Loading...
HomeMy WebLinkAboutBANK ONE PUD - PRELIMINARY & FINAL - 54-87W - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL REPORT FOR BANK ONE AT HARMONY MARKET Prepared for Meline & Irelan, Inc. 471.0 S. College Avenue Fort Collins, Colorado 80525 To Meet the Preliminary/Final Submittal Requirements for the City of Fort Collins 256 West Mountain Avenue Fort Collins, Colorado 80521 Prepared by Resource Consultants & Engineers A Division of Owen Ayres & Associates, Inc. 3665 JFK Parkway Building 2, Suite 300 Fort Collins, Colorado 80525 RCE Ref. No. 34-0144 JAI MME June 1994 ASSOCIATES RCEciates June 6, 1994 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 281 North College Avenue Fort Collins, Colorado 80521 Re: Bank One at Harmony Market Dear Basil: Enclosed please find the "Final Drainage and Erosion Control Report for Bank One at Harmony Market." This report was prepared in accordance with the City of Fort Collins Storm Drainage Criteria as revised in May 1991. We appreciate your time and consideration in reviewing this submittal. Please call if you Nhave any questions. Sincerely, Resource Consultants & Engineers A Division of Owen Ayres & Associates, Inc. Chris Carlson, EIT MR. 4P.E. Manager, Civil Engineering CAC:-PRB:bbv Enclosure cc: Vic Meline Re-outce Consultants & Engineers Engineers/Scientists/Surveyors 665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort. Collins; CO 80527 (303) 223-5556, Denver Metro (303) 572-1806, FAX (303) 223-5578 Ili inted on re,:yded ?aper BANK-ONE.LTR 34-0144.00 TABLE OF CONTENTS Page 1. INTRODUCTION..............................................1 2. PREVIOUS STUDIES ................ .. ...................... . 1 3. DRAINAGE PATTERNS..........................................1 4. HYDRAULIC ANALYSIS.........................................5 5. EROSION CONTROL PLAN ...................................... 7 5.1. Overview .............................................. 7 5.2. Wind Erosion ............................................ 7 5.3. Rainfall Erosion ................ .......... .............. 7 LIST OF FIGURES Figure 1. Vicinity map. ..... ...... ..... ............................ 2 Figure 2. Existing drainage patterns .................................. .. 3 Figure 3. Time schedule . ............................................. 8 LIST OF TABLES Table 1. Results of Detention Pond Sizing .................................. 5 Table 2. Construction Cost Estimate . .................................... 9 Resource Consultants & Engineers ii A Division of Ayres Associates 1. INTRODUCTION This report summarizes the storm drainage investigations performed for the proposed Bank One At Harmony Market in Fort Collins, Colorado. A hydrologic analysis of the proposed development was completed to determine the magnitude and location of storm runoff, effects on Boardwalk Drive, and to develop a detention pond. The analysis was completed to meet City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual. The Bank One development is located at the southwest corner'of Harmony Road and Boardwalk Drive and to the north of Miramont First Filing. Preliminary/final drainage report requirements as shown in Figure 1. It consists of approximately 2.0 acres occupying the east half of Section 1, Township 6 North, Range 69 West, of the 6th Principal Meridian. A site master drainage plan for the overall development of the Oak/Cottonwood Farm was prepared by RBD, Inc. to meet the City's submittal requirements for Overall Development Plans and is contained in the April 1994 report "Overall Drainage Study, Oak/Cottonwood Farm, Fort Collins, Colorado." This study was used as basis for the proposed drainage facilities of this development. 2. PREVIOUS STUDIES Previous drainage studies of the area include (1) "Overall Drainage Study, Oak/Cottonwood Farm, Fort Collins, Colorado" by RBD, Inc. (RBD), April 20, 1994 (has not been approved by the City); (2) "Final Drainage and Erosion Control Study For The Upper Meadow At Miramont First Filing, Fort Collins, Colorado" by RBD, November 10, 1992; and (3) "Final Drainage and Erosion Control Study for The Upper Meadow at Miramont Second Filing, Fort Collins, Colorado" by RBD. These were reviewed to assist with the preparation of this report. 3. DRAINAGE PATTERNS The Bank One site lies along the east border of.the Front Range Baptist Church property and immediately to the west of Boardwalk Drive. It is in the north east corner of a 22.9 acre offsite basin in the Oak/Cottonwood Farm Overall Drainage Study (RBD). Besides the church, there is an �irrigation ditch running east - west across the basin. The ' basin is currently at historic conditions with native grasses north of the irrigation ditch and alfalfa planted south of the ditch. As shown in the grading and drainage plan, runoff sheet flows into the west Boardwalk Drive gutter where it is conveyed southeasterly to a curb inlet constructed as part of Miramont Second Filing. A landscaped berm was constructed along the north property line of the First Filing of Miramont that prevents flow from crossing existing residential lots and redirects to Boardwalk Drive. Existing runoff calculations were performed to determine the 10- and 100-year runoffs for the site using the rational method. Concentration point 1 (Figure 2) is the area along the northern boundary of the project which runoff flows directly into the drainage ditch along Harmony Drive. The area of this basin is 0.08 acres and runoff is 0.09 and Resource Consultants & Engineers 1 A Division of Ayres Associates ,P 1-25 NORTH TO CHEVENNE '4 MULBERRY ST. TO 11-25 --b- EXIT 269 LAUREL ST. COL.ORADO STATE UNNERSITY CAMPUS PROSPECT RD. TO 1-25 - EXIT 268 DRAKE RD. N I 8 N HOR.SETOOTH RD. il HARMONY W Z W m RD. F TO 1-25 EXIr 265 PROJECT LOCATION VICINITY MAP N.T.S. Figure 1. Vicinity map. 2 Resource Consultants & Engineers A Division of Ayres Associates W MI (D >0 <; CD 0 0 0 0 fn 0►. C Dd •G � � r+ CD fn N cD M N 7 0 co 2, (D tD fp N LEGEND C BASIN DESIGNATION 3.44oc BASIN AREA OCONCENTRATION POINT BASIN LIMITS 15 30 I5 0 30 SCALE IN FEET .EAST HARMONY ROAD ,a ' A 0.080C .... o.�..o tea•• e i . .. apt ...... �' � ..wp' � .. � ' � .. ♦oo�- .. i a Of 4 Located at east side of Boardwalk Drive 22:9ao North of Miramont First Filing Figure 2. Existing drainage patterns. 0.18 cfs, respectively, for the 10- and 100-year events. Concentration point 2 is the offsite drainagefrom the adjacent church property to the east. The area is 1.47 acres and the 10- and 100-year runoff is 2.62 and 5.57 cfs, respectively. Concentration point 3 is the remainder of the project site, including the offsite drainage to the east. The area of the basin if 3.44 acres and the runoff is 2.19 and 4.53 cfs, respectively, for the 10- and 100- year events. Existing runoff was also computed for the entire drainage basin (offsite basin 0-1, RBD, Miramont First Filing) which includes this site to assist with the design of the detention pond. The concentration point is located at Broadwalk Street just north of Miramont First Filing. The basin area is 22.9 acres and the runoff for the 2-, 10-, and 100- year events is 5.94, 10.66, and 22.53, respectively. A detailed grading, drainage, and erosion control plan (enclosed in pocket) shows the building layout and storm drainage facilities that will be used for the Bank One development. The map uses a contour interval of 1 foot. Flow from the adjacent church property, Basin A, is carried through a short swale into a 15-inch RCP storm drain which crosses the site to Inlet 2. At Inlet 2, this pipe connects to a 24-inch RCP storm drain and is located near the east edge of the property and south of the Bank One building. It is a 13-foot type R curb inlet with a 14.30 cfs capacity and drains Basin B. The 5-foot type R curb, Inlet 3, which is southeast of Inlet 2, connects to the 24-inch pipe. Inlet 3 has a capacity of 4.80 cfs and drains water from Basin C. Runoff collected from the church property and these two inlets will be directed into a drainage swale which runs south into a proposed detention pond located just north of Miramont First Filing and adjacent to Broadwalk Drive. The swale is 2 feet deep with 4 to 1 sideslopes and will be contained in an 18-foot easement. Runoff from Basin E will flow into the existing concrete channel along Harmony Road. Calculations show that this flow is too small to cause hydraulic problems in the ditch and does not effect the overall development plan. Runoff from Basin D will flow into the Boardwalk Drive gutter instead of being routed through the swale and detention pond. This will not have a negative effect on the gutter nor will it exceed its capacity. As part of the Overall Drainage Study, a detention pond is proposed just north of Miramont First Filing adjacent to Broadwalk Drive, at the southeast corner of the 22.9 acre basin. This basin was noted as having the same storm water runoff discharge requirement. of 0.5 cfs/acre as the remainder of the Oak/Cottonwood Farm development. Also shown on the Overall Drainage Plan, a storm drain would be used to convey water from. the detention pond to the Boardwalk Drive gutter. With development of The Upper Meadow at Miramont First Filing and Boardwalk Drive, the conveyance capacity of Boardwalk Drive during the 10-year storm was found to be 12.90 cfs (RBD, 1992). Basin 1 of the First Filing will be contributing 7.33 cfs of storm water onto Boardwalk Drive during the 10-year storm and 2.43 cfs will come down the gutter from Basin D, leaving a maximum of 3.14 cfs that can be released out of the detention pond. This corresponds to 0.14 cfs/acre, Which is below the 0.5 cfs/acre maximum and therefore acceptable. For the 100-year storm event, the detention pond is entitled to release 1 1.38 cfs of storm water onto Boardwalk Drive. Basin 1 of the Miramont First Filing will contribute 15.70 cfs and 10.03 cfs will come down the gutter from Basin D. The capacity of Boardwalk Drive during a 100-year storm is 107.7 cfs (RBD, 1992). Assuming a maximum "I amount of water leaving the detention pond (11.38 cfs), Boardwalk Drive can adequately convey the 100-year storm runoff. Resource Consultants & Engineers 4 A Division of Ayres Associates r-- 4. HYDRAULIC ANALYSIS The Bank One at Harmony Market property consists of four basins, labeled Basins B, C, D, and E, that contribute drainage to separate outlets from the property. There is also one offsite basin that contributes drainage, namely Basin A. Design points were identified at all locations where storm runoff will leave the property and at inlets. The rational method, which was used for the Overall Drainage Study, was used to determine the 10- and 100- year discharges that would occur as a result of the proposed Bank One development. The cumulative runoff method was used to size the detention pond. Results are summarized in Table 1. Calculations supporting these numbers can be found in the Appendix. Table 1. Results of Detention Pond Sizing. Basin Area (ac) Cumulative Area (ac) Runoff Coeff (C) CR Overland Flow Length (ft) Average Overland Slope M Gutter Flow Length (ft) Average Gutter Slope M Gutter Flow Velocity (fps) 2-Yr A 1.39 1.39 0.41 1 1.25 35 1 1.8 465 1.8 2.1 B 1.42 1.42 9.5 1 1.25 41 2 379 0.8 1.8 A+B 2.81 2.81 0.68 1 1.25 35 1.8 712 1.45 1.65 C 1 0.7 0.7 0.95 1 1.25 12 1 1 281 0.8 1.8 D 0.14 0.14 0.95 1 1.25 - - 213 1.5 2.2 E 0.8 0.8 0.15 1 1.25 15 20 223 1.5 1.8 Basin Overland Time of Concentration Gutter Travel Time (min) Total Net Time Tc Rainfall Intensity I Peak Discharge Q 10-Yr (min) 100-Yr (min) 10- Yr (min) 100-Yr (min) 10-Yr (in/hr) 100-Yr (in/hr) 10-Yr (cfs) 100-Yr (cfs) A 6.3 5.3 3.7 10 9 4.35 7.4 2.48 5.27 B 1.4 0.7 3.5 4.9 4.2 5.6 9.6 7.55 16.19 A+B 6.3 5.3 6 12.3 11.3 5.2 8.5 10.08 20.3 C 1 0.6 2.6 3.6 3.2 6 9.6 3.99 7.98 D - - 1.6 1.6 1.6 1 6 9.6 0.8 1.6 E 2.5 2.4 2.1 4.6 4.5 5.6 9.6 0.7 0.14 Basin A, an offsite basin having an area of 1.39 acre, will drain southeasterly into a short Swale tapering in a 15-inch RCP storm drain labeled Concentration Point #1. The storm drain runs to across the property where it connects to Inlet 2. The storm drain was sized to carry the entire 100-year storm runoff. Basin B, having an area of 1.42 acre, will drain by gutter and sheet flow to the southeast corner of the parking lot at Inlet 2 (Concentration Point #2). Drainage through Resource Consultants & Engineers 5 A Division of Ayres Associates Inlet 2 will flow through a 24-inch RCP to Inlet 3 (Concentration Point #3). A 5.55 cfs capacity overflow swale beginning at point #2 also flows to point #3. This swale will only carry overflow from the 100-year storm. Flow in the swale will spill over the walk into Inlet 3. Basin C, which has an area of 0.70 acre, will drain along the entrance road north gutter and the west Boardwalk Drive gutter to Inlet 3 (Concentration Point #3). Offsite area on Boardwalk Drive contributes 0.21 acre to Basin C. Runoff above Inlet 3's capacity, which occurs only in the 100-year storm, will cross the access road and flow into the Boardwalk Drive gutter. The capacity in the gutter will not be exceeded. Basin D, having an area of 0.14 acre, is the south half of the access road. All runoff from Basin D will leave the property at Concentration Point #4 and enter the Boardwalk Drive gutter. Basin E, which has an area of 0.08 acre, will drain into an existing concrete channel parallel to Harmony Road. The amount of runoff is very small and will not effect the channel or any downstream facilities. The sump curb inlets at points #2 and #3 are 13 feet and 5 feet in length, respectively. For a curb full condition, they have capacities of 14.30 cfs and 4.80 cfs, respectively. The storm drain pipes to and from the inlets are designed to carry the maximum amount of flow the inlets will allow. In a 10-year storm all the runoff from Basins A, B, and C will be intercepted by the inlets and flow into the storm drains. During a 10-year storm the runoff leaving the storm drain system and entering the drainage swale is 10.83 cfs. This is less than the capacity of the storm drain system. During the 100- year storm, 5.27 cfs flows through the 15-inch pipe from point #1 to #2. The inlet capacity at point #2 of 14.30 cfs is added to the storm drain, while 1.89 cfs overflows into the 8 foot wide overflow swale. At point #3 the inlet capacity of 4.80 cfs is added to the storm drain and 5.07 cfs flows into the Boardwalk Drive gutter. During the 100-year storm the runoff leaving the storm drain system and entering the drainage swale is 24.37 cfs. The capacity of the drainage swale is 38.94 cfs at 2-foot depth and minimum slope. Using the most restrictive conditions, the Boardwalk Drive gutter capacity will not be exceeded by the development of the Bank One property. During a 10-year storm the discharge into the gutter at Concentration Point #4 is 0.80 cfs. During the 100=year storm the discharge is 6.67 cfs. Further downstream, just above the detention pond outlet, the 10-year storm runoff is 2.43 cfs and the 100-year storm runoff is 10.03 cfs. The allowable gutter capacity is 12.90 cfs for the 10-year storm and 107.7 cfs for the 100- year storm (RBD, 1992), neither of which are ever exceeded. The detention pond was sized to contain the 100-year storm runoff from the developed Bank One and church property and the historic flow from the remaining property, 22.97 acres total. The drainage swale will capture all sheet flow from the undeveloped land that originally flowed into the Boardwalk Drive gutter. Using the cumulative runoff method, the storage volume required to contain the 10-year storm is 0.605 ac-ft and 1.474 ac-ft for the 100-year storm. This corresponds to depths of 1.0 feet and 1.4 feet of water for the 10- and 100-year storm, respectively. Using a 15-inch ADS pipe to drain the detention pond into the street gutter, the maximum flow rates are Resource Consultants & Engineers 6 A Division of Ayres Associates 2.9 cfs and 4.6 cfs for the 10- and 100-year storms, respectively. These are both below the approved maximum flow rates of 3.14 cfs for the 10-year storm and 11.38 cfs for the 100-year storms. A 16-inch by 24-inch area inlet will direct water into the storm drain from the detention pond. Calculations are shown in the appendix. 5. EROSION CONTROL PLAN 5.1. Overview The Bank One at Harmony Market will be a 2.05 acre development zoned C on moderate erodibility soil. Overlot grading will begin the first week of August and building construction will be completed in March, 1995 (Figure 3). Both wind and water erosion will be addressed in this plan. The property is divided into two individual basins. Basin 1 contains subbasins B, C, and D and drains to the southeast corner of the property.. Basin 2 contains only Basin E of the drainage plan. Erosion control for the detention pond area will be considered as a third basin, Basin 3, even though it is not on the Bank One property. Subbasin B contains 1.42 acre, of which 1.37 acre will be disturbed. Subbasin C contains 0.49 acre, of which 0.46 acre will be disturbed. The undisturbed portions of these two basins exist as part of the developed church property. The 0.14 acre of subbasin D will all be disturbed.. Basin E contains 0.08 acre, of which 0.05 acre will be disturbed. The undisturbed portion currently exists as the concrete drainage channel along Harmony Road. 5.2. Wind Erosion Since construction will occur during the winter months, effective wind erosion plans must be established. On moderate erodibility soil, significant erosion could occur without steps taken to protect the soil. Those portions of Basins 1 and E not planted with sod grass or covered with pavement, will have 2 tons/acre of straw mulch applied for water erosion control, which also meets the requirements for minimum wind erosion protection. All mulches will be properly anchored: 5.3. Rainfall Erosion Subbasin B, of which 1.37 acre will be disturbed, lies in the north half of the Property, just south of the small Basin 1. The majority of subbasin A will. be covered with asphalt and concrete, however, 0.31 acre will have sod grass planted and the remaining 0.19 acre will be covered with 2 tons/acre of straw mulch either crimped 4 or more inches into the soil or sprayed with a tackifier. A gravel sediment filter will be place at the storm sewer inlets 1 and 2. Subbasin C. of which 0.46 acre will be disturbed, lies immediately to the south of subbasin B. Sod grass will cover 0.08 acre, pavement will cover 0.17 acre, and the remaining disturbed area will have 2 tons/acre of straw mulch anchored in the same manner as subbasin B. A gravel inlet filter will be placed at Inlet 3. Resource Consultants & Engineers 7 A Division of Ayres Associates PROJECT: Bank One At Harmony Market SEQUENCE FOR 1994/95 ONLY COMPLETED BY Chris Carlson DATE: 6/6/94 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. August September November December January --February March OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Vegetative Methods Soil Sealant RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap / Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare. Soil Preparation Contour Furrows Asphalt / Concrete Paving VEGETATIVE: Permanent Seed Planting Mulching / Sealant Temporary Seed Planting Sod Installation Nettings / Mats / Blankets BUILDING CONSTRUCTION: STRUCTURES: INSTALLED BY: Contractor MAINTAINED BY: Contractor VEGETATION / MULCHING CONTRACTOR: Contractor DATE SUBMITTED: 6/6/94 APPROVED BY CITY OF FORT COLLINS ON Figure 3. Time schedule. Resource Consultants & Engineers 8 A Division of Ayres Associates Subbasin D, all of which is disturbed, will have 0.13 acre covered with asphalt and 0.01 acre of sod grass. A silt fence will be placed along the south border of subbasin D to prevent sediment from leaving the project before asphalt is in place. Basin E, of which 0.05 acre will be disturbed, lies along north border of the property 1 and contains the existing concrete channel, which runs parallel to Harmony Road. All of the disturbed area in Basin E will be covered with sod grass. 'i Basin 2, which is the detention pond, is 2.21 acres total area. There will be a concrete trickle channel on 0.02 acre and sod grass on the remaining 2.19 acre. A gravel inlet filter will be placed at the detention pond outlet pipe. In addition to the required erosion control measures taken for the basins, 3 straw bale dikes will be placed in the drainage swale between the storm drain and the detention pond. The calculations for performance standards and effectiveness are shown in the Appendix as well as the supporting calculations. Security requirements for erosion control are shown in Table 2. The largest amount, the cost for erosion control measures, will be submitted. Table 2. Construction Cost Estimate. Item Description Units Quantity Unit Cost Total Comments EROSION CONTROL MEASURES 1 Silt fence ft 210 $ 1 $ 210 2 Sod grass ac 2.64 500 1,320 3 Straw bales ea 12 4 48 4 Inlet filter ea 4 300 1,200 5 Straw mulch at 2 tons/acre ac 0.4 250 100 Total $2,878 1.5 x Total $4,317 Total security required GROSS AREA REVEGETATION 1 Revegetation of disturbed area ac 4.23 $ 500 $2,115 Total $2,115 1.5 x Total $3,173 Total security required Resource Consultants & Engineers 9 A Division of Ayres Associates