Loading...
HomeMy WebLinkAboutBANK ONE PUD - PRELIMINARY & FINAL - 54-87W - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS9 0 July 7, 1994 Ted Shepard Senior Planner City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Ted; urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 Attached are five prints of the Bank One Preliminary and Final PUD Plan, revised in response to Staff Comments. Specific responses include: 1 .- 3. Meline & Irelan, the project engineers, are making the requested plat amendments, and responding to Storm Drainage concerns. 4. The bank building does not exceed 5,000 sq. ft. in area. 10. We have discussed the walkway location with Pastor Stephens of the Front Range Baptist Church, and provided him with copies of our plans. 13. The signage noted above the drive-thru lanes is only a small sign that informs customers of the availability of an ATM at that location. The building elevation as originally submitted may have implied a much larger sign than is proposed. 14. As we discussed, a note has been added to the elevations sheet indicating that an administrative change to the Phase Two building will be submitted when final architectural plans have been completed. It is understood that, if Staff does not consider the elevations presented at that time to be consistent with the PUD, the issue may be referred to P&Z. Ten sets of prints, reductions, and color renderings will be submitted by July 18th. We appreciate your assistance in the planning of this project. Please call if you need further information regarding the Bank One PUD. Sincerely, ard, President Cityscape Urban Design, Inc. cc: Don Churchwell, Bank One Larry Ramsdell, Bank One Vic Meline, Meline & Irelan Jeff Wright, Oz Architecture