Loading...
HomeMy WebLinkAboutVERIZON FTC LADY MOON WIRELESS TELECOMMUNICATIONS EQUIPMENT - BDR230005 - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATIONCOMMERCIAL SERVICE INFORMATION FORM (C-1) City of Ft. Collins Electric Utility  700 Wood St.  P.O. Box 580  Ft. Collins, CO 80522 (970)221-6700 or fax (970)221-6619 Service voltages available are (not all voltages are available at all locations):  120/240 V. 1 phase, 3 wire  120/208 V. 3 phase, 4 wire  120/208 V. 1 phase, 3 wire (network)  277/480 V. 3 phase, 4 wire  Primary 13,200 V. Grd Y /7620  120/240 V. 3 phase, 4 wire (special utility permission required) For CT’d meters, Light and Power will provide the meter socket and CT’s to the electrical contractor. CT’s cannot be placed in the transformer, but may be located in a building mounted cabinet (provided by owner) or in the owner’s switchgear. In no case, can meters be mounted on the transformer. • Cold sequencing is required for all commercial services that are direct metered. • If CT’d metering, the owner must provide and install a - 1” conduit from the CT location to the electric meter. +Please complete the following completely and legibly: Date Submitted: _____________________________________ Voltage Requested: _____/_____  1 phase OR  3 phase Building Main (not fuse) Size: ____________________ Amps Number of Conduits: _______ Size of Conduits:_________ Number of Cables: ________ Size of Cables: ___________ Electric Heat:  Yes _________kW  No Business Name: ____________________________________ Site Address: ______________________________________ Owners Name: _____________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ General Contractor: _________________________________ Individual: _________________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ Electrical Contractor: ________________________________ Mail Address: ______________________________________ City: ______________________________________________ State & Zip: ________________________________________ Phone: ____________________________________________ Firm: ______________________________________________ Number of CT’d meters: __________ at ___________Amps each Number of Self-Contained meters: _____ at ________Amps each Largest Motor: ________ H.P. 1 Phase __________ H.P. 3 Phase Will any generating system (including photo-voltaics) be installed?  Yes (contact utility for requirements)  No If Yes, this will be for:  emergency service  parallel generation Will a fire pump be installed? □ Yes □ No Form Completed by: Name: ________________________________________________ Company:_____________________________________________ Mail Address: _________________________________________ City: _________________________________________________ State & Zip: ___________________________________________ Phone: _______________________________________________ For Office Use Only Transformer Size: ____________________kVA Fault Current at Transformer: _______________________Amps 1st 50% - Control # _______________ Paid Date: _____________ 2nd 50% - Control # ______________ Paid Date: _____________ 100% Const./Energize - Cont. # _________ Paid: _____________ A.T.E. Date: _____________________ Engineering Approval by: ______________ Date: _____________ Metering Approval by: ________________ Date: _____________ WORD\DATA\FORMS\C-1.DOC REV.March 6, 2014 (E) 500KVA TRANSFORMER PAD MOUNT 277/480V, 3Ø, 4W Isc = 33,400 NEW 200A/2P DISCONNECT SWITCH W/ 200A RK5 FUSES LABEL "SERVICE DISCONNECT" NEW #4 COPPER TO GROUND ROD - BOND TO NEUTRAL NEW 3 #3/0, 1 #4G, 2"C (5 L.F.) NEW 3 #3/0, 1 #4G, 2"C (10 L.F.) NEW #4 COPPER TO GROUND ROD -DO NOT BOND TO NEUTRAL NEW ILC W/ 200A/2P ATS, (2) 200A MCBs & PANELBOARD "LA" FOR EQUIPMENT CABINET NEW 1Ø UTILITY METER 480V NEW GEN PLUG NEW 3 #3/0, 1 #4G, 2"C NEW 3 #3/0, 2"C (25 L.F.) M Isc = 11,740 Isc = 7,983 Isc = 31,730 NEW 3 #3/0, 1 #4G, 2"C (205 L.F.) 50KVA TRANSFORMER PAD MOUNT 120/240V, 1Ø, 3WNEW 200A/2P DISCONNECT SWITCH W/ 200A RK5 FUSES LABEL "SERVICE DISCONNECT" NEW #4 COPPER TO GROUND ROD - BOND TO NEUTRAL NEW 3 #3/0, 1 #4G (10 L.F.) FAULT CALCULATIONS = 0.05f= = 0.95M= 1.732 x 25FT x 33400A 4 x 13923 x 480V 1 1 + 0.05 Isc=0.95 x 33400A = 31730 AIC A. SERVICE = 1.69f= = 0.37M= 1.732 x 205FT x 31730A 13923 x 480V 1 1 + 1.69 Isc= 0.37 x 31730A = 11740 AIC B. FEEDER = 1.95f= = 0.34M= 1.732 x 11740 x 480V 50 x 100,000 1 1 + 1.95 Isc=0.34 x 11740A x = 7983 AIC C. TRANSFORMER 480 240 -1 ONE LINE DIAGRAM VERIZON WIRELESS SERVICES 3131 S. VAUGHN WAY, SUITE 550 AURORA, CO 80014 HYBRID & COAX CABLESFIBERBBU/RRHMW/FIBER EQ.POWER/GROUNDINGOVP/ELEC. EQ.GEN. CONST./UTILITY EASEMENTACCESS/UTILITY EASEMENTEXISTING EASEMENTLEASE AREAANTENNASPENETRATIONSPROJECT INFORMATION 5935 SOUTH ZANG STREET, SUITE 280 LITTLETON, COLORADO 80127 OFFICE: 303.932.9974 SITE NAME CONSULTANT 1st REVIEW 2nd REVIEW NOT FOR CONSTRUCTION GARY CAWTHORNE, P.E. GAC ENGINEERING, LLC. 9781 WESTBURY WAY HIGHLANDS RANCH, CO 80129 PHONE: 303.810.4010 E3.00 PANEL SCHEDULE & ONE LINE DIAGRAM FTC LADY MOON SGP SOB 3528 PRECISION DR. FORT COLLINS, CO 80528 -2 NOT USED