Loading...
HomeMy WebLinkAboutWORTHINGTON STORAGE - FDP220016 - SUBMITTAL DOCUMENTS - ROUND 3 - SITE PLANDRAWING NUMBER: ISSUED PROJECT No.: DRAWN BY: REVIEWED BY: SEAL: PREPARED BY: No.DESCRIPTION DATE REVISIONS No.DESCRIPTION DATE Plotted By: Alex Garvert Layout: C COVER PAGE Printed On: 4/26/2023 11:46 AM File Name: C COVER PAGE.dwgORIGINAL SIZE 24X36 ENTI T L E M E N T DRA WI N G S NOT F O R CON S T R U C TI O N RIPLEY DESIGN INC. Sam Coutts, PLA 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 p. 970.224.5828 f. 970.225.6657 ENGINEER APPLICANT NORTHERN ENGINEERING Robbie Lauer, PE 301 N. Howes St. Suite 100 Fort Collins, CO 80521 p. 970.221.4185 LANDSCAPE ARCHITECT 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.com STRATEGIC STORAGE PARTNERS Alan Westfall 1720 Bellair St. Denver, CO 80222 p. 303.725.1466 COVER PAGE FINAL DEVELOPMENT PLAN WORTHINGTON STORAGE 06 05 04 FDP 3 FDP 2 FDP 04/26/2023 03/08/2023 12/21/2022 06/22/2022FOR HEARING03 05/18/2022PDP02 02/23/2022PDP01 FORT COLLINS, CO AG LO R21-049 1 OF 18 * LOT 2 PARKING SHALL BE DESIGNED, REVIEWED, AND APPROVED AT TIME OF REDEVELOPMENT. LOT 1 REQUIRED PARKING CALCULATED AS FOLLOWS: 1143 SF GENERAL OFFICE @ 1 SPACE/1000 SF 89,892 SF INDOOR STORAGE (INDUSTRIAL) @ 0.5 SPACE/EMPLOYEE (ASSUMES 5 EMPLOYEES MAX) PROJECT PARKING PROVIDED REQUIRED MIN.REQUIRED MAX. PROPOSED STORAGE FACILITY STANDARD PARKING STALLS 6 2 7 HANDICAP STALLS 1 1 1 PROPOSED STORAGE FACILITY TOTAL 7 3 8 EXISTING BUILDING STANDARD PARKING STALLS 71 N/A N/A HANDICAP STALLS 7 N/A N/A EXISTING BUILDING TOTAL 78 GRAND TOTAL 85 BICYCLE PARKING PROVIDED REQUIRED BICYCLE SPACES 4 4 FLOOR AREA RATIO LOT 1 BUILDING AREA (SF)91,035 LOT AREA (SF)86,215 FLOOR AREA RATIO (LOT 1, BLOCK 1)1.06 LOT 2 BUILDING AREA (SF)19,407 LOT AREA (SF)53,349 FLOOR AREA RATIO (LOT 1, BLOCK 2)0.36 EXISTING ZONING E (EMPLOYMENT) GROSS / NET (GROSS AND NET AREAS ARE THE SAME) AREA (SF)% PROPOSED BUILDING COVERAGE 33,793 24.22 DRIVES AND PARKING (EXCLUDES PUBLIC ROW)49,228 35.28 OPEN SPACE AND LANDSCAPE (EXCLUDES PUBLIC ROW)27,781 19.91 HARDSCAPE (EXCLUDES PUBLIC ROW)9,335 6.69 EXISTING BUILDING COVERAGE 19,407 13.91 **PUBLIC STREET RIGHT-OF-WAY 0.00 0.00 HARDSCAPE 0 DRIVES AND PARKING 0 LANDSCAPE 0 TOTAL GROSS COVERAGE 139,544.00 SF (3.20 AC)100.00 AREA COVERAGE 139,544 SF (3.2AC) BUILDING HEIGHT MAXIMUM HEIGHT STORIES BUILDING A 40'-0"3 BUILDING B 13'-6"1 BUILDING C 13'-6"1 BUILDING D 13'-6"1 LAND USE CHART SITE PLAN NOTES 1.THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2.REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3.REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4.ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES. 5.ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 6.ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 7.SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 8.FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 9.ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED. 10.ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 11.COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS’ ASSOCIATION. THE PROPERTY OWNERS’ ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 12.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODORCONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS. 13.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 14.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND Revised November 12, 2015 3 LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 15.PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY-FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX-INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. WORTHINGTON STORAGE FINAL DEVELOPMENT PLAN LEGAL DESCRIPTION BEING A REPLAT OF LOT 1, CENTRE FOR ADVANCED TECHNOLOGY P.U.D, SIXTEENTH FILING, LOCATED IN THE SOUTHWEST QUARTER OF SECTION 23, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO VICINITY MAP OWNER (SIGNED)Date THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME WITNESS MY HAND AND OFFICIAL SEAL. NOTARY PUBLIC ADDRESS THIS DAY OF MY COMMISSION EXPIRES: AS . (PRINT NAME) 20 .A.D., BY THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLAN. OWNER'S CERTIFICATE Director Signature PLANNING CERTIFICATE APPROVED BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES OF THE CITY OF FORT COLLINS, COLORADO ON THIS ________ DAY OF ________, 20__. 1"=1000' Sheet List Table Sheet Number Sheet Title 1 COVER PAGE 2 OVERALL SITE PLAN 3 TREE INVENTORY AND MITIGATION 4 LANDSCAPE PLAN 5 LANDSCAPE NOTES AND DETAILS 6 LANDSCAPE NOTES AND DETAILS 7 ELEVATIONS 8 ELEVATIONS 9 ELEVATIONS 10 FIRST FLOOR PLAN 11 SECOND FLOOR PLAN 12 THIRD FLOOR PLAN 13 ROOF PLAN 14 TRASH ENCLOSURE 15 ROOF PLAN 16 ELECTRICAL PHOTOMETRIC SITE PLAN 17 ELECTRICAL CUTSHEETS 18 ELECTRICAL PRELIMINARY ONE-LINE DIAGRAM SITE W. DRAKE RD.W. DRAKE RD.S. SHIELDS ST.S. SHIELDS ST.WORTHINGTON SELF STORAGE FSFSFSFSFSFSFSFSFSUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDU D UDUDUDUDUDUDEEEEUDUDUDUDUDXXXXXX XXXX XXSTSTSTSTSTSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S SSSSSSS S SSSSSSSSSSSSSSSSSSSSSSSSSSSS SSS S S S C VAULT ELEC S S S ELEC C ELEC E D F E SW HY DHY DW C S W H2O HY DD D T CONTROL IRRWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WGEEEEEEEE EEEE EEEEGGGGGGGGGGGGXXXXXXXXCTV C T V C T V C T V C T V C T V C T V C T V CTVCT V CTV CTVT T TTTTT T T E E E EEEEEEEEVAULT F.O. 17'-5" 17'-0"9'-0" 19'-0" TRASH ENCLOSURE BIKE PARKING (5) 5'-0" WALK 24'-0" EMERGENCY ACCESS EASEMENT 24'-0" EMERGENCY ACCESS EASEMENT 4'-0" WALK STORMTECH BASIN 1 R25'-0" 23'-6" PROPOSED LOT LINE WOR T H I NG TO N C I R C L E ( 5 4 ' P U B L I C ROW ) SECURITY GATE SECURITY GATE 5'-0" 9'-0" 15'-11" 16'-0" PRIV A T E D RI V E 5 6 3 4 33'-3" 26'-0" EMERGENCY ACCESS EASEMENT 77'-2" LOT 1 BUILDING A 28,622 SF INDOOR STORAGE 3-STORY 1143 SF OFFICE EXISTING ACCESS TO REMAIN LOT 2 EXISTING BUILDING 19,407 SF 2-STORY BUILD-TO LINE 6'-0" UTILITY, DRAINAGE & ACCESS EASEMENT 12'-0" UTILITY, DRAINAGE & ACCESS EASEMENT 15'-0" UTILITY, DRAINAGE & ACCESS EASEMENT BUILDING ENTRANCE 5'-0" WALK POLE LIGHT BIKE FIX STATION CAR CHARGING STATION BUILDING B 775 SF INDOOR STORAGE 1-STORY BUILDING C 1030 SF INDOOR STORAGE 1-STORY BUILDING D 3364 SF INDOOR STORAGE 1-STORY R15'-0" PROTECTIVE BOLLARDS SIGHT DISTANCE TRIANGLES SIGHT DISTANCE TRIANGLES HYDRANT, TYP. R-TANK BASIN 1STORMTECH BASIN 2 R-TANK BASIN 4 STORMTECH BASIN 4 R-TANK BASIN 2 R-TANK BASIN 3 STORMTECH BASIN 3 G G UD UD SS SS T T E E W W LEGEND = GAS UTILITY = UNDER DRAIN UTILITY = SANITARY SEWER SERVICE UTILITY = TELEPHONE UTILITY = UNDERGROUND ELECTRIC UTILITY = WATER LINE UTILITY = PROJECT BOUNDARY = DRAINAGE OR UTILITY EASEMENT = PROPERTY BOUNDARY = STORM DRAIN UTILITY EAE = EMERGENCY ACCESS EASEMENT AE = ACCESS EASEMENT UE = UTILITY EASEMENT DE = DRAINAGE EASEMENT A, U & DE = ACCESS, UTILITY AND DRAINAGE EASEMENT D & UE = DRAINAGE AND UTILITY EASEMENT DRAWING NUMBER: ISSUED PROJECT No.: DRAWN BY: REVIEWED BY: SEAL: PREPARED BY: No.DESCRIPTION DATE REVISIONS No.DESCRIPTION DATE Plotted By: Alex Garvert Layout: L1 OVERALL SITE PLAN Printed On: 4/26/2023 11:46 AM File Name: L1 OVERALL SITE PLAN.dwgORIGINAL SIZE 24X36 ENTI T L E M E N T DRA WI N G S NOT F O R CON S T R U C TI O N RIPLEY DESIGN INC. Sam Coutts, PLA 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 p. 970.224.5828 f. 970.225.6657 ENGINEER APPLICANT NORTHERN ENGINEERING Robbie Lauer, PE 301 N. Howes St. Suite 100 Fort Collins, CO 80521 p. 970.221.4185 LANDSCAPE ARCHITECT 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.com STRATEGIC STORAGE PARTNERS Alan Westfall 1720 Bellair St. Denver, CO 80222 p. 303.725.1466 OVERALL SITE PLAN FINAL DEVELOPMENT PLAN WORTHINGTON STORAGE 06 05 04 FDP 3 FDP 2 FDP 04/26/2023 03/08/2023 12/21/2022 06/22/2022FOR HEARING03 05/18/2022PDP02 02/23/2022PDP01 FORT COLLINS, CO AG LO R21-049 0 15 30 60 SCALE: 1"=30'-0" 2 OF 18 NORTH