HomeMy WebLinkAboutBOHLENDER FUNERAL CHAPEL - FDP230011 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONSFIRST FLOOR
EL. = 100' - 0"
SECOND FLOOR
EL. = 112' - 0"
PARAPET
EL. = 126' - 0"
EXPOSED CONCRETE FOUNDATIONEXPOSED CONCRETE FOUNDATION
PIN MOUNTED
ADDRESS NUMBERS
1'-0"NEW BUILDING SIGNAGE
(~36.5 S.F.)
NEW VENT STACK
(BEYOND)
(E) BERM
12.5'28.0'
SIDEWALK
5.0' (E)5.5'72 .1°DANFIELD
CT.
FIRST FLOOR
EL. = 100' - 0"
SECOND FLOOR
EL. = 112' - 0"
PARAPET
EL. = 126' - 0"2'-8"NEW VENT STACKS;
PAINTED TO MATCH
EXISTING MECHANICAL
SCREEN BEYOND
EXPOSED CONC. FOUNDATION
(EXISTING BERM)
'BLACKOUT' WINDOW
FILM
72.1°5.5'SIDEWALK
4.5' (E)71.5'
EASTBROOK
DRIVE
A01
BUILDING ELEVATIONS
3/16" = 1'-0"
WEST ELEVATION
3/16" = 1'-0"
SOUTH ELEVATION
FIRST FLOOR
EL. = 100' - 0"
SECOND FLOOR
EL. = 112' - 0"
PARAPET
EL. = 126' - 0"B.O. CANOPY10.5'FOR NEW DOORS
MODIFIED STOREFRONT
21.5' - CANOPY STRUCTURE
(EXISTING BERM)(EXISTING BERM)
8' x 8' GARAGE
DOOR IN LIEU OF
8' DOUBLE DOORS
NEW VENT STACK
(BEYOND)
EXPOSED CONCRETE FOUNDATION
8" DIA. PIPE PAINTED TO
MATCH THE DARK BRONZE
STOREFRONT FRAMES
12" TUBE STEEL FRAME CANOPY ROOF STRUCTURE
W/ METAL DECK AND ROOFING MEMBRANE ON TOP
UNDER SIDE WOULD BE EXPOSED 12X6 TUBE STEEL
ALL PAINTED TO MATCH THE DARK BRONZE
STOREFRONT FRAMES
CANOPY FOUNDATIONS
2'-4 23/64"
FIRST FLOOR
EL. = 100' - 0"
SECOND FLOOR
EL. = 112' - 0"
PARAPET
EL. = 126' - 0"
WITH STOREFRONT GLAZING
REPLACE (E) VENT
(EXISTING BERM)10.5'CANOPY STRUCTURE
19.0'
NEW VENT STACKS
(BEYOND)
8" DIA. PIPE PAINTED TO
MATCH THE DARK BRONZE
STOREFRONT FRAMES
12" TUBE STEEL FRAME CANOPY ROOF STRUCTURE
W/ METAL DECK AND ROOFING MEMBRANE ON TOP
UNDER SIDE WOULD BE EXPOSED 12X6 TUBE STEEL
ALL PAINTED TO MATCH THE DARK BRONZE
STOREFRONT FRAMES
CANOPY FOUNDATIONSPROPERTY LINE7
2.1°5'-6"A02
BUILDING ELEVATIONS
3/16" = 1'-0"
EAST ELEVATION
3/16" = 1'-0"
NORTH ELEVATION
A03
BUILDING PERSPECTIVES
PERSPECTIVE
PERSPECTIVE (EXISTING)