HomeMy WebLinkAboutBANK ONE PUD - PRELIMINARY & FINAL - 54-87W - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 7
MEETING DATE 8122194
STAFF _Ted Shapard
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Bank One at Harmony Market Preliminary P.U.D,
#54-87W
APPLICANT: Bank One
c/o Cityscape Urban Design
3555 Stanford Road, Suite 105
Fort Collins, CO 80525
OWNER: Oak Farm, Inc.
c/o G.T. Land, Colorado, Inc.
3555 Stanford Road, Suite 100
Fort Collins, CO 80525
PROJECT DESCRIPTION:
This is a request for Preliminary P.U.D. for a 3,600 square foot
bank, with drive -up windows, and a two-story, 11,000 square foot
office building. The property is 2.14 acres in size and located at
the southwest corner of Harmony Road and Boardwalk Drive. The
parcel is zoned R-P, Planned Residential.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
Although Parcel S of the Oak -Cottonwood Farm is subject to the
moratorium within the Harmony Corridor, banks and offices were
exempted from the list of prohibited land uses. The P.U.D.
complies with land use designation of "Retail/Office" on Parcel S
of the Oak -Cottonwood Farm Overall Development Plan. The P.U.D.
satisfies both the All Development Criteria and the requirements of
the Auto Related and Roadside Commercial Point Chart of the
L.D.G.S. With residential scale and character, and by using
similar materials as Harmony Market Shopping Center, the P.U.D. is
compatible with the surrounding area. The project is feasible from
a traffic engineering standpoint and promotes transportation
policies.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
0
Bank One at Harmony Market PUD - Preliminary, #k54-87W
August 22, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background•
The surrounding zoning and land uses are as follows:
N: R-L-P; Existing Convenience Store (7-Eleven)
S: R-P; Vacant
E: R-P; Vacant (Approved For Red Robin Standard Restaurant)
W: R-L-P; Existing Church (Front Range Baptist Church)
The site is Parcel S of the Oak -Cottonwood Farm Overall Development
Plan, approved in 1987. The parcel is not a part of the Harmony
Market Shopping Center P.U.D.
2. Harmony Corridor Moratorium:
Unlike Harmony Market Shopping Center, Parcel S of the Oak -
Cottonwood Farm was not exempted from the six-month moratorium on
"retail and commercial" development within the Harmony Corridor.
As land uses however, banks and offices were defined by City
Council Ordinance Number 103-1994 as not being "retail or
commercial" and, therefore, allowed to be processed as a P.U.D.
during the moratorium.
3. Bank One P.U.D. - Phase Two:
Phase Two of Bank One P.U.D. indicates an office/retail building.
"Miscellaneous retail" is specifically prohibited from being
processed by the Planning Department during the Harmony Corridor
moratorium. The P.U.D., therefore, can only allow "Office" to be
an allowable use that obtains Preliminary status. Since "Retail"
falls under the moratorium, it is not allowed on the P.U.D. If
"Retail" is desired as a land use, then the applicant must wait
until the moratorium is lifted and process the request accordingly.
This P.U.D. does not grant Preliminary status to "Retail" as an
allowable land use on Phase Two.
4. Land Use•
Parcel S of the Oak -Cottonwood Farm Overall Development Plan is
designated as "Retail -Office." The request for a P.U.D. featuring
a bank and retail building, is, therefore, in compliance with the
Oak -Cottonwood Farm O.D.P.
•
•
Bank One at Harmony Market PUD - Preliminary, #54-87W
August 22, 1994 P & Z Meeting
Page 3
The request was evaluated by the absolute and variable criteria of
the Business Services Point Chart of the L.D.G.S. The P.U.D.
satisfies the one absolute requirement by gaining primary access
from a street other than South College Avenue.
On the variable criteria, the P.U.D. achieves a score of 72% which
exceeds the minimum required score of 50%. Points were earned for
the following:
b. Being located outside the "South College Avenue Corridor."
d. Being located on at least two acres of land.
e. Containing two significant uses.
f. Having direct vehicular and pedestrian access between on -site
parking areas and adjacent existing or future off -site parking
areas which contain more than ten spaces.
h. Having at least one -sixth of its property boundary contiguous
to existing urban development.
The proposed land uses associated with Bank One P.U.D. are
supported by the performance on the Business Services Point Chart
of the L.D.G.S.
3. Neighborhood Compatibility:
A neighborhood information meeting was held on May 26, 1994, in
conjunction with Golden Corral Restaurant and Outback Steakhouse.
There were no major concerns raised by those attending the meeting.
Since the proposed uses on the property conform to the Oak -
Cottonwood Farm O.D.P., and the O.D.P. went through a rigorous
review process, the P.U.D. is considered acceptable. A bank and
office building are considered compatible with the surrounding
neighborhood.
4. Design:
The primary design feature of the P.U.D. is that the bank building
will feature a pitched roof and red brick exterior to match the
Harmony Market Shopping Center. The roof will be a dark gray,
laminate asphalt/fiberglass shingle. These design features are
residential in both scale and character and contribute to blending
the large anchor tenants in Harmony Market with the residential
neighborhoods to the north.
C]
•
Bank One at Harmony Market PUD - Preliminary, #k54-87W
August 22, 1994 P & Z Meeting
Page 4
The office building will be two story and feature similar exterior
materials. While the roof will not be as steep, it remains pitched
and will use the same residential style shingles. The office
building, like the bank building, contributes to the scaling down
of the anchor tenants and helps blend the 50 acre commercial
shopping center with the existing residential neighborhood to the
west.
In summary, Bank One P.U.D. is being planned as if it were part of
Harmony Market Shopping Center. By using similar exterior
materials, and by being residential in character and scale, the
design is sensitive to the surrounding area.
5. Transportation:
Parcel S gains access from Boardwalk Drive in direct alignment with
the curb cut serving Harmony Market Shopping Center. There is no
access onto Harmony Road. Future access is planned to the west in
cooperation with Front Range Baptist Church. The Church has agreed
to work with the developer on joint future access and shared
parking.
Traffic generated by Bank One P.U.D. has been accounted for in
previous traffic studies conducted for the Oak -Cottonwood Farm
area. In fact, the traffic study assumed the office building would
be retail which has a higher trip generation rate. This traffic
can be accommodated on the existing street system at no loss in the
Level of Service at the Harmony/Boardwalk and the Boardwalk/access
drive intersections.
The traffic studies done for the 1994 proposals in Harmony Market
Shopping Center (Red Robin, Tyco Oil, Golden Corral, Outback
Steakhouse, Steele's Expansion, Outpost/ Sunsport/Lee 's Cyclery)
indicate that there is a need to lengthen time for the green left
turn arrow for northbound Boardwalk to westbound Harmony. This
left turn phase needs more time on Saturday only, particularly at
the noon peak. The studies indicate that this turn movement is at
Level of Service F although the balance of intersection remains at
Level of Service C. The City's Transportation Department has been
advised of this Saturday condition and is taking action
accordingly.
For Bank One P.U.D., the project is feasible from a traffic
engineering standpoint. With sidewalk improvements along both
streets, and bicycle parking for customers and employees, the
P.U.D. promotes multi -modal transportation policies.
0
•
Bank One at Harmony Market PUD - Preliminary, #54-87W
August 22, 1994 P & Z Meeting
Page 5
6. Findings of Fact/Conclusion
In evaluating the request for Bank One Preliminary P.U.D., Staff
makes the following findings of fact:
1. As land uses, banks and offices are allowed to be processed
for Preliminary status during the Harmony Corridor moratorium on
retail/commercial development.
2. The request for banking services and offices conforms to the
Oak -Cottonwood Farm Overall Development Plan.
3. The P.U.D. satisfies the All Development Criteria of the
L.D.G.S.
4. The P.U.D. is supported by the performance on the Business
Services Uses Point Chart of the L.D.G.S.
5. With residential scale and character, and similar materials as
found in Harmony Market Shopping Center, the P.U.D. is
compatible with the surrounding area.
6. The P.U.D. is feasible from a traffic engineering standpoint
and meets the City's transportation policies.
RECOMMENDATION:
Staff recommends approval of Bank One at Harmony Market P.U.D.,
Preliminary, #54-87W.
ITEM: BANK ONE (CO HARMONY 410
MARKET PUDGqi1Kih21�j°"h
NUMBER.* 5 a -sew �
THE PIER '7-11'
MULTI -FAMILY RESIDENTIAL ZONED RLP
ZONED: RLP
HARMON-Y—ROAD
PPROV ROVED
II PHASE .HE RESTAURANT
RED ROBIN'
A T
RAN
ZONED: RP
LOT I
>
2
FRONT RANGE
BAPTIST CHURCH 'ww. �� I / \ (I
ZONED: RLP -j
0
PHASE
ACANT
RP/
'SAMS'
ZONED: RP
SIGNATURE BLOCK atn""
FORT COLLINS BRANCH
TA / Wff 000 9
P.U.D. AT HARmoivr MARKET
PRELIMINARY & FINAL
SITE PLAN
PF�
�j L) wa
30 6o vex
1 OF 3
PROPERTY DESCRIP1142IN VICINITY MAP
GENERAL NOTES
LAND USE BREAKDOWN
0
0
HARMONY ROAD
L
0
m<
ao
F0,?r COUNS BRANCH
/wAoffma/z/W
P.U.0. AT HARMONY MARKET
PRELIMINARY & FINAL 77,
LANDSCAPE PLAN
2 3
. ........
PLANTING NOTES
•
0 �
SAW ONE MEMO MEMA U` YONS
EA57 ELEVATION
WEST ELEVATION — yr=r•-v
0
AWT COLL/NS SPAM Q
AMY 61AW
P.U.D. AT HARMONY MARKET
ELEVATIONS
NORM EUVAT/ON scut r =r
Mom
E%AO, LOGA,IOMS OF WALL MO Tl D SIG1
MAT WITH In DGNSTRUDTION RAMS..
-
G,Y SIfJI GODS SHALL APPLT TO ALL SIfI15.
PHASE TWO O(>=RCEAVCMAM BURDSM GQG MA'"MYS
/ ron,un,ss. w.
SOUTN ELEVATION — r =r
NORTN ELEVATION SOUTN ELEVATION SlN/UR =,
WEST £LEVA77ON EAST E EEVA77ON SIMILAR
is
urban design, inc.
BANK ONE at HARMONY MARKET
Statement of Planning Objectives
June 6, 1994
This proposal comprises a Bank facility and a multi -tenant retail/office building on
approximately 2.14 acres at the southwest corner of Harmony Road and Boardwalk Drive; and
is designed to complement the adjacent Harmony Market PUD. Construction will be phased,
with extensive perimeter landscaping, the proposed bank building, and much of the permanent
parking lot completed with Phase I. The retail/office building is expected to be completed
after Phase I is occupied. Employment at this site is estimated at up to 50 t upon completion
of the retail/office building.
As established with earlier filings at Harmony Market, a Business Service use such as
Bank One is appropriate at this location, and is consistent with the applicable Land Use
Policies of the City of Fort Collins, including those policies promoting maximum utilization of
land within the city; discouraging commercial development from gaining primary access from
College Avenue; giving preferential consideration to urban development proposals with are
contiguous to existing development within the city limits; and locational criteria for
commercial/business types of uses.
The proposed plan is also compatible with the goals and design guidelines outlined for
the pad sites at Harmony Market. The scale of the proposed buildings forms a transition
between the larger anchor users at Harmony Market and the residential uses to the north and
west. Extensive perimeter landscaping along Boardwalk and Harmony is planned in character
with the landscape improvements made with Sams (Pace), Builders Square, and Steele's.
Development of the site is scheduled to begin in late 1994, with completion of the full
site development targeted between 1996 and 1998.
E
•
I.4
1:�
,61�NI< ONE Pe-EI-i1"71N�qAy f.O.O.
BUSINESS
SERVICE USES
POINT CHART E
For All Criteria
Applicable Criteria Only
Criterion
Is
the
Criterion
Applicable
Yes No
I II III IV
Circle
the
Correct Score
Multiplier
Points
Earned
ixll
Maximum
Applicable
Points
a. Transit Route
)(
X
2
0
2
--
—
b. South College Corridor
0
IX
©
0
4
g
8
c. Part of Center
X
X
2
3
Q
6
d. Two Acres or More
X
X
U2
0
3
(�
b
e. Mixed -Use
1
X
2
0
3
(b
6
f. Joint Parking
1110
0
3
(o
g. Energy Conservation
X
1
213
0)
2
Q
8
h. Contiguity
X
X
o2
0
5
(p
10
i. Historic Preservation
y,
1
2
0
2
_
J.
1
2
0
k•
1
2
0
i
1
2
0
Totals 3 6 50
v vi
Percentage Earned of Maximum Applicable Points V/VI = VII 'r%eii %
vll
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised March 1994
- 73 -