Loading...
HomeMy WebLinkAboutMONTAVA - PHASE E - TOWN CENTER RESIDENTIAL - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 3 - STORMWATER-RELATED DOCUMENTS (2)Sheet Number: Project Number:Project:Client:/USERS/MATT/ELC/SHARED/PROJECTS-2015_2019/1725-MONTAVA/1725-02-FILES/1725-MASTERPLAN/01-RESOURCE/TITLE_BLOCK/PUD_SUBMITTAL/24X36_TITLE_BLOCK_PUD_CONSULTANT.DWGPlot Date:9/13/2018 10:34 AM Plotted By: Matthew LambertDate Created:9/13/2018Produced by: Date: Revision & Date: X.X. X.X.XXX 1734 HF2MMONTAVAMONTAVAOVERALL UTILITY PLANPUD MASTER PLAN04/12/23 DPZ CODESIGN Regional Bike Trail Shared 2-way Trail Potential 2-way Trail 1-way Bike Facility Future 1-way Bike Facility Bike Route Future Bike Route Key Pedestrian Connections and Trails Water Storage Area Exposed Water Conveyance Piped Water Conveyance NOTES: Pedestrian sidewalks are not indicated in this diagram, however they are provided on both sides of every street. Pedestrian connections indicated are special by being enhanced for safety, being in important locations, or provided special amenities such as bridges to cross exposed stormwater conveyance. The size and location of all trail and stormwater elements a approximate. They are intended to communicate the general location and interaction of these elements for diagrammatic purposes. The City is responsible for the longterm maintenance of the regional trail within the development. Maintenance consists of snowplowing of the paved surface, occasional seasonal mowing 23’ adjacent to the trail surface, repairing/replacing surface damage of the trail. The underlying property owner is responsible for all other landscaping maintenance within the easement. Landscaping shall be designed in accordance with all applicable City codes. Spray irrigation, if required, shall be designed and maintained to avoid spray on the trail.PHASE ETRAIL AND STORMWATER NETWORKThe above drawings, ideas and designs are the property of DPZ Partners. No part thereof shall be copied, disclosed to others, orused in connection with any work other than for the specific project for which they have been prepared without the written consent ofthe architects/town planners. Preliminary-this is a conceptual drawing not to be used for engineering, surveying, or construction.050100200300400500FeetMAPLE HILL SUBDIVISION FUTURE CITY OF FORT COLLINS PARK SHARED IRRIGATION POND FUTURE ELEMENTARY SCHOOL STORYBOOK SUBDIVISIONMONTAVA FUTURE PHASE D FUTURE CITY OF FORT COLLINS PARK Potential future trail connection to be determined and designed by the city. This potential alignment connects Mountain Vista bike lanes with Phase G shared path through the future park and north through Maple Hill and beyond.Bar Harbor Drive (w/ bike lanes)Potential future trail connection to be determined and designed by the city. Mountain Vista bicycle lanes. Mountain Vista bicycle lanes. MOUNTAIN VISTA MOUNTAIN VISTA Potential connection to Maple Hill shared path. Regional trail, future connection to Richard’s Lake. Phase G shared path connection from Mountain Vista to the future city park. Bicycle Route Piped stormwater from Storybook, connected to No. 8 ditch. WEST MONTAVA OUTFALL SYSTEM Potential shared path along the edge of Phase G and Timberline to be determined and designed by the city. No. 8 ditch in below grade pipe. Potential future trail connection to be determined and designed by the city. Alignment to be determined. Future enhanced pedestrian-focused crossing Bike and pedestrian- focused crossings Shared connection to future Phase E pedestrian ways. Pedestrian trails connect through park north to the elementary school and south to Phase E and future Phase D. Connections to future Phase D. Detention pond / play fields: Conveyance continues to regional detention area. Potential water quality Subsurface water quality Approximate 100 year flood limits MONTAVA FUTURE PHASE H MONTAVA FUTURE PHASE I Regional bike trail coincident with No. 8 ditch pipe easement. Mountain Vista bicycle lanes. Mountain Vista bicycle lanes.Regional Trail underpass included in Timberline Drive work MONTAVA PHASE E MONTAVA RECREATION PARK