Dear Eldon:
For your information, attached is a copy of the Staff's comments concerning Bank
One at Southwest Corner of Harmony Road and Boardwalk, presented before the
Conceptual Review Team on April 11, 1994.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely
Z�
Ted Shepard, AIC
Senior Planner
TS/prc
Attachments
cc: Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750
MEETING DATE: April 11, 1994
c
ITEM: Bank One at Southwest Corner of Harmony and
Boardwalk
APPLICANT: Bank One c/o Mr. Eldon Ward, Cityscape. Urban Design,
3555 Stanford Road, Suite 105, Fort Collins, CO.
80525
LAND USE DATA: Request for a bank and retail/office building
located on two acres at the southwest corner of Harmony Road and.
Boardwalk Drive.
COMMENTS:
1. Electrical power is available to the site on the west side of
Boardwalk Drive. An oval vault is installed on the north side of
the site. A "Commercial One" ("C-111) Form will be required to
determine entrance capacity. Normal development charges will apply
based on front footage along public streets and on square area of
site to be developed.
2. The location of the transformer must be coordinated with Light
and Power. The. transformer must be accessible by hard surface from
one side. The transformer must be screened from public view from
both Harmony Road and Boardwalk Drive.. Screening may either be
solid enclosure meeting the clearance specifications of Light and
Power or by landscape materials.
3. The site can be served by a 16 inch water line in -Boardwalk
Drive. There is an existing sanitary sewer can serve, the site and
is located in the south access drive. A repay is due to the church
by the developer of Bank One for the amount of linear footage
shared with this sewer main. Please contact Roger Buffington,
221-6681, for details on water and sewer services and the repay
agreement on the sewer line.
4. If there area uncontained spaces greater than 5,000 square
feet in the retail/office building, then these spaces must be
protected by an approved, commercial -grade, automatic fire
extinguishing system. Fire containment walls must meet the
specifications of the U.B.C. and the Fire Code. For further
information, please contact Mike Pretz, Poudre Fire Marshal, 221-
6570.
5. The site is located in the McClelland -Mail Creek Drainage
Basin. Storm Drainage Fees in this basin are $3,711 per developed
acre. The site will be required to detain storm flows with
controlled release rate that conforms to the overall drainage plan
for Harmony Market. Flows may be released into Boardwalk or to the
south if offsite drainage easements are procurred from the affected
property owners.
6. At the time of submittal, a Drainage Report, Drainage and
Grading -Plan, and Erosion Control Plan must be submitted meeting
the requirements of the Stormwater Utility. For further
information regarding stormwater issues, please contact Glen
Schlueter or Basil Hamden, 221-6589.
7. The irrigation ditch across the Harmony frontage may be used
for drainage purposes. If so, the ditch should be placed within a
drainage easement. If there is upstream drainage feeding into -this
ditch, then the volume of upstream storm flows must be verified to
ensure adequate capacity in the ditch for the subject site.
8. A traffic impact analysis will be required. Please see the
traffic study for Red Robin and be sure to account for the trip
generation rates for a standard restaurant at the southeast corner
of Harmony Road and Boardwalk Drive. It may be necessary to
analyze the Saturday noon peak situation for the shopping center.
The selected traffic consultant should meet with the Cityl-s
Transportation Department to determine the scope of the study.
Please contact Tom Vosburg, 221-6608, for further information.
9. Development of this site will necessitate a detached sidewalk
along Harmony Road. This sidewalk will be seven feet wide and the
City°s Street Oversizing Fee will reimburse for four feet of this
width. Please coordinate with the church regarding the location of
the walk. It will be necessary, at some point, for the walk to
cross the irrigation ditch.
10. An offsite easement may be needed to construct the access
street on the south. Another option would be to include this area
within the plat, dedicate as an access easement, with the landowner
being a signature party to the plat document.
11. The Street Oversizing Fee will be $14,005 per acre.
12. At the time of submittal, a Utility Plan will be required
meeting the submittal requirements, of the City Engineering
Department.
13. A Development Agreement will be drafted specifying the
obligations of the City and developer regarding the public
improvements.
14. The Harmony Corridor Design Guidelines recommend a 30 foot
setback from Boardwalk for parking areas and a 40 foot setback for
the building.
15. All parking areas should take measures to screen headlights.
The preferred solution is a combination of berming and landscaping.
This will be important for the drive-thru facilities.
16. The applicant is encouraged to place a generous 'amount of
screeing and landscaping on the west side of the site to buffer the
residential homes in Fairway Estates. Also, light fixtures, both
pole and building -mounted, must be down directional with sharp cut
off luminaires. Lights must be high pressure sodium, not mercury
vapor or metal halide, in order to cast a softer light and match
the City's streetlights.
17. Architecture must blend with. the Harmony Market Shopping
Center. Normally, this means using complementary, not contrasting
design and exterior materials. While the intent is not to
replicate the center, the bank and retail/office building must not
be perceived as a "stand-alone" commercial development. It is
expected that brick will be one of the exterior materials.
18. The site plan should include the location of ATM's or other
outdoor services.. There should be strong pedestrian connections to
the center and future offsite developing areas. Bike racks. must be
provided for both customers and employees.
19. A neighborhood information meeting will be required. Please
contact the Planning Department for the map of the notification
area. The neighborhood meeting is required to take place prior to
filing for a P.U.D.