HomeMy WebLinkAboutPOWERHOUSE 2 - FDP220015 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (2)G UGEUGE UGE UGE
UGES UD
UD
UD
UD UD
UD UDUDUDUD
UD
UD
UD
UD
UD
UD
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEVAULT
ELEC
GGGVAULT
ELEC
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
ELEC
T
VAULT
F.O.F.O.
D
CONTROL
IRR
CONTROL
IRR
GAS
ELEC
BRKR
T SGGGGGGGG
GGGGGGGGGGGGGGGXOHUOHUD FE
SGGGG
G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / /
/
/
// / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE
S
FE
S
FE
SST
STST
STST
STFESFESFES
VAULT
ELEC
GAS
/ / / / / / / /D GCTV CTV CTV CTV CTVGGGGG
CTV CTV CTV CTV CTV CTV CTV
CTV
VAULT
CABLE
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
EM
GMTFTF
SFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFEAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE
C
A
N
A
L
JEROME STREET LLC,
216 E OAK ST
JEROME STREET STATION LLC,
742 N COLLEGE AVE
LMC VENTURES LLC,
742 N COLLEGE AVE
CITY OF FORT COLLINS
405 N COLLEGE AVE
MORAK KAREN LLC
622 N COLLEGE AVE
CITY OF FORT COLLINS,
740 N COLLEGE AVE
DETENTION
POND
25:17:18:127:142:138:166:145:135:173:174:177:
1
29:1
48:149:14:16:122:124:1
17:1
21:1 11:16:11
1
2
:
15:165:152:1SF
SFRAIN GARDEN 1
SEE SHEET RG1
SOUTH RAIN GARDEN 1
SEE SHEET RG2
SOUTH RAIN GARDEN 2
SEE SHEET RG2
SOUTH RAIN GARDEN 3
SEE SHEET RG2SFSF
SF
SF
SF SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SFCF
CF
CF
CF CF
CF
CF
CF
C
F
CF CF
CF
CF
CF
CF
CF
CF
CF
CF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFCF
CF
CF
CF
CF
CF
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD
LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LOD LOD LODLODLODLODLOD LODLODLODLODLODLODLODLODLODNORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
ROCK SOCK
SCOUR-STOP
WATTLE DIKE
CONCRETE WASH AREA
BALE OUTLET PROTECTION
LEGEND:
INLET PROTECTION
VEHICLE TRACKING CONTROL PAD
SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37
EC2INTERIM EROSION CONTROL PLAN37
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
AREA INLET PROTECTION
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Project: POWERHOUSE 2
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
STRUCTURAL "INSTALLATION"
Silt Fence Barriers *
Flow Barriers (Wattles) *
Inlet Filter Bags *
Vegetative
Temporary Seeding Planting
Mulching / Sealant
Permanent Seeding Planting
Sod Installation
Rolled Products : Netting / Blankets / Mats
Contour Furrows (Ripping / Disking)
Rock Bags *
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
Vehicle Tracking Pad *
* All Temporary BMPs to be Removed once Construction is Complete
Any prior inlets that
could use protecting
Anytime the site will sit dormant longer than 30 Days
Anytime the site will sit dormant longer than 30 Days
Anytime the site will sit dormant longer than 30 Days
Riprap
Construction Fence*
EROSION CONTROL NOTES:
1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR.
STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT
BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE
CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES.
2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR
ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND
COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT
HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE
CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS
FULLY STABILIZED.
6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM
DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e.,
STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP
MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING
MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM
MIGRATING ONTO AND ENTERING THE RAIN GARDEN SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY
STABILIZED.
10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THE BUILDING PAD IS
STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND THE BUILDING PAD SIDES TO
ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE.
PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION
(i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER,
WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET
IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED
INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY.
13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL
BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES
MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR
BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE
GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY
CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE
INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING
OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS
APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER
PERMANENT SITE STABILIZATION METHODS.
17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND
CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR.
18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM.
19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND
DIRT FROM ANY SOURCE FROM ENTERING THE RAIN GARDEN SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON
THE RAIN GARDEN AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE RAIN GARDEN AREA.
TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT
OF SEDIMENT RUN-ON TO THE RAIN GARDEN.
CONSTRUCTION FENCE CF
STAGING AREA
BENCHMARK/BASIS OF BEARING:
1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY
CRIMP MULCHING OR SIMILAR METHODS.
2.SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone ________________________________
3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE
WASHOUT AREA IF ACCESS IS OFF PAVEMENT.
4.REFER TO THE FINAL DRAINAGE REPORT BY NORTHERN ENGINEERING FOR
ADDITIONAL INFORMATION.
5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A
NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE
FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE.
GENERAL NOTES:
BENCHMARK: #1
CITY OF FORT COLLINS BENCHMARK 1-00
Elevation=4968.74
BENCHMARK: #2
CITY OF FORT COLLINS BENCHMARK 3-13
Elevation=4962.27
Basis of Bearings
The Basis of Bearings is the West line line of the Southwest Quarter of
Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing)
and monumented as shown on Plat.
IRRIGATED TURF
NATIVE SEED
LIMITS OF DISTURBANCE LOD
SILT FENCE SF