Loading...
HomeMy WebLinkAboutVERIZON FTC LADY MOON WIRELESS TELECOMMUNICATIONS EQUIPMENT - BDR230005 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPlanning Objectives Verizon is a leading provider of wireless communications. To improve wireless service along Lady Moon Drive in Ft. Collins Verizon is proposing to install a new wireless facility located at 3528 Precision Drive. Verizon through its agent Powder River Development Company and with the full cooperation of the property owner (3528 Precision – FC LLC), are proposing to construct a new wall mounted wireless communications facility. The proposed facility consists of: • (9) NEW VERIZON WIRELESS ANTENNA IN (3) NEW ANTENNA SCREENS MOUNTED TO WALL • NEW VERIZON WIRELESS EQUIPMENT MOUNTED TO NEW H-FRAMES WITHIN SCREENS ON EXISTING ROOF • NEW OUTDOOR EQUIPMENT CABINETS ON ROOF WITHIN SCREENED ENCLOSURE • NEW ELECTRICAL AND FIBER SERVICE ROUTED UNDERGROUND & THRU BUILDING The antennas will be screened with RF transparent material and painted to match the exterior of the building. Please refer to the enclosed Photo Sims. The installation of the antennas on the exterior of the building is necessary to ensure the site meet’s Verizon’s service objectives. The installation has been carefully sited and designed to blend in as much as possible and minimize impacts to the surrounding properties. The proposed installation has been reviewed and approved by the Harmony Technology Park Design Review Committee. Additional color samples have been provided. Please refer to the enclosed material photo. To house related equipment Verizon will install a new 2-bay equipment cabinet on the roof of the building adjacent to the existing mechanical enclosure. The cabinets will not be visible from the ground. No additional ground equipment is necessary. Utilities will be placed underground within a new utility easement. Access signage has been added at the request of the Fire Authority. Please refer to the attached Site Plans. The facility is unmanned and does not require water or sewer service. Once operational, the facility will be maintained with regular visits once or twice per month by a Verizon technician. No additional traffic will be generated due to the facility and no improvements to the ROW are proposed. The new facility is in full compliance with City of Fort Collins Land Use Code