and Retail Pad Sites at Harmony Market P.U.D., presented before the
Conceptual Review Team on June 13, 1994.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
1 /
Ted Shepard, AICP'�
Senior Planner
TS/gid
Attachments
cc: Bob Blanchard, Chief Planner
Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: June 13, 1994
ITEM: Restaurant and Retail Pad Sites at Harmony
Market P.U.D.
APPLICANT: G.T. Land Colorado, Inc. c/o Eldon Ward,
Cityscape Urban Design, 3555 Stanford Road,
Suite 105, Fort Collins, CO. 80525.
LAND USE DATA: Three pad sites for Golden Corral Restaurant,
(8,000 square feet standard restaurant just east of the right-
in/right-out), Outback Steakhouse (5,000 square feet standard
restaurant just west of the right-in/right-out), and Lees
Cyclery/Outpost/Sunsport (14,000 square feet retail just west of
First Bank). Pad sites are located in Harmony Market Shopping
Center, along Harmony Road.
COMMENTS:
1. The City's Light and Power Department has existing conduit at
Boardwalk to serve Red Robin which can be extended east to
serve the remaining pads. Please coordinate transformer
locations. Charges for streetlighting along Harmony will not
apply as they have already been paid by previous development.
As you are aware, transformers must be screened from public
view yet be within ten fee of hard surface, from one side, for
emergency change out, if necessary. Please contact Doug
Martine, 221-6700, for further information.
2. Both water and sewer mains are available to serve the pad
sites. The water main is in the access drive and Sewer would
have to be extended from the right-in/right-out access drive.
A grease trap would have to be required for the restaurants.
Please contact Roger Buffington, 221-6681, for further
information.
3. Since the restaurants will. be over 5,000 square feet, they
must be equipped with an approved, commercial, automatic fire
extinguishing system. Fire sprinkler lines must be shown on
the Utility Plans.
4. The restaurants must make separate applications to the County
Health Department. .
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221fi750
PLANNING DEPARTMENT
5. Handicap parking must be provided in accordance with both the
Zoning Code and the U.B.C. as amended by the City of Fort
Collins. For further information on handicap parking or
accessibility issues, please contact Sharon Getz, Plans
Examiner, 221-6760.
6.. Please contact Dan Coldiron, 221-6760, for estimates of
signage allowance for each pad site. Please note that the pad
sites do not have frontage on Harmony Road.
7. The pad sites are located in the McClleland-Mail Creek
drainage basin. The Storm Drainage Fee in this basin is
$3,717 per acre, subject to the amount of onsite detention and
the runoff coefficient. Development of the pad sites must
Conform to the overall drainage plan for Harmony Market and
Oak -Cottonwood Farm. This plan specifies detention pond
release rates and pipe sizes. Please note that there have
been many changes to the overall drainage plan since first
implemented. It is suggested that one Drainage Report and
Drainage and. Grading Plan be done for all the remaining pads.
An Erosion Control Plan is required for each pad. For further
information, please contact Glen Schlueter, 221-6589.
8. An updated traffic study should be provided for all the
remaining pad sites. This study should amend the trip
generation rates based on the identified users. The new trip
generation numbers will be forwarded to C.D.O.T. for their
use. This study may not have to be at the same scope as the
original but must address the new users.
9. The traffic study should investigate the need for double left
turns for northbound Boardwalk to westbound Harmony. This
intersection seems to be congested, especially during the
Saturday noon peak. Please investigate storage capacity for
this double left turn so they are no conflicts with the left -
in to the center off Boardwalk.
10. The traffic study for Red Robin indicated that there may be
potential to .improve the internal access drive intersection
just east of Boardwalk. The traffic study for the pad sites
should also investigate operation in this area. Development
of the pad sites may be an excellent opportunity to improve
the intersection, if necessary. For further information
regarding the scope of the traffic study, please call Tom
Vosburg, 221-6608.
11. Utility Plans and Development Agreement will be required for
each pad site. Depending on the need for public improvements,
each pad site may not necessarily need a Development
Agreement.
12. The Street Oversizing Fee for retail and restuara_nts is
$14,005 per acre, pro -rated based on actual platted area.
13. Sidewalk connections out to the perimeter sidewalk along
Harmony should be provided.
14. Each new building must provide bike racks. Racks should be
permanently anchored to concrete and not interfere with