Loading...
HomeMy WebLinkAboutWORTHINGTON STORAGE - FDP220016 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (4)STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSSSSSSSSSSSSSSSSS S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSCVAULTELECSSS ELE C ELECEDFES W H Y DH YDWCS WH2O H YDDDTCONTROLIRRWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W WWWWWWWWGEEEEEE E E E E E E E E E E E E E E E E E E EEEEEG G G G G G G G G G G G G G G G GGGGXXX X X XCTVCTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTVCTVTTTTTTTTTTTTTEEEEE E E E E EE E E EE E E E E E EEEEEEEEEEEEEEEE E E E E E E EE E E E E EEEEEEEEEEEEEVAULTF.O.SS FLARED END SECTION TO BE REMOVED 15" RCP STORM DRAIN TO BE REMOVED 8" PVC SANITARY TO REMAIN STORM INLET TO BE REMOVED STORM INLET TO BE REMOVED EXISTING 1 STORY BUILDING STORM MANHOLE AND RESTRICTOR PLATE TO BE REMOVED FENCE ALONG PROPERTY LINE 8" DIP WATER FIRE HYDRANT TO REMAIN STREET LIGHT TO BE REMOVED 8" DIP WATER EXISTING DETENTION POND 8" PVC SANITARY 15" RCP STORM DRAIN TO BE REMOVED 15" RCP STORM DRAIN TO BE REMOVED STORM INLET TO BE REMOVED STORM INLET TO BE REMOVED STREET LIGHT TO BE REMOVED STREET LIGHT TO BE REMOVED STORM INLET TO BE REMOVED EXISTING 54' PUBLIC ROW DEDICATED PER PLAT OF CENTRE FOR ADVANCED TECHNOLOGY P.U.D 16TH FILING 12' UTILITY, DRAINAGE & ACCESS EASEMENT TO BE VACATED 15" RCP STORM DRAIN TO BE REMOVED WORTHINGTON CIRCLE PRIVATE ROAD OWNER: KATSCH24 LLC LOT 2, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. TENTH FILING OWNER: TALL DENTIST LLC LOT 3, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. TENTH FILING OWNER: AWEIDA PROPERTIES INC UNPLATTED OWNER: MARKET CENTRE RETAIL ASSOCIATION OWNER: TWO PAULS LLC LOT 7, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. NINETEENTH FILING LOT 8, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. NINETEENTH FILINGPRIVATEROAD12' UTILITY, DRAINAGE & ACCESS EASEMENT TO BE VACATED 15" RCP STORM DRAIN TO BE REMOVED 6" FIRE SERVICE TO BE REMOVED AND RELOCATED 6" SEWER SERVICE TO REMAIN 2" WATER SERVICE TO REMAIN BLANKET DRAINAGE, ACCESS AND UTILITY EASEMENT TO BE VACATED STORM INLET TO BE REMOVED AND REPLACED PER PLANS 6" GATE VALVE TO BE REMOVED AND RELOCATED SheetThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 32WORTHINGTON SELF STORAGEEX1 DEMOLITION PLAN (UTILITIES)EXISTING CONDITIONS &4 NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. EXISTING OVERHEAD UTILITY OHE Original Field Survery: Northern Engineering Services Project No. 1853-001 Date: May 2021 Triax Engineering, LLC Geotechnical Engineering Report Triax Project No. D21G125 Date: June 4, 2021 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R XXXX X X XXX X XXXSTSTSTSTSS S CVAU L TELEC SS S ELECC ELECEDWHYD H YDWCSWH2OHYDD TCON T R OLIRR GE E E E E E E E E E E E E EEEGGG G G G G G G G GGXXX X CTVCTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTVTTTTTTTTTEEEEVAULTF.O.UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUD UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUD UDUDUDUDUDUDUDUDUDUDUDEXISTING 54' PUBLIC ROW DEDICATED PER PLAT OF CENTRE FOR ADVANCED TECHNOLOGY P.U.D 16TH FILING PROPOSED BUILDING (EXCLUSION EASEMENT) EXISTING BUILDING PROPOSED GARAGE (EXCLUSION EASEMENT) WORTHINGTON CIRCLE PRIVATE ROADPRIVATE ROADOWNER: KATSCH24 LLC LOT 2, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. TENTH FILING OWNER: TALL DENTIST LLC LOT 3, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. TENTH FILING OWNER: AWEIDA PROPERTIES INC UNPLATTED OWNER: MARKET CENTRE RETAIL ASSOCIATION OWNER: TWO PAULS LLC LOT 7, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. NINETEENTH FILING LOT 8, CENTRE FOR ADVANCED TECHNOLOGY P.U.D. NINETEENTH FILING PROPOSED GARAGE (EXCLUSION EASEMENT) PROPOSED GARAGE (EXCLUSION EASEMENT) R-TANK BASIN 3 STORMTECH BASIN 3 R-TANK BASIN 4 STORMTECH BASIN 4 R-TANK BASIN 2 R-TANK BASIN 1 STORMTECH BASIN 1 STORMTECH BASIN 2 IP IP IP IP CWA IP VTC VTC CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF CF CF CFRS RS RS RS RS CFCFCFCFCFCFCFCF CFCFCFCFCFCFCFCF CF EXISTING 15" RCP STORM DRAIN PROPOSED CURB INLET PROPOSED CURB INLET PROPOSED AREA INLET PROPOSED AREA INLET MU MU MU MU MU MU MU SheetThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 32WORTHINGTON SELF STORAGEEC1 EROSION CONTROL PLAN29 NORTH ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 EROSION CONTROL NOTES: TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: WATERFIELD CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Construction & Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Protection * Rip Rap Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Sediment Trap Rock Socks * UTILITIES INSTALLATION FLAT WORK INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Other: Any prior inlets that could use protecting Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Under slope stabilization rolled products. Reseeding may be required. 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE TO THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 20.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES AND SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 21.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 22.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 23.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 24.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 25.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 26.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 27.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 28.CONTRACTOR SHALL KEEP ALL PUBLIC STREETS SURROUNDING THE PROJECT CLEAN FROM ANY CONSTRUCTION SEDIMENT OR DEBRIS AND WILL CLEAN IT WITHIN 24 HOURS, SHOULD ANY TRACK OUT OCCUR. 29.STORMWATER QUALITY DEVICES SHALL BE CONSTRUCTED WITH THE LAST PHASE OF CONSTRUCTION. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT UNDERGROUND STORMTECH CHAMBERS FROM SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE. 30.THE SITE MUST BE SWEPT AND MAINTAINED TO PREVENT DIRT, SEDIMENT, SAW CUTTINGS, CONCRETE WASH, TRASH & DEBRIS, LANDSCAPE MATERIALS AND OTHER POLLUTANTS FROM ENTERING STORM SEWER AT ALL TIMES. DIRT, DEBRIS, AND MUD FROM CONSTRUCTION ACTIVITIES SHALL NOT BE TRACKED ON TO CITY STREETS AND ALLEYS, AND THE SITE SHALL BE CLEANED NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. IF DIRT, DEBRIS, AND MUD FROM CONSTRUCTION ACTIVITIES IS TRACKED INTO CITY RIGHT-OF-WAYS, THE DIRT, DEBRIS, AND MUD SHALL BE IMMEDIATELY CLEANED UP BY THE CONTRACTOR. 31.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 32.THE CONTRACTOR SHALL COMPLY WITH THESE NOTES AND ADDITIONAL EROSION CONTROL NOTES ON SHEETS EC3. IF THERE IS A CONFLICT, THE MORE RESTRICTIVE NOTE SHALL APPLY. PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY 1.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 2.REFER TO THE DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 3.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 4.SEE SHEET EC3 FOR ADDITIONAL EROSION CONTROL NOTES. 5.ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. GENERAL NOTES: LEGEND: SF IPINLET PROTECTION SILT FENCE VEHICLE TRACKING PAD SF CWA RSROCK SOCK CONCRETE WASHOUT AREA VTC SEEDING AND MULCHING MU CFCONSTRUCTION FENCE CF TABLE OF CALCULATIONS TOTAL DISTURBED AREA 2.65 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 2.47 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.18 ACRES TOTAL STORAGE/STAGING AREA ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A EST. PERCENT OF PROJECT AREA EXPOSED 0% EXT. PERCENT VEGETATIVE COVER ~17% EXISTING SOIL TYPE 100% TYPE C CLAY LOAM GROUNDWATER DEPTH 20 FT NUMBER PHASES W/ PROJECT N/A TOTAL VOLUME OF IMPORTED (+) / EXPORTED (-) MATERIALS (+)4589 CU. YDS. TOTAL AREA OF STOCKPILING OF ILL OR BORROW AREAS OFF SITE N/A SQ. FEET STEEPEST SLOPE 20:1 H:V DISTANCE FROM A RIPARIAN OR SENSTIVE AREA 1000 FT ~0.1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R