HomeMy WebLinkAboutHEARTSIDE HILL RESIDENTIAL DEVELOPMENT - FDP230007 - DOCUMENT MARKUPS - ROUND 2 - EROSION CONTROL LETTER/REPORT
EROSION CONTROL REPORT
FOR
Heartside Hill
Prepared by:
Highland Development Services
6355 Fairgrounds Ave, Suite 100
Windsor, Colorado 80550
Phone: 970.674.7550
Prepared for:
CARE Housing, Inc.
1303 W. Swallow Road
Fort Collins, CO 80525
Office: 970.282.7522
February 22, 2023
Job Number 21-1045-00
6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550
February 14, 2023
Mr. Matt Simpson, P.E.
City of Fort Collins Utilities – Stormwater Department
700 Wood Street
Fort Collins, CO 80522
RE: Erosion Control Report/Stormwater Management Plan for Heartside HIll
Fort Collins Stormwater Department,
We are pleased to submit for your review, this Erosion Control Report/Stormwater
Management Plan for the Heartside Hill subdivision. This report provides the City with an
erosion control plan for the proposed development that addresses the topics outlined in the
City Erosion Control Report Requirements. This plan mimics the State of Colorado General
Permit and Stormwater Management Plan requirements.
I appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Sincerely,
Highland Development Services
Zach Wiele
Page i
TABLE OF CONTENTS
Table of Contents ............................................................................................................................. i
General Description and Location .................................................................................................. 1
Site Description and Location ...................................................................................................... 1
Site Soils ....................................................................................................................................... 1
BMPs for Stormwater Pollution Prevention ................................................................................... 5
Erosion and Sediment Controls ................................................................................................... 5
Materials Handling and Spill Prevention ..................................................................................... 7
Stormwater Management Controls ................................................................................................ 9
Identification of Potential Pollution Sources ............................................................................... 9
Final Stabilization and Long-term Stormwater Management ...................................................... 11
Inspection and Maintenance ........................................................................................................ 12
SWMP Implementation................................................................................................................. 13
Appendix ....................................................................................................................................... 14
Appendix A – BMP Details ........................................................................................................... A
Appendix B – Vicinity Map and Drainage & Erosion Control Plans ............................................. B
Appendix C – Construction Sequence ......................................................................................... C
Appendix D – Erosion Control Escrow Calculation ...................................................................... D
Appendix E – Soil Information ..................................................................................................... E
Appendix F – City of Fort Collins Standard Erosion Control Notes...............................................F
Page 1
GENERAL DESCRIPTION AND LOCATION
SITE DESCRIPTION AND LOCATION
The project site is situated in the southeast quarter of Section 12, Township 6 North, Range 69
West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, in the State of
Colorado. The property consists of Lots 1 and 2, Block 1 of the Heart of the Rockies Second
Subdivision, dated June 9, 1999. Heartside Hill is located within Lot 2, at the northwest corner
of the intersection of S. Lemay Ave. and E. Trilby Rd. Lot 1 contains the existing Heart of the
Rockies Christian Church. It is bounded by private residential lots to the north and west, E.
Trilby Rd. to the south, and S Lemay Ave to the east.
The existing church facilities are anticipated to remain. The site area is currently undeveloped
and is approximately 8.84 acres. The development would consist of up to 72 CARE Housing for
rent apartment units ([6] 12-unit buildings), 9 Habitat for Humanity (H4H) single-family
detached lots, 2 L’arche group homes, and a planned shared community center to be designed
and constructed at a future date. The project is anticipated to be completed in a single phase.
The project site generally slopes from the southwest to the northeast at approximately 4%
toward an existing pond at the northeast of the property. Storm runoff is currently conveyed
from a grate inlet in the pond to a ditch along the east side of the property and into the existing
storm drain sewer. The existing project site is approximately 0.0% impervious. No wetlands are
located within the area of proposed development.
The project site is not located within the FEMA floodway or floodplain and is within the non-
printed FEMA FIRM panel 08069C1200F, effective 12/19/2006. The site is also not located
within the City of Fort Collins floodplain.
The proposed development includes six multi-family buildings with a clubhouse along with
eleven low-income housing lots. The required parking areas, driveways, sidewalks, and open
space are also included in the development. A rain garden is proposed to provide the
stormwater quality enhancement requirement as a low impact development technique.
SITE SOILS
The Heartside Hill project site consists primarily of Renohill clay loam and a small portion of
Longmont clay and are both classified as Type D hydrologic group. According to USDA/Natural
Resource Conservation Group, Type D soils have a very slow infiltration rate when thoroughly
wet. These soils consist chiefly of clays that have a high shrink-swell potential, soils that have a
high-water table, soils that have a claypan or clay layer at or near the surface, and soils that are
2
shallow over nearly impervious material. These soils also have a very slow rate of water
transmission.
Per the “Preliminary Geotechnical Subsurface Exploration Report, Proposed Residential
Development Lots 1 and 2, Heart of the Rockies Second Subdivision”, prepared by Soilogic, Inc.
dated August 13, 2021:
“The subsurface materials encountered in the completed site borings were quite variable across
the site, but generally consisted of a thin mantle of vegetation and topsoil underlain by
brown/beige/rust lean clay with varying amounts of sand. A portion of the near-surface lean
clay encountered at the location of boring B-2 extending to a depth of about 3 to 4 feet below
ground surface was somewhat mottled in color, appeared to contain bedrock fragments and
was identified as possible existing fill material which may have been placed to develop present
site grade. In general, the lean clay varied from medium stiff to very stiff in terms of consistency,
exhibited variable swell potential (ranging from none to very high) at current moisture and
density conditions and extended to depths between 2½ to 18 feet below present site grade,
where it was underlain by brown/olive/beige/gray/rust interbedded claystone/siltstone/
sandstone bedrock of varying composition. The bedrock varied from weathered to very hard in
terms of hardness, also exhibited variable swell potential (ranging from low to high) at in-situ
moisture and density conditions and extended to the bottom of each boring at depths ranging
from approximately 15 to 30 feet below present site grades. In general, we judge the bedrock
unit underlying the site to possess moderate to high swell potential overall.”
Groundwater was also observed during the subsurface soil exploration:
“Groundwater was measured in borings B-1, B-2, B-3 and B-6 at depths between about 13 and
27 feet below ground surface, but was not encountered in any of the remaining site borings to
the depths explored when checked immediately after completion of drilling. When checked
seven (7) days after drilling, groundwater was measured in all borings with the exception of
boring B-3 at depths between about 5 and 15 feet below ground surface. The ground surface in
the area of boring B-3 had been disturbed, such that subsequent groundwater level
measurements could not be completed.”
SOIL TYPE PERCENT OF
SITE
HYDROLOGIC
SOIL GROUP1
K
FACTOR2
WIND
GROUP3
Loveland clay, 0-3% slopes 6.2% D 0.24 4
Renohill clay loam, 3-9% slopes 93.8% D 0.24 6
3
1Hydrologic soil groups range from A to D with group A having a high infiltration rate and D having a very
slow infiltration rate
2K factors range from 0.02 to 0.69. The higher value, the more susceptible the soil is to sheet and rill
erosion by water.
3Soils assigned to wind group 1 are the most susceptible to wind erosion, soils assigned to wind group 8
are the least susceptible.
Overall, the soils on site can be classified as moderately erodible and thus the project must
implement an adequate erosion control strategy to control sediment migration from leaving
the site. Please refer to Appendix E for the detailed on-site soil information from the NRCS Soil
Survey of Larimer County.
The anticipated sequence of construction shall progress as follows:
1) Installation of perimeter and offsite erosion control measures (mainly outlet
protection at the detention pond outlet structures). Other measures as required
for erosion control will be constructed throughout the project.
2) Clearing, stripping, stockpiling, and grading
3) Utility installation
4) Sub-grade preparation for the parking areas, drives and sidewalks
5) Curb, gutter, and sidewalks
6) Paving
7) Building construction (this may occur simultaneously with items 5 through 7)
8) Final grading and landscaping. All disturbed ground will be impervious (concrete,
asphalt, or building), seeded and mulched, sodded or xeriscaped to permanently
stabilize the site.
The run-off coefficients associated with this project for onsite sub-basins are as follows:
TRIBUTARY
SUB-BASIN
AREA
(acres)
RUNOFF
COEFFIECENT
C2 C100
OS1 2.033 0.72 0.89
D1 3.744 0.52 0.65
D2 4.646 0.53 0.66
Total 10.422 0.56 0.70
4
No outside sources of pollution currently exist on this site. Potential pollutant sources brought
onto the site during construction will be discussed (along with spill prevention) below. The
anticipated non-stormwater components of discharge with this project are landscape irrigation
return flows. Runoff from the site will flow toward Rain Garden D1 into detention Pond D via
swales, inlets, and storm sewer pipes. Stormwater detention and water quality enhancement
are achieved through the use of detention Pond D and Rain Garden D1.
Four-Phase Erosion and Sediment Control Plan
The proposed plans include a 4-phase Erosion and Sediment Control Plan that has been
developed in accordance with State recommendations. The plan outlines the installation and
phasing of erosion and pollution control BMPs during construction, and the permanent BMPs to
remain. The 4-phase plan is a set of snapshots in time, that show the following phases:
Phase 1, Grading Phase – BMPs for perimeter controls prior to clearing and grading
Phase 2, Infrastructure Phase – BMPs for utility, paving, curb and gutter during all
phases of construction (temporary construction BMPs)
Phase 3, Vertical Construction Phase – BMPs for individual lot construction
Phase 4, Post construction and final stabilization (permanent BMPs and permanent
stormwater quality BMPs)
5
BMPS FOR STORMWATER POLLUTION PREVENTION
EROSION AND SEDIMENT CONTROLS
STRUCTURAL PRACTICES: Structural practices for the site will consist mainly of vehicle tracking
pads, concrete washout areas, temporary sediment basins, inlet protection, culvert protection,
silt fencing, and rock socks which are described in detail in the following paragraphs. Detail
drawings of these BMPs are also included in Appendix A. These BMPs are expected to change
as the construction progresses and it is the responsibility of the contractor to ensure
appropriate BMPs are in place and/or removed at the appropriate time in the construction
sequence. All temporary and permanent erosion and sediment control practices must be
maintained and repaired as needed to assure continued performance of their intended
function. All BMPs shall be inspected and repaired or replaced as described further in this
report and as required to satisfy the conditions of the Permit.
The Heartside Hill project is anticipated to be constructed in 4 phases, with all grading and
utility installation (water/sewer/storm) occurring during Phase 1. The existing church modular
removal and NW rain garden outfall modification will occur with Phase 4. Phases may be
combined sequentially as necessary.
Refer to Erosion & Sedimentation Control Plans for detailed BMP sequencing and maintenance
plans for the project through all stages of construction.
Soil stockpiles should be kept below the locally mandated maximum height and surrounded
with silt fencing or other acceptable means. If the storage of these soils is going to be for an
extended period of time, then consider temporarily seeding the soil to minimize soil loss to
wind and water erosion. Per the City of Fort Collins Stormwater Criteria Manual:
No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected
from sediment transport through the use of surface roughening, watering, and down
gradient perimeter controls. All soil stockpiles shall be protected from sediment
transport by wind in accordance with Municipal Code §12-150. All stockpiles shall be
flattened to meet grade or removed from site as soon as practical, and no later than the
completion of construction activities or abandonment of the project. All off-site stockpile
storage locations in City limits shall have a stockpile permit from the City Engineering
Department prior to using the area to store material. If frequent access from hardscape
to the stockpile is needed a structural tracking Control Measure shall be implemented.
6
Vehicle tracking pads are intended to trap mud and sediment within coarse grain material and
provide clean access to public roadways. Wherever construction vehicle access routes intersect
paved public roads a vehicle tracking control pad shall be installed to minimize the transport of
sediment (mud) by runoff or vehicles tracking onto the paved surface. Pads shall be maintained
and refurbished when necessary to obtain their intended result.
Concrete washout area is intended to contain washout liquids and solids that result from the
cleaning of concrete trucks and pumps. Washouts should be placed near the area where the
concrete is being poured and 50 ft from any stormwater or drainage course.
Two bioretention ponds, Rain Garden D1 and Rain Garden OS1, will be utilized on this site for
LID treatment. Rain gardens are to be installed at the conclusion of construction activities and
concurrent with landscape installation. Necessary erosion control protection will be placed to
minimize risk of native soils migrating to the rain garden growing media. The rain garden
grading may be utilized as a sediment trap prior to the installation of the drainage course and
growing media.
Inlet protection, silt fencing, and rock socks prevent sediment from entering storm drainage
systems prior to permanent stabilization of the disturbed site area via ponding and settling of
sediment. Rock socks or gravel bags shall be placed at existing and proposed inlets on and near
the site as inlet protection. Inlet protection must be inspected and maintained after every
rainfall event that produces runoff. Sediment must be removed and rocks replaced. Silt
fencing and rock socks will also be used as perimeter protection at the toe of slopes and
landscaped areas. Silt fencing and rock socks shall be installed immediately upon completion of
over-lot grading.
NON-STRUCTURAL PRACTICES: All low sloped areas exposed during land disturbing activity
(stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened
condition by ripping or disking along land contours until mulch, vegetation or other permanent
erosion control is installed.
All steep sloped areas exposed during land disturbing activity (stripping, grading, utility
installations, stockpiling, filling, etc.) shall have slope protection. The contractor shall use a
"tracked" vehicle, run perpendicular to slope so that the tracking runs on the contour to inhibit
rill/gully erosion; the contractor may use other windrow-type methods as necessary.
No soil shall remain exposed by land disturbing activity for more than thirty (30) days. At that
7
time temporary or permanent erosion control seed/mulch, landscaping, etc. is required.
Additional Non-Structural Practices are strongly encouraged such as minimizing the disturbance
of soils and vegetation, providing educational materials on disposal /recycling, spill prevention /
clean up, identification and elimination of illicit discharges, promotion of street sweeping and
the development of public education programs.
THE CONTRACTOR SHALL ADD ANY AND ALL BMP’S AND DETAILS NEEDED FOR
SEDIMENT/EROSION CONTROL.
MATERIALS HANDLING AND SPILL PREVENTION
Potential impacts from significant materials and their handling are as follows:
Chemicals, cleaning substances, and petroleum products related to the construction will be
stored within the construction trailer or storage shed where it will not be in contact with
precipitation. No storage of these materials will be allowed outside.
Fueling and maintenance of equipment shall take place at the construction staging area.
Fueling will be accomplished with fueling trucks on an as needed basis. Absorbent (kitty litter)
will be in the construction trailer and applied on any spill immediately and the dry material
disposed of properly and legally.
All construction waste shall be disposed of in the available dumpsters throughout the workday.
Liquid wastes will be hauled off site and disposed of properly and legally.
Any cleaning or maintenance of small equipment will be required to be done within a
containment device (horse trough or small “kiddy pool”) and the liquid disposed of properly
and legally.
In the event of any spill, the SWMP Administrator shall be immediately notified.
Spills can be broken into three categories. Their definitions and the procedures required to
address the spills are as follow:
MINOR SPILL – A spill generally of less than 5 gallons which is unlikely to reach adjacent waters
(i.e. equipment leak).
Procedure:
a. Stop the source of the spill.
b. Contain the spillage.
c. Contact the SWMP Administrator.
d. Clean up the spill with on-site absorbent material (kitty litter)
8
e. Dispose of the dry material properly or legally.
f. Document the spill and the response in the SWMP including dates and times –
verify that the pollutants are completely cleaned up.
g. Include incident in the following training meeting.
h. Provide information to the City of Fort Collins at the next regular inspection.
SIGNIFICANT SPILL – A spill of pollutants or oils of any size that will likely or has reached
adjacent waters, may endanger health or the environment, or which may exceed a water
quality standard.
Procedure:
a. Stop the source of the spill.
b. Contain the spillage.
c. Contact the SWMP Administrator.
d. Clean up the spill with on-site absorbent material (kitty litter)
e. Dispose of the dry material properly or legally.
f. Document the spill and the response in the SWMP – verify that the pollutants
are completely cleaned up.
g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of
Public Health and Environment spill reporting line (877) 518-5608 of the spill.
h. Notify the same two entities above with a written submission (outlined within
the permit) within 5 calendar days.
i. Include incident in the following training meeting.
HAZARDOUS SPILL – A spill of a dangerous substance requiring expert cleanup.
Procedure:
a. Secure the area – do not approach the spill.
b. Offer first aid to any injured parties.
c. Call 911 and describe the nature of the spill and any injuries.
d. If possible, isolate downstream areas from the spill (for example, cover an inlet
that is downstream and a safe distance from the spill with plastic and soil).
e. Contact the SWMP Administrator.
f. Document the spill and the response in the SWMP
g. Notify the City of Fort Collins (970) 221-6700 and the Colorado Department of
Public Health and Environment spill reporting line (877) 518-5608 of the spill.
h. Notify the same two entities above with a written submission (outlined within
the permit) within 5 calendar days.
i. Include incident in the following training meeting.
9
STORMWATER MANAGEMENT CONTROLS
IDENTIFICATION OF POTENTIAL POLLUTION SOURCES
The permit identifies 13 potential sources that must be evaluated for their potential to
contribute pollutants to stormwater discharge. These items have been evaluated below for this
project:
1. Disturbed and stored soil – YES – The construction will require that areas be
disturbed exposing soil including foundation construction, paving and repaving,
slope construction, and utility installation, and demolition required as shown on
the plans. BMPs will include silt fence and sediment control logs and inlet
protection on existing and proposed inlets, minimizing disturbance of existing
vegetation and hard surfaces, and slope roughening and tracking of slopes after
disturbance and prior to landscaping, paving, or building will be implemented.
2. Vehicle tracking of sediment – YES – The construction will require that subgrade
be prepared for pavement and that vehicles drive on unpaved surfaces to the
proposed buildings and utility improvement locations. BMPs will include a policy
that vehicles be clean prior to entering the site and, if they become muddy
during construction or earthwork activities, mud is removed by hand from the
vehicle prior to departing the site in an area near the vehicle tracking pad. Any
soil that is tracked from the site is to be disposed of in the trash dumpster by
sweeping or scraping the material off the street. Any muddy vehicle will use the
vehicle tracking pad prior to leaving the site.
3. Management of contaminated soil – NO – To our knowledge, there is not any
existing soil contamination on-site.
4. Loading and unloading operations – YES – Chemicals and petroleum products
will be brought to the site. Anytime these are being transported, they will be in
a sealed container.
5. Outdoor storage activities – YES – Inert materials such as wood and stone will be
stored outside and will likely be covered with tarps or plastic but are not
pollutant sources and are not covered by the permit. Chemicals and petroleum
products will be stored within the construction trailer or storage shed. Cement
and mortar bags (if not contained in a vehicle or storage shed) will be completely
covered with plastic to avoid contact with precipitation.
6. Vehicle and equipment maintenance and fueling – YES – Vehicle maintenance
and fueling, associated with construction of the proposed improvements, will
take place. No fuel will be stored on site.
7. Significant dust or particulate generating processes – YES – Most of the site will
be exposed from the over-lot grading of the project. In order to control the dust
or particulate generating process a water truck or similar watering device will be
available at all times. The disturbed ground will be watered as needed to control
10
dust from leaving the site. The area of heavy construction is very limited and
none of the operations are expected to generate significant dust. All dust
control measures shall be completed in reference to the City’s Fugitive Dust
Ordinance (Ordinance No. 044, 2016) and Dust Prevention and Control Manual.
8. Routine maintenance activities involving fertilizers, pesticides, detergents, fuels,
solvents, oils, etc. – YES – Fertilizers and pesticides will not be used. Any
cleaning or maintenance of small equipment will be required to be done within a
containment device (horse trough or small “kiddy pool” and the liquid disposed
of properly and legally.
9. On-site waste management – YES – The building and site construction will result
in construction waste. A dumpster for trash and a dumpster for bulk recycling
will be on the site. Waste will be hauled to the dumpsters by hand or in loaders.
Dumpsters will be hauled off as needed. No construction waste will be left
outside overnight without being located in a dumpster. No construction debris
(including broken concrete) may be buried on the site.
10. Concrete truck/equipment washing – YES – A concrete washout will be provided
on site. This will be used for trucks and for any masonry / concrete tools.
11. Dedicated asphalt of concrete batch plants – NO – None on this project.
12. Non-structural waste sources such as worker trash and portable toilets – YES –
Trash dumpster will be available for worker’s trash and will be located near the
construction trailer and emptied weekly. Portable toilets will be staked on site
near the construction trailer.
13. Other areas where potential spills can occur – NO – The above 12 items are
adequate for the anticipated construction process.
THE CONTRACTOR IS TO UPDATE THE ABOVE INFORMATION WITH EXACT LOCATIONS OF THE
CONSTRUCTION TRAILER, VEHICLE TRACKING PAD, CONCRETE WASHOUT, DUMPSTERS, AND PORTABLE
TOILETS PRIOR TO COMMENCEMENT OF CONSTRUCTION AND UPDATE AS NECESSARY THROUGHOUT
THE CONSTRUCTION SEQUENCE.
11
FINAL STABILIZATION AND LONG-TERM STORMWATER
MANAGEMENT
Final stabilization shall be considered achieved once all proposed site improvements are in
place, all vegetation is established as identified on the landscape plan, all temporary BMPs are
removed, and the downstream conveyances are inspected and certified to be clean and free
from any construction debris resulting from the construction. Areas controlled by grass sod will
be considered established upon the completion of the sod installation. Areas of seeding will be
considered established at a vegetative density of 70%.
Permanent Stormwater BMPs
Grassed Swale with Permanent Turf Reinforcement Mat:
A permanent grassed swale along the east of the site will treat basin B5.1 to reduce pollutant
loading and runoff through infiltration. The swale is proposed to have Rollmax™ C350 Turf
Reinforcement Mat (TRM) installed as a permanent BMP. The swale requires routine
maintenance (mowing, turf maintenance, sediment and trash removal, etc.). The swale should
be inspected at least twice yearly and immediately after major storm events for erosion,
sediment build-up, vegetation health, etc.
Permanent Riprap Outlet Protection:
Permanent riprap protection has been proposed at the exit of all culvert pipes. The intent of the
riprap aprons is to resist erosive forces from stormwater exiting the culverts. The riprap aprons
require routine maintenance (sediment and trash removal, riprap required replacement etc.).
The riprap aprons should be inspected at least twice yearly and immediately after major storm
events for erosion, sediment build-up, rip-rap integrity, etc.
12
INSPECTION AND MAINTENANCE
Site inspections will be performed to effectively address maintenance, repair, and adequacy of
BMPs. The site inspections will be performed by the SWMP Administrator or his designee a
minimum of once every fourteen (14) calendar days on active construction sites and within 24
hours after a significant storm event (event causing erosion). As part of the site inspections the
inspector will keep documentation of all inspections and BMP maintenance, including updated
Site Maps indicating new BMPs or the removal of BMPs since the previous inspection. Blank
Site Maps will be utilized and will be redlined by the SWMP Administrator throughout
construction to note all BMPs, pollutant sources, storage locations, etc.
Any maintenance, repair, or necessary installation of BMPs that are noted during the inspection
must begin immediately. The modifications shall be noted in the SWMP and the action taken as
a result of the inspection shall be noted and certified on or attached to the original inspection
report (date and time that the repair or change was started and finished and a certification that
it was done properly).
13
SWMP IMPLEMENTATION
It is the responsibility of the contractor to operate and maintain all facilities and systems of
treatment and control which are installed to achieve compliance with the conditions of the
permit. This includes effective performance, adequate funding, adequate staffing and training,
etc. (see permit).
All personnel on the construction site who will be in a position to affect or be affected by the
SWMP shall be trained prior to beginning work. These individuals will be given general
orientation information regarding the project and SWMP, shown where the SWMP is physically
located, the SWMP will be explained to them and available for their review, and the
enforcement policy will be reviewed. Throughout the construction, as a part of a weekly safety
meeting, the SWMP will be reviewed with all attendees and any incidents discussed. All
attendees shall be logged.
15
APPENDIX
Appendix A – BMP Details
Appendix B – Vicinity Map, Phasing Plan, and Drainage & Erosion Control Plans
Appendix C – Construction Sequence
Appendix D – Erosion Control Escrow Calculation
Appendix E – Soil Information
Appendix F – City of Fort Collins Standard Erosion Control Notes
Appendix A
APPENDIX A – BMP DETAILS
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION CONTROL DETAILS2/22/23
NA
N/A
ZMW
JTC
21-1045-00
C4.00
18 24
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION CONTROL DETAILS2/22/23
NA
N/A
ZMW
JTC
21-1045-00
C4.01
19 24
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
Appendix B
APPENDIX B – VICINITY MAP AND DRAINAGE & EROSION CONTROL PLANS
SITE
Vicinity Map
Scale: 1" = 1000'
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #24-94
ON THE NORTHEAST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND PORTNER DRIVE, ON TOP OF THE WEST END
OF A CONCRETE HEADWALL
ELEV= 4960.69
CITY OF FORT COLLINS BENCHMARK #25-94
ON THE NORTHWEST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND SOUTH LEMAY AVENUE, ON TOP OF THE
SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE
ELEV= 4913.16
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4960.69 (NAVD88 DATUM) - 3.19'
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4913.16 (NAVD88 DATUM) - 3.19'
E TRILBY RDS LEMAY AVEBRIT
T
A
N
Y
S
T
AUTUMN RIDGE DRBRITTANY DRHEARTSIDE HILL
TRILBY ROAD
BRI
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETBRITTANY KNOLLS
BRITTANY KNOLLS
PARAGON POINTBLOCK 1
LOT 1
LOT 2
LOT 3
LOT 4
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLOCK 2
BLOCK 3
LOT 1
TRACT A
(DRAINAGE &
PRIVATE ACCESS
EASEMENT)
BLDG 1
BLDG 2 BLDG 3
BLDG 4
BLDG 5 BLDG 6
DETENTION POND D
100 YR PEAK INFLOW = 44.16 CFS
100 YR RELEASE RATE = 13.2 CFS
100-YR VOLUME = 0.90 AC-FT
100-YR WSE = 4911.03 FT
WQCV (40-HR) = 0.08 AC-FT
WQCV WSE = 4908.86 FT
(STANDARD WQ - AREA NOT
TREATED BY LID)
RAIN GARDEN D1
WQCV (12-HR) = 2,914 CU-FT
RAIN GARDEN OS1
WQCV (12-HR) = 1,845 CU-FT
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLDRAINAGE PLAN2/22/23
1" = 40'
N/A
JTC
JTC
21-1045-00
C2.00
7 24
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
N
W E
S
0
SCALE: 1" = 40'
80402040
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN FLOW PATH
NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY
EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT
CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT
ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION
AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN
PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED
GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE
OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION
BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE
EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY
SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM
WATERWAY POLLUTION.
3.LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL
BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS
NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL
DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED,
SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL
AND SOIL MIGRATION.
4.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND
SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION
COMMENCEMENT.
5.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND
DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND
NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND
MULCHED PER LCUASS STANDARDS.
6.ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES
OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO
ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE
RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE
SOIL.
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)
(Remove)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 1 - GRADING2/22/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.01
8 24
0
40'
80402040
SCALE: 1" =
N
W E
S
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL
MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION
SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION
PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER
POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED
TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR
THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED
CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH,
VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN
AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND
DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED
TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH,
LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE
STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND
DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST
IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING
DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED
AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT
AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR
INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED
ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND
LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES
SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING,
WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER
30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS
OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY
INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE
CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL
MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION
CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE
CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE
UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY
VEGETATED WITH APPROVAL FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND
THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY
SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL
MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED
AND/OR NOT DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE
TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL
BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS
SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY
THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY
DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT
LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION
SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION
RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING
SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE
THE SOIL.
PHASE 1 - GRADING PHASE NOTES
1.THIS PLAN IS A LIVING DOCUMENT THAT MAY CHANGE AS WORK PROGRESSES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING THESE EROSION CONTROL
PLANS AS NEEDED DURING CONSTRUCTION ACTIVITIES TO REFLECT ACTUAL BMPS
USED ONSITE, REASONS FOR CHANGES AND ANY DISTURBED AREAS.
2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO
INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION AND
TEMPORARY SEEDING.
3.THE CONTRACTOR MAY USE SUCH BMPS AS SILT FENCE OR COMPACTED EARTH
BERM AS FORMAL CONSTRUCTION MARKER PERIMETER CONTROL AS APPROVED BY
THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.ALL ONSITE AND OFFSITE DRAINAGE PATTERNS ARE TO BE VERIFIED IN THE FIELD.
PROVIDE ALL NECESSARY BMPS TO PROTECT IMMEDIATE DOWNSTREAM INLETS,
CULVERTS, DRAINAGE WAYS, ETC.
5.OFFSITE INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET
PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH
CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
6.ALL PERIMETER CONTROL BMPS SHALL INSTALLED IN PHASE 1. CONTRACTOR SHALL
NOT PROCEED WITH CONSTRUCTION ACTIVITIES UNTIL ALL PHASE 1 BMPS ARE
INSTALLED, INSPECTED, AND APPROVED BY THE CITY OF FORT COLLINS EROSION
CONTROL INSPECTOR.
7.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD
AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE
CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER
MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE
CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
CONSTRUCTION FENCE
CULVERT PROTECTION
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)
(Remove)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 2 - INFRASTRUCTURE2/22/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.02
9 24
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING
ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION
CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS
UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL
REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL
(E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL
LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN
FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE
INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH
RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL
STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE
ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE
REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF
SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE.
ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY
THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE
CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT
SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT
DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT
DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST
EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY
ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE
FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
PHASE 2 - INFRASTRUCTURE PHASE NOTES
1.CONTRACTOR SHALL GRADE AND INSTALL SEDIMENT BASINS BEFORE PROCEEDING
WITH ANY PHASE 2 INFRASTRUCTURE CONSTRUCTION ACTIVITIES.
2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO
INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION, TEMPORARY
SEEDING AND MULCHING.
3.ONSITE & OFFSITE INLET PROTECTIONS SHALL BE COMPLETED PROTECTED BY CURB
INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN
CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY
THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
4.INFILTRATION GALLERIES TO BE CONSTRUCTED CONCURRENT WITH STORM SYSTEM
INFRASTRUCTURE. CONSTRUCT TEMPORARY SEDIMENT BASIN AROUND OUTLET
STRUCTURE. SEDIMENT SHALL BE REMOVED FROM INFILTRATION GALLERY ONCE SITE IS
STABILIZED.
5.RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES
AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION
CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN
GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A
SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND
GROWING MEDIA.
6.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD
AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE
CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER
MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE
BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 3 - VERTICAL CONSTRUCTION2/22/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.03
10 24
PHASE 3 - VERTICAL CONSTRUCTION PHASE NOTES
1.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL
BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT
LIMITED TO INLET PROTECTION, SEDIMENT BASINS, PROTECTION, AND
TEMPORARY SEEDING.
2.ANY COMMISSIONED STORM SEWER SYSTEM SHALL INLET AND OUTLET
PROTECTION INSTALLED FOR ALL PHASE 3 OPERATIONS.
3.INLET PROTECTION SHALL BE COMPLETED BY CURB INLET OR DROP INLET
PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH
CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF
FORT COLLINS EROSION CONTROL INSPECTOR.
4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF
PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION.
5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED
LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS EROSION
CONTROL INSPECTOR.
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING
ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION
CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS
UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL
REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL
(E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL
LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN
FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE
INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH
RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL
STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE
ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE
REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF
SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE.
ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY
THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE
CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT
SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT
DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT
DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST
EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY
ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE
FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
TRILBY ROAD
BR
I
T
T
A
N
Y
S
T
R
E
E
T
LEMAY AVENUEBRITTANY STREETAPPROX LIMIT OF
DISTURBANCE (TYP)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)
(Remove)REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLEROSION & SEDIMENT CONTROL PLANPHASE 4 - PERMANENT BMP & FINAL STABILIZATION2/22/23
1" = 40'
N/A
ZMW
JTC
21-1045-00
C2.04
11 24
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES
1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE
NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING
ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION
CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING,
UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A
ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS
UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL
REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL
(E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE
APPROVED BY THE STORMWATER DEPARTMENT.
5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL
LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN
FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY
ENGINEERING DEPARTMENT.
6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE
INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH
RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS,
PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGEWAY.
7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL
STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE
ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE
REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED.
8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF
SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE.
ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY
THE CONTRACTOR.
EROSION CONTROL NOTES
1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION
CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION.
PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS
DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL
PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE
AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL
FOR REMOVAL.
2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND
ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE
CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL
MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND
PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT
SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT
DEPICTED ON THIS PLAN.
3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT
DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST
EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY
COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY
ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE
ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL
MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING,
INCLUDING BUT NOT LIMITED TO SLOPED AREAS.
5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY
CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING
CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE
CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS.
7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER
EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE
FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION
CONTROL BLANKETS TO STABILIZE THE SOIL.
PHASE 4 - PERMANENT BMP AND FINAL STABILIZATION NOTES
1.LOTS AND BLOCKS ANTICIPATING CONSTRUCTION MAY UTILIZE SLOPE PROTECTION IN
LIEU OF TEMPORARY SEEDING AND MULCHING AS APPROVED BY THE CITY OF FORT
COLLINS EROSION CONTROL INSPECTOR.
2.INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION
WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM
OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION
CONTROL INSPECTOR.
3.CONTRACTOR SHALL REMOVE ALL TEMPORARY BMPS PRIOR TO FINAL
DEMOBILIZATION OR AS DIRECTED BY THE CITY OF FORT COLLINS EROSION CONTROL
INSPECTOR.
4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF
PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION.
5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING
AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR.
6.CONTRACTOR TO INSTALL PROPOSED PERMANENT OUTLET PROTECTION WHEN
FINALIZING STORM SEWER CONSTRUCTION WHICH MAY HAVE OCCURRED IN EARLIER
PHASES.
7.CONTRACTOR TO CLEAN AND LEGALLY DISPOSE OF ALL SEDIMENT COLLECTED ONSITE
DURING CONSTRUCTION PRIOR TO FINAL ACCEPTANCE.
DRAINAGE FLOW ARROW
LEGEND
EX MAJOR CONTOUR
EX MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION ENTRANCE W/
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
SILT FENCE
INLET PROTECTION
OUTLET STRUCTURE PROTECTION
ROCK SOCKS
SEDIMENT CONTROL LOGS
TEMPORARY SEDIMENT BASIN
SURFACE ROUGHENING
STABILIZED STAGING AREA
TURF REINFORCEMENT MAT
PERMANENT RIPRAP APRON
LIMITS OF DISTURBANCE (APPROX)
CONSTRUCTION FENCE
CULVERT PROTECTION
0
40'
80402040
SCALE: 1" =
N
W E
S
Appendix C
APPENDIX C – CONSTRUCTION SEQUENCE
(Construction Phases)Mobilization Demolition Grading
Utilities
Installation
Flat work
Installation
Vertical
Installation Landscape Demobilization
Best Management Practices (BMPs)
Structural "Installation"
Silt Fence Barriers*
Contour Furrows (Ripping / Disking)
Sediment Trap / Filter*
Vehicle Tracking Pad*
Flow Barriers
Inlet protection*Any prior inlets that could use protecting
Rock Bags*Any prior inlets that could use protecting
Terracing
Rip Rap
Collecting Asphalt / Concrete Saw Cutting Waste
*All BMPs to be Removed once Construction is Complete,
with the exception of silt fencing, which shall remain in
place until seeded areas are established.
Vegetative
Temporary Seeding Planting Any time the site will sit dorment longer than 30 Days.
Mulching/Sealant Any time the site will sit dorment longer than 30 Days.
Permanent Seeding Planting
Sod Installation
Rolled Products : Netting/Blankets/Mats Any time the site will sit dorment longer than 30 Days.
Appendix D
APPENDIX D – EROSION CONTROL ESCROW CALCULATION
8/28/2019
Project:Disturbed Acres:51.20
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F. 2144 $2.50 $5,360.00
each 16 $150.00 $2,400.00
each 3 $500.00 $1,500.00
each 11 $300.00 $3,300.00
each 2 $800.00 $1,600.00
LS 1 $7,500.00 $7,500.00
Sub-Total: $21,660.00
1.5 x Sub-Total: $32,490.00
Amount of security: $32,490.00
AC 8.427 $2,000.00 $16,854.00
Sub-Total: $16,854.00
1.5 x Sub-Total: $25,281.00
Amount to Re-seed: $25,281.00
Minimum escrow amount: $3,000.00
Erosion Control Escrow:$32,490.00
Miniumum Escrow Amount
Northfield Subdivision - PHASE 1
Seeding
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or
three thousand dollars ($3,000) for commercial development”
Rock Sock
Vehicle Tracking Control Pad
Final Escrow Amount (Maximum between BMP, Reseeding and Minimum Escrow)
Outlet Protection
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
BMP Amount
Silt Fence
Inlet Protection
Street Sweeping and Cleaning
Reseeding Amount
2/22/2023 10:51 AM G:\Projects\21-1045-00 HRCC\03 Design Documents\Drainage\EC Report\HRCC Erosion Control Escrow.xls
Appendix E
APPENDIX E – SOIL INFORMATION
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 1 of 444826504482690448273044827704482810448285044828904482650448269044827304482770448281044828504482890494720494760494800494840494880494920494960495000495040495080495120
494720 494760 494800 494840 494880 494920 494960 495000 495040 495080 495120
40° 29' 48'' N 105° 3' 44'' W40° 29' 48'' N105° 3' 27'' W40° 29' 39'' N
105° 3' 44'' W40° 29' 39'' N
105° 3' 27'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 25 50 100 150
Meters
Map Scale: 1:1,880 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
63 Longmont clay, 0 to 3
percent slopes
D 0.8 6.2%
90 Renohill clay loam, 3 to
9 percent slopes
D 12.8 93.8%
Totals for Area of Interest 13.6 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 3 of 4
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 4 of 4
K Factor, Whole Soil—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 1 of 344826504482690448273044827704482810448285044828904482650448269044827304482770448281044828504482890494720494760494800494840494880494920494960495000495040495080495120
494720 494760 494800 494840 494880 494920 494960 495000 495040 495080 495120
40° 29' 48'' N 105° 3' 44'' W40° 29' 48'' N105° 3' 27'' W40° 29' 39'' N
105° 3' 44'' W40° 29' 39'' N
105° 3' 27'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 25 50 100 150
Meters
Map Scale: 1:1,880 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Soil Rating Lines
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Soil Rating Points
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data
as of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
K Factor, Whole Soil—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 2 of 3
K Factor, Whole Soil
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
63 Longmont clay, 0 to 3
percent slopes
.24 0.8 6.2%
90 Renohill clay loam, 3 to
9 percent slopes
.24 12.8 93.8%
Totals for Area of Interest 13.6 100.0%
Description
Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by
water. Factor K is one of six factors used in the Universal Soil Loss Equation
(USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the
average annual rate of soil loss by sheet and rill erosion in tons per acre per
year. The estimates are based primarily on percentage of silt, sand, and organic
matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of
K range from 0.02 to 0.69. Other factors being equal, the higher the value, the
more susceptible the soil is to sheet and rill erosion by water.
"Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The
estimates are modified by the presence of rock fragments.
Factor K does not apply to organic horizons and is not reported for those layers.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable)
K Factor, Whole Soil—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 3 of 3
Wind Erodibility Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 1 of 344826504482690448273044827704482810448285044828904482650448269044827304482770448281044828504482890494720494760494800494840494880494920494960495000495040495080495120
494720 494760 494800 494840 494880 494920 494960 495000 495040 495080 495120
40° 29' 48'' N 105° 3' 44'' W40° 29' 48'' N105° 3' 27'' W40° 29' 39'' N
105° 3' 44'' W40° 29' 39'' N
105° 3' 27'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 25 50 100 150
Meters
Map Scale: 1:1,880 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
1
2
3
4
4L
5
6
7
8
Not rated or not available
Soil Rating Lines
1
2
3
4
4L
5
6
7
8
Not rated or not available
Soil Rating Points
1
2
3
4
4L
5
6
7
8
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Wind Erodibility Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 2 of 3
Wind Erodibility Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
63 Longmont clay, 0 to 3
percent slopes
4 0.8 6.2%
90 Renohill clay loam, 3 to
9 percent slopes
6 12.8 93.8%
Totals for Area of Interest 13.6 100.0%
Description
A wind erodibility group (WEG) consists of soils that have similar properties
affecting their susceptibility to wind erosion in cultivated areas. The soils
assigned to group 1 are the most susceptible to wind erosion, and those
assigned to group 8 are the least susceptible.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Lower
Wind Erodibility Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/21/2021
Page 3 of 3
Appendix F
APPENDIX F – CITY OF FORT COLLINS STANDARD EROSION CONTROL NOTES
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
before you dig.CallKnow what's below.
R
1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA
STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST
RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER
THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK,
FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE
PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND
EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND
SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER.
6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO
VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE
FOR UNKNOWN UNDERGROUND UTILITIES.
7.THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING,
TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE
REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL
EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS
REQUIRED.
9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE
DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION.
10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND
WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL
AS THE UTILITY COMPANIES.
11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A
MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO
COMMENCEMENT OF ANY WORK.
12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE
CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY.
14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER,
CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY
CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN.
16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL
BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17.PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE
STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY
FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY
BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM
GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN
ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR HEARTSIDE HILL BY HIGHLAND DEVELOPMENT SERVICES SHALL BE FOLLOWED
AND IMPLEMENTED.
20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD
REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING.
21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24
HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF
APPLICABLE.
23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY
THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO
THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF
CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE
IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO
THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL
REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS
SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED
TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE
LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.
25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS,
INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO
THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT
WILL BE ALLOWED ON THE STREETS.
26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF
THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO
REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS.
27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE
DISTRICTS.
28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD
AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING
A PERMIT.
30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA
PUBLICATION 2226, EXCAVATING AND TRENCHING.
31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE),
FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL
DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES.
32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT,
WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE
CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET
OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR
HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED
TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE.
36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND
ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF
ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER
SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S
INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40.PROJECT BENCHMARKS:
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #24-94
ON THE NORTHEAST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND PORTNER DRIVE, ON TOP OF THE WEST END OF A CONCRETE HEADWALL
ELEV= 4960.69
CITY OF FORT COLLINS BENCHMARK #25-94
ON THE NORTHEWEST CORNER OF THE INTERSECTION OF EAST TRILBY ROAD AND SOUTH LEMAY AVENUE, ON TOP OF THE SOUTHEAST EDGE OF THE CONCRETE RING TO AN ELECTRIC MANHOLE
ELEV= 4913.16
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM
(PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,THE FOLLOWING EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4960.69 (NAVD88 DATUM) - 3.19
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4913.16 (NAVD88 DATUM) - 3.19
HORIZONTAL DATUM: COLORADO STATE PLAN COORDINATES NAD 83(2007) DATUM. HORIZONTAL CONTROL BASED VRS.
41.ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED.
42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND
IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS
OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE
DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS.
THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE
CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE
LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE
GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS.
46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM
PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE
FOLLOWING PRIVATE STREETS: NO PRIVATE STREET PROPOSED.
48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: N/A
CITY OF FORT COLLINS CONSTRUCTION NOTES
A.STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
GENERAL EROSION CONTROL REQUIREMENTS
THESE NOTES ARE A SUMMARY FOR THE LEGAL REQUIREMENTS, THAT ARE SET FORTH IN THE FORT COLLINS STORMWATER CRITERIA MANUAL (FCSCM), AND THAT ANY CONFLICT IS RESOLVED BY THE
MORE STRINGENT REQUIREMENT CONTROLLING.
1.THE PROPERTY OWNER, OWNER'S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER
REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO
IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE
PROJECT SITE AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE
USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT.
2.THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT,
THE EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT.
3.THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE
CONSTRUCTION SITE.
4.THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW
ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM
SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT
DEMOLITION, CLEARING, GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES
COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS.
5.THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT
LIMITED TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR
REPLACEMENT IN THE COURSE OF CONSTRUCTION.
6.AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY
REMOVED IN ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH
THIS PROJECT.
7.ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING.
8.AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT
IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF
CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER
SHALL INSURE THAT ALL EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE
SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY.
9.ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE
EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE, AND
FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL
OF THESE AFOREMENTIONED LAWS AND REGULATIONS.
10.THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER
ACT, ARMY CORPS OF ENGINEERS' 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE
AVAILABLE UPON REQUEST BY THE CITY.
11.THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF
THE CONTROL MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES.
12.THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE
CONDITIONS AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY
EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS.
13.ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL.
14.THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY.
15.AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES,
A VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL.
16.INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN
24 HOURS FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR.
17.ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO
ANY DRAINAGE WAY.
18.ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE
ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE
SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC.
19.ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND
ACCEPTANCE BY THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES' DETAILS SHALL BE SUBMITTED, REVIEWED
AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND
HYDROLOGICAL PRACTICES
LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS
20.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY.
DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION.
21.PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A
WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE
SCHEDULE ON STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS
POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE.
22.ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING
THE SITE.
23.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY
EQUIPMENT TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER
PERMANENT EROSION CONTROL IS INSTALLED.
24.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING,
AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL
STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT
OF THE PROJECT. ALL OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE
MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED.
25.ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL
MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION
CONTROL REPORT.
26.ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL
MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY
CLEANED OUT.
27.ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF
CONTROL MEASURES.
28.ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM
OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL.
29.ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL
MEASURES.
30.NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT
EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY
HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN
SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR PERMANENT EROSION CONTROL
CAN BE PERFORMED.
31.ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE
CASES WHERE HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT
DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER CLARIFICATION.
VEHICLE TRACKING
32.AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST
ONE STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE
VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES).
33.IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS
LOCATED NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM.
34.CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE.
CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF
SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND
LEGALLY DISPOSED OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE
PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE).
35.IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR.
LOADING AND UNLOADING OPERATIONS
36.THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE
WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD
IMPACT WATER QUALITY.
OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS
37.ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL
GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS.
38.ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS,
SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE
(VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH
SPOTS OR ON PALLETS), COVERED (PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY CONTAINMENT OR OTHER
CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND
SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS.
VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING
39.PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL
BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE
ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE.
SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS
40.THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT
IN FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE
IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS
DETERMINED BY ANY CITY INSPECTORS.
CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT
41.ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE
LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE
INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL
MEASURE IS TO OCCUR, A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY CLEANED OUT.
42.THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER
ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS.
DEDICATED ASPHALT AND CONCRETE BATCH PLANTS
43.DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO
REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM
THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO BE USED ON SITE.
CONCRETE SAW CUTTING MATERIALS
44.SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM
LEAVING THE IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL.
WASTE MATERIALS STORAGE AND SANITARY FACILITIES
45.TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE
WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER,
LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS
REQUIRED TO PRACTICE GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS.
46.SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED
AS FAR AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS
OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS.
OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS
47.SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE'S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER
CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE
CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH
LARIMER COUNTY SHERIFF DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED
TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY.
48.SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE
ENTRAPMENT ISSUES.
FINAL STABILIZATION AND PROJECT COMPLETION
49.ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE
TURNING THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY.
50.ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
51.ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL
GRADING.
52.SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF
THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE.
53.ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS REQUIREMENTS.
54.ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND
SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL
SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING AND TACKIFICATION.
55.ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED
MULCH OR TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF
EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE
STEEP SLOPES. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL,
TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED.
56.THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN
ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
57.THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES
MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE
DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED
STABILIZED AND VERIFIED BY CITY EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER
FINAL STABILIZATION IS ACHIEVED.
58.THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED
AND 2) ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED
COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES.
B.STREET IMPROVEMENT NOTES
1.ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE.
2.A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET
CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO
PLACEMENT OF ANY ASPHALT.
3.WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN
CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE
ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER.
4.STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED
AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5.FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED.
6.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE
DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED
PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK
SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK.
7.ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE
RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8.THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE
THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9.PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS
PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE
MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES
INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS
EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING
SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PREFORMED IN THE PRESENCE OF AN INSPECTOR.
C.TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1.ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE.
2.ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC.
3.ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD.
4.ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS.
5.ALL LANE LINES SHALL BE LATEX PAINT.
6.PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR
PLACEMENT SHALL BE APPROVED BY THE LOCAL TRAFFIC ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7.PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS.
8.LATEX PAINT APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS.
10.ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS.
11.A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE
CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN.
12.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES.
13.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN.
14.SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE
RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE
MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR
ON TRAFFIC MARKINGS).
15.SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL.
16.CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS IN CONSTRUCTION AREA. CONTRACTOR MAY KEEP THE SIGNS, OR CALL THE CITY TRAFFIC
DIVISION TO HAVE THEM REMOVED.
17.NO "RESET" ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS WILL BE ACCEPTED.
18.ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS SHALL BE NEW AND BE CONSISTENT WITH THE LCUASS CRITERIA.
D.STORM DRAINAGE NOTES
1.THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES
SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
2.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR HEARTSIDE HILL BY HIGHLAND DEVELOPMENT SERVICES, SHALL BE FOLLOWED
AND IMPLEMENTED.
3.SEE CITY OF FORT COLLINS STORMWATER CRITERIA MANUAL - APPENDIX F CONSTRUCTION CONTROL MEASURES STANDARD NOTES AND STANDARD EROSION CONTROL NOTES.
FORT COLLINS - LOVELAND WATER DISTRICT AND SOUTH FORT COLLINS SANITATION DISTRICT NOTES
1.ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE FORT COLLINS - LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION DISTRICT
STANDARDS AND SPECIFICATIONS.
2.CONSTRUCTION OF WATER AND SEWER FACILITIES REQUIRE A PRECON MEETING WITH DISTRICT OPERATIONS STAFF PRIOR TO CONSTRUCTION.
3.CONTRACTOR SHALL NOTIFY DISTRICT INSPECTORS PRIOR TO STARTING WORK.
4.CONTRACTOR SHALL CONTACT THE SANITATION DISTRICT FOR SEWER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING SEWER STUBS.
5.ALL COMMERCIAL DOMESTIC SERVICES REQUIRE A REDUCED PRESSURE BACKFLOW PREVENTION DEVICE.
6.ALL WATER LINES SHALL BE A MINIMUM OF (5) FIVE FEET AND A MAXIMUM OF (6) SIX FEET BELOW FINAL GRADE.
7.ALL DISTRICT VALVES SHALL ONLY BE OPERATED BY DISTRICT OPERATIONS STAFF.
8.PIPE PRESSURE AND VACUUM TESTING SHALL BE WITNESSED BY DISTRICT INSPECTORS. WATERLINE BACTERIA TESTS SHALL ALSO BE TAKEN BY DISTRICT INSPECTORS.
9.ONCE THE SYSTEM IS OPERATIONAL AND ALL TESTS HAVE PASSED, CONTRACTOR SHALL REQUEST SUBSTANTIAL COMPLETION WITH A LETTER TO THE DISTRICT THAT INCLUDES THE DOLLAR VALUE OF
THE WATER AND SEWER IMPROVEMENTS LISTED SEPARATELY.
10.AS-BUILTS SHALL BE SUBMITTED IN PDF AND DWG TO THE DISTRICT FOR FINAL APPROVAL.
11.IF GROUNDWATER IS ENCOUNTERED WITHIN THE DEPTH OF SEWER CONSTRUCTION, MANHOLES MUST BE WATER-PROOFED.
12.A REDUCED PRESSURE PRINCIPLE BACK-FLOW-PREVENTION-DEVICE (BFPD) IS REQUIRED ON THE FIRE LINE AND THE DOMESTIC WATER SERVICE LINE.
13.TREES AND OTHER LANDSCAPING ARE NOT ALLOWED WITHIN 10 FEET OF DISTRICT FACILITIES.
CITY OF FORT COLLINS GENERAL NOTES
REVISIONNO.BYDATEHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comPREPARED BY OR UNDER THE
DIRECT SUPERVISION OF:
FOR AND ON BEHALF OF HIGHLAND
DEVELOPMENT SERVICES
REVIEW SET
NOT FOR
CONSTRUCTION
OFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJECT #
SCALE (V)HEARTSIDE HILLGENERAL NOTES2/22/23
N/A
N/A
ZMW
JTC
21-1045-00
C0.01
2 24