Loading...
HomeMy WebLinkAboutOAK HILL APARTMENTS PUD - FINAL - 54-87V - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSJune 9, 1994 Steve Olt City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 Dear Steve; urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 Attached are five sets of prints of the Oak Hill Apartments Final PUD plans, revised in response to Staff Comments. The building types and site plan components proposed here are very similar to those used at Pinecone Apartments; and in many cases we expect that Staff comments will be resolved in the same manner as at Pinecone. Responses to specific comments include: 3. Final Plats were submitted to the City with the rest of the Final PUD package on May 2nd. We have no idea why Planning did not provide the Zoning Department with a copy of the plat. The fact that the prints of the plat were stamped "Preliminary: not for construction" does not mean that the document is a Preliminary Plat. 1 1 . Automatic garage door openers are to be provided with each garage parking space. 12. The sidewalk requested near Building H has been added as requested. The additional sidewalk suggested near Building C is not necessary. Ten sets of prints, reductions, and color renderings will be submitted by June 20th. as requested. Thank you for your assistance in this project. Please do not hesitate to call if you need further information. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Jerry Lee, W.W. Reynolds Companies Libby Glass, W.W. Reynolds Companies Stan Myers, REID, Inc.