Loading...
HomeMy WebLinkAboutDocument Markups - Utility Plan - 04/28/2023E. VINE DRIVEN. COLLEGE AVENUECHERRY STREET CAC H E L A P O U D R E R I V E R SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 CS1 COVER SHEET1 MARCH 2023 CONTACT INFORMATION PROJECT TEAM: VICINITY MAP NORTH PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-00 ON A CATCH BASIN AT THE SOUTHEAST CORNER OF VINE DR. AND COLLEGE AVE. ELEV.=4968.74 CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN ST. BRIDGE OVER THE POUDRE RIVER, ON THE WEST SIDE OF LINDEN ST. , ON A STORM INLET. ELEV.=4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE WEST LINE LINE OF THE SOUTHWEST QUARTER OF SECTION 1-7-69 AS BEARING SOUTH 00° 38' 34" WEST (ASSUMED BEARING) AND MONUMENTED AS SHOWN ON PLAT. PROJECT BENCHMARKS: POWERHOUSE 2 PROJECT TEAM: Roger Sherman BHA Design Incorporated 1603 Oakridge Drive, Suite 100 Fort Collins, Colorado 80525 (970)223-7577 Colorado State University Bryan Willson Executive Director, CSU Energy Institute 450 N College Ave. Fort Collins, CO 80524 (970)227-5164 Northern Engineering Services, Inc. Andy Reese 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT OWNER/APPLICANT SITE ENGINEER SHEET INDEX A PARCEL OF LAND LOCATED IN THE SOUTHWEST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SITE SURVEYOR TYPICAL SECTIONS 1 CS1 COVER SHEET 2 CS2 GENERAL & CONSTRUCTION NOTES 3 CS3 EROSION CONTROL NOTES 4 EX1 EXISTING CONDITIONS & DEMOLITION PLAN 5 PV1 PAVING & SIGNAGE PLAN UTILITY SHEETS 6 OU1 UTILITY PLAN SANITARY SHEETS 7 SS1 OFFSITE SANITARY SEWER PLAN & PROFILE 8 SS2 SANITARY SEWER B PLAN & PROFILE STORM SHEETS 9 ST1 POND OUTFALL PLAN & PROFILE 10 ST2 STORM DRAIN C PLAN & PROFILE 11 ST3 STORM DRAIN D PLAN & PROFILE GRADING SHEETS 12 OG1 OVERALL GRADING PLAN 13 - 14 G1 - G2 GRADING PLAN RAIN GARDEN SHEETS 15 RG1 NORTH RAIN GARDEN PLAN & DETAILS 16 RG2 SOUTH RAIN GARDEN PLAN DETAIL SHEETS 17 - 21 D1 - D5 SITE DETAILS 22 - 24 D6 - D8 UTILITY DETAILS 25 - 30 D9 - D14 DRAINAGE DETAILS DRAINAGE SHEETS 31 EC1 INITIAL EROSION CONTROL PLAN 32 EC2 INTERIM EROSION CONTROL PLAN 33 EC3 FINAL EROSION CONTROL PLAN 34 - 35 EC4 - EC5 EROSION CONTROL DETAILS 36 DR1 DEVELOPED DRAINAGE EXHIBIT 37 FP1 FLOODPLAIN EXHIBIT FINAL CONSTRUCTION PLANS FOR E N G I N E E R N GI EHTRON R N E N G I N E E R N GI EHTRON R N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R PROJECT LOCATION UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER APPROVED: City Engineer:Approved Sheets Date Water & Wastewater Utility Approved Sheets Date Stormwater Utility Approved Sheets Date Park Planning and Development Approved Sheets Date Traffic Operations Approved Sheets Date Environmental Planner Approved Sheets Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: Field Survery: Northern Engineering Services, Inc. Date: October 25, 2019 FIELD SURVEY BY: These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CTL Thompson, Inc Geotechnical Investigation Proposed Improvements Powerhouse 2 Project No. FC10223-125 Date: March 14, 2022 SUBSURFACE EXPLORATION BY: Travel 69' ROW (min.) 42' Roadway 5' Walk (min.)(min.) Pkwy. 8.5' Pkwy. 5' (min.) 8.5' 11' Util. Esmt. 9' Esmt. Util. 9' (min.) Walk Travel 11' 7' Lane Bike 3'7' Lane Bike 3' Bike Lane Buffer Bike Lane Buffer 2 LANE ARTERIAL w/ PARALLEL PARKING (EAST VINE DRIVE) 2 LANE COLLECTOR (JEROME STREET) (min.) Walk 84' ROW (min.) 52' Roadway 7' Pkwy. 6' (min.) 8' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer Bike Lane Buffer Lane Bike (min.) Walk 84' ROW (min.) 52' Roadway 7' Walk (min.) (min.) Pkwy. 10' Pkwy. 6' (min.) 10' Util. Esmt. 15' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer 6' Bike Lane Buffer Lane Bike 8' Parallel Parking (min.) Walk Pkwy. 6' (min.) 8' Esmt. Util. 15' 8' Parallel Parking 2 LANE ARTERIAL (EAST VINE DRIVE) Pedestrain Access Easement Pedestrain Access Easement LAKE CANAL GAS-----------------Xcel Energy-----------------------------Cory Thelen (970) 225-7843 ELECTRIC--------City of Fort Collins Light & Power--Cody Snowdon (970) 416-2306 CABLE-------------Comcast----------------------------------Don Kapperman (970) 567-0425 TELECOM.--------Lumen-------------------------------Brady Craddock (970) 342-3431 WATER------------City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 WASTEWATER--City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 STORMWATER-City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 UTILITY PLAN APPROVAL BOXELDER SANITATION DISTRICT CACHE LA POUDRE RESERVOIR COMPANY UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT S D S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSSS VAULT ELEC GGGSSSSSSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC ELEC WHYD ELEC ELEC VAULT ELEC C SW CS VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC ELEC ELEC M ELEC VAULT ELEC HY DT T T VAULT F.O. VAULT F.O.F.O. MMWSOMWSO D CONTROL IRR CONTROL IRR util GAS util E ELEC BRKR M T S XXXXXXXXXXXXXXXXXXXXW W W W W W W W W W W W W W W W W WEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGGGGGGWWWWWWWWWFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOTTTTTT T T T T T TTTTTT T T T T T T T T T T T T T T T T T T T T TXXTT WWWWWWW W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOXXXXXEEEEEEGGGGGGGWWT T TEEE WEEE E EEEEEEEEE EEEEEWWWGGGFO FO FOFOE G G W ETOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU OHU OHU OHU GGGGGGGXE WWSWO WSSS SSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSOHUOHUD FE SGGGG G STSTSTSTE E E E E/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST STFESFESFESST ST ST ST ST XXVAULT ELEC GASSSSS / / / / / / / /S D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR R1 R1 R1 R1 R1 R1 R2 R2 R2 R2 R2 R2 R2 R3 R3 R3 R3 R3 R3 R3 R4 R4 R4 JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE LAKE CANAL COMPANY EASEMENT LAKE CANAL EASEMENT PER REMOVE EXISTING MAIL BOX REMOVE EXISTING MAIL BOX REMOVE & RESET EXISTING PEDESTAL TELE. REMOVE & RELOCATE EXISTING PEDESTAL (TELE.) REMOVE AND RELOCATED EXISTING FIRE HYDRANT 30" FROM PROPOSED TOP BACK OF CURB OR RAMP REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE EX-STORM LINE (CONTRACTOR TO VERIFY EXISTENCE AND LOCATION) REMOVE EXISTING SIGN REMOVE STRUCTURE REMOVE BOLLARDS REMOVE BOLLARDS REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS AND STEEL CABLE REMOVE BOLLARDS REMOVE BOLLARD REMOVE BOLLARDS REMOVE CONCRETE WALL REMOVE CONCRETE WALL REMOVE CONCRETE WALL REMOVE TIMBER WALL REMOVE CONCRETE WALL REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE EXISTING FENCE REMOVE UNDERGROUND TELE. UTILITY REMOVE & RELOCATE EXISTING PEDESTAL. REMOVE & RELOCATE EXISTING PEDESTAL (CABLE.) REMOVE PROPANE TANK REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING WATER SERVICE REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING WATER SERVICE (SEE NOTE 4) REMOVE EXISTING METER PIT. (SEE NOTE 4) REMOVE APPROXIMATELY 165' OF EXISTING CURB & GUTTER REMOVE EXISTING METER PIT (SEE NOTE 4) REMOVE EXISTING WATER SERVICE (SEE NOTE 4) EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE PROTECTED EXISTING TREE TO BE REMOVED REMOVE EXISTING SIGN REMOVE EXISTING 12" Ø STUMP EXISTING 30' GAS LINE EASEMENT -REMOVE AND REPLACE EXISTING MANHOLE. WITH A 4' DIAMETER MANHOLE -ABANDON & FLASH FILL EXISTING SANITARY MAIN THROUGH LAKE CANAL EASEMENT. -BEGIN REMOVE 12" SEWER LINE SOUTH OF LAKE CANAL EASEMENT. REMOVE UNDERGROUND ELECTRIC UTILITY REMOVE & RE-USE EXISTING STREET LIGHT EXISTING 10' UTILITY EASEMENT EXISTING 10' UTILITY EASEMENT EAST VINE DRIVE JEROME STREETNORTH COLLEGE AVENUELAKE C A N A L SAN MH RIM=4963.99 INV IN=4956.45 (NW) INV OUT=4955.88 (S) EX-SANITARY MH RIM=4961.65 INV IN=4955.31 (NW) INV OUT=4955.27 (S) STORM MH IN BOX RIM=4966.73 INV OUT=4961.91 REMOVE EX- STORM INLET RIM=4961.82 INV OUT=4959.79 (E) REMOVE EX-STORM INLET RIM=4961.02 INV IN=4959.36 (W) INV OUT=4959.20 (E) REMOVE EX-STORM INLET RIM=4959.91 INV IN=4958.52 (W) INV OUT=4958.46 (S) EX-STORM MH (TO REMAIN) RIM=4960.31 INV IN=4957.42 (N) INV OUT=4958.42 (SE) SNOUT OPENING BTM=4953.00 WATER ELEV=4957.23 EX-SANITARY MH RIM=4961.63 INV IN=4955.49 (N) INV OUT=4955.31 (SE) REMOVE & REPLACE EX-INLET BOX w/SUMP & SNOUT EXISTING UTILITY EASEMENT TO BE VACATED REMOVE EXISTING LIGHT REMOVE EXISTING LIGHT REMOVE EXISTING FENCE EX SSMH RIM 4964.0 ± INV. IN 4958.97 (N) INV. OUT 4958.77 (S) EX SSMH RIM 4964.5 ± INV. IN 4957.66 (N) INV. OUT 4957.48 E) 60' CANAL EASEMENT EXISTING 30' GAS LINE EASEMENT EXISTING GAS LINE REMOVE & RE-USE EXISTING STREET LIGHT REMOVE & RE-USE EXISTING STREET LIGHT REMOVE & RE-USE EXISTING STREET LIGHT EDGE OF PROPOSED SAW CUT EXISTING CURB, GUTTER,TO BE REMOVED AND REPLACED EDGE OF PROPOSED SAW CUT REMOVE EX-STORM LINE (CONTRACTOR TO VERIFY EXISTENCE AND LOCATION) 12" SEWER MAIN (LINED) REMOVE APPROXIMATELY 271' OF EXISTING 12" SEWER MAIN. CAP REMAINING 12" LINE FOR PROPOSED SANITARY SERVICE TIE IN. SEWER MAY NOT BE REMOVED IN ANY WAY UNTIL THE PROPOSED OFFSITE SEWER MAIN IS CONSTRUCTED AND ACCEPTED BY THE WATER UTILITY REMOVE EXISTING LIGHT END REMOVAL OF 12" SEWER LINE. CAP REMAINING LINE FOR PROPOSED SANITARY SERVICE TIE IN REMOVE & REPLACE EX - 18" FES & 18" STORM LINE EX - 18" FES FL ELEV. = 4956.64 EX-SANITARY MH RIM=4963.47 INV IN=4957.95 (S) SERVICE INV IN=4959.56 (N) INV OUT=4956.28 (E) EX-SANITARY MH RIM=4960.52 INV IN=4955.14 (W) INV IN=4955.20 (N) INV OUT=4955.12 (E) EXISTING ELCO WATER MAIN EXISTING 6" CITY OF FORT COLLINS WATER MAIN REMOVE EXISTING LIGHT REMOVE EXISTING STREET LIGHT REMOVE & REUSE EXISTING STOP SIGNREMOVE & RELOCATE EXISTING ELECTRICAL BOX 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) REMOVE & RELOCATE EXISTING F.O. VAULT REMOVE EXISTING DEAD TREE EDGE OF PROPOSED SAW CUT FOR IRRIGATION TAP & METER CONSTRUCTION APPROXIMATELY 25' OF EXISTING CURB & GUTTER & 250 SF OF CURB RAMP TO BE REMOVED AND REPLACED REMOVE APPROXIMATELY 75' OF EXISTING CURB & GUTTER REMOVE APPROXIMATELY 21' OF EXISTING CURB & GUTTER EDGE OF PROPOSED SAW CUT FOR WATER & FIRE SERVICE REMOVE & REPLACE ±125' OF EXISTING 12" VCP SANITARY PIPE UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE EXISTING ELEC. BREAKER AND ELEC. BOX TO BE PROTECTED REMOVE AND RELOCATED EXISTING BUS SIGN EXISTING BIKE LANE SIGN TO BE PROTECTED REMOVE AND REPLACE EXISTING MANHOLE. WITH A 5' DIAMETER MANHOLE EXISTING SERVICES (TO REMAIN) NEED TO BE DYE TESTED AND TAP LOCATION(S) FOR 620 N COLLEGE CONFIRMED. THIS SHOULD BE DONE BY CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION. EXISTING CURB, GUTTER,TO BE REMOVED AND REPLACED SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EX1 DEMOLITION PLANEXISTING CONDITIONS &4 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 R1 STRUCTURE (HOUSE, BARN, SHED & SILO) TO BE REMOVED & DISPOSED OF OFF SITE, ACCORDING TO ALL LAWS & REGULATIONS. FENCE TO BE REMOVED AND DISPOSED OF OFF SITE. OVERHEAD UTILITIES & POLES SHALL BE REMOVED, & RELOCATED. COORDINATE WITH UTILITY OWNER PRIOR TO REMOVAL. GAS SERVICE SHALL BE REMOVED & DISPOSED OF OFF SITE. COORDINATE WITH UTILITY OWNER PRIOR TO REMOVAL. PROJECT DEMOLITION NOTES R2 R3 NORTHERN ENGINEERING DATED: OCTOBER 25, 2019 FIELD SURVEY BY: R4 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.EXISTING WATER AND WATER SEWER SERVICES SHALL BE REMOVED OR ABANDONED AT THE MAIN PER CITY REQUIREMENTS. 5.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. EXISTING OVERHEAD UTILITY APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL PROPOSED SAWCUT APPROXIMATE AREA OF GRAVEL/DIRT REMOVAL OHU CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSSS VAULT ELEC GGGSSSSSSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELECHYD ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T S W W W W W W W W W W W W W W W W W WEEEEEEEEEEEEEEEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGGGGGGWWWWWWWWWFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOTTTTTT T T T T T TTTTTT T T T T T T T T T T T T T T T T T T T T T T T WWWWWWW W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOGGGGGGGEEEEEFO FO FOFO GGGGGGGXE WWSWO WSSSSSSSSSSSSSSOHUOHUD FE SGGGG G E E E E E/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST STFESFE S FE SVAULT ELEC GASSSSS / / / / / / / /S D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR EM GMTFTF G UGEUGE UGE UGE UGES IRFWUD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEEXISTING 30' GAS LINE EASEMENT EXISTING 30' UTILITY & DRAINAGE EASEMENT PROPOSED 30' LAKE CANAL EASEMENT 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 30' CANAL EASEMENT PER BRUSH MOBILE HOME P.U.D. 24.1' CITY TRAIL & UTILITY EASEMENT 15' CITY TRAIL & UTILITY EASEMENT POND OUTFALL A SEE SHEET ST1 PROPOSED BUILDINGNORTH COLLEGE AVENUEJEROME STREETPROPOSED 6" FIRE CONNECTION PROPOSED 3" WATER SERVICE AND METER PIT LAKE C A N A L 15' UTILITY EASEMENT JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CONNECT TO EXISTING GAS LINE PROPOSED GAS SERVICE & METER PROPOSED POND OUTLET STRUCTURE A TYPE D INLET CITY OF FORT COLLINS, 740 N COLLEGE AVE EXISTING 6" WATER EXISTING ELCO WATER MAIN PROPOSED BUS STOP EXISTING 21" SANITARY SEWER EXISTING 21" CLAY SANITARY SEWER EXISTING 8" WATER EXISTING FIRE HYDRANT PROPOSED 10' TRAIL EXISTING 8" WATER EXISTING 21" SANITARY SEWER EXISTING SANITARY SERVICE PROTECT IN PLACE EXISTING 10" CLAY, LINED SANITARY SEWER EXISTING 18" STORM EXISTING 24" STORM EAST VINE DRIVE PROPOSED 4' CURB CUT PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER PROPOSED TYPE R INLET PROPOSED 4' SANITARY MANHOLE EXISTING 12" SANITARY MAIN TO CONVERT TO SEWER SERVICE WITH THIS DEVELOPMENT CONNECT TO EXISTING 8" WATER MAIN. 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE)15' UTILITY EASEMENT15' UTILITY EASEMENT PROPOSED ROW TIE INTO EXISTING ELECTRICAL VAULT PROPOSED SCOUR-STOP PROPOSED SCOUR-STOP PROPOSED FH ASSEMBLY PROPOSED 1.5" IRRIGATION TAP PROPOSED 1.5" IRRIGATION METER PROPOSED ELECTRICAL TRANSFORMERS NATURAL HABITAT BUFFER ZONE NATURAL HABITAT BUFFER ZONE LAKE C A N A L C E N T E R L I N E EMERGENCY ACCESS GATE 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) VAULT F.O. RELOCATE EXISTING F.O. VAULT TO PKWY PROPOSED TYPE R INLET W/SNOUT & SUMP APPROXIMATELY 12' OF 12" PVC SLEEVE DRAINAGE EASEMENT (WIDTH VARIES) DRAINAGE EASEMENT (WIDTH VARIES) 5.15' DRAINAGE EASEMENT DRAINAGE EASEMENT (WIDTH VARIES) PROPOSED 30' UTILITY EASEMENT PROPOSED SCOUR-STOP PROPOSED UNDERDRAIN PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY CONNECTION TO VCP 15' UTILITY EASEMENT 20' UTILITY AND DITCH PERMANENT EASEMENT (ANDERSON WHITEWATER PLAT) RAIN GARDEN 1 SEE SHEET RG1 PROPOSED UNDERDRAIN PROPOSED 6" FIRE SERVICE STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 15.17 LF 10" HDPE @ 0.50% 12.52 LF 12" HDPE @ 0.50% 40.79 LF 12" HDPE @ 0.50% 47.01 LF 12" HDPE @ 0.50% 7.45 LF 12" HDPE @ 0.50% 26.16 LF 12" HDPE @ 0.50% 34.19 LF 12" HDPE @ 0.50% 13.62 LF 12" HDPE @ 0.50% 12.57 LF 15" HDPE @ 0.50%45.73 LF 10" HDPE @ 0.50% 15.74 LF 10" HDPE @ 0.50% 7.45 LF 15" HDPE @ 0.50% 106.41 LF 15" HDPE @ 0.50% 11.96 LF 10" HDPE @ 0.50% 48.23 LF 15" HDPE @ 0.50% STORM DRAIN C SEE SHEET ST3 SANITARY SEWER B SEE SHEET SS2 OFF SITE SANITARY SEWER SEE SHEET SS1 EXISTING GAS LINE 16.88 LF 15" HDPE @ 0.50% ROOF DRAIN CONNECTION E4 INV. IN=4965.87 (W) INV. OUT=4965.88 (E) ROOF DRAIN CONNECTION E3 INV. IN=4965.80 (W) INV. OUT=4965.80 (E) ROOF DRAIN CONNECTION E2 INV. IN=4965.57 (W) INV. OUT=4965.57 (E) ROOF DRAIN CONNECTION E1-7 INV. IN=4965.32 (E) INV. OUT=4965.32 (W) ROOF DRAIN CONNECTION E1-5 INV. IN=4965.02 (E) INV. OUT=4965.02 (W) ROOF DRAIN CONNECTION E1-1 INV. IN=4964.40 (E) INV. OUT=4964.40 (W) FES E INV. IN=4963.19 (S) DRAIN BASIN E5 (10'' Ø) E5 INV. OUT=4965.95 (E) DRAIN BASIN E1 (18'' Ø) INV. IN=4965.51 (W) INV. IN=4964.16 (E) INV. OUT=4963.72 (N) ROOF DRAIN CONNECTION E1-2 INV. IN=4964.46 (E) INV. OUT=4964.46 (W) DRAIN BASIN E1-10 (12'' Ø) INV. OUT=4965.66 (W) DRAIN BASIN E1-9 (15'' Ø) INV. IN=4965.53 (E) INV. OUT=4965.53 (N) DRAIN BASIN E1-3 (18'' Ø) INV. IN=4964.75 (S) INV. OUT=4964.50 (W) DRAIN BASIN E1-6 (12'' Ø) INV. IN=4965.08 (E) INV. OUT=4965.08 (W) DRAIN BASIN E1-4 (15'' Ø) INV. IN=4964.81 (E) INV. OUT=4964.81 (N) DRAIN BASIN E1-8 (15'' Ø) INV. IN=4965.49 (S) INV. OUT=4965.49 (W) FES F INV. IN=4960.50 (NW) FES F1 INV. OUT=4960.58 (SE) INLET G1 INV. OUT=4958.48 (S) 4.24 LF 12" HDPE @ 0.50% FES G INV. IN=4958.46 (N) UPHAM FREDERICK M KUNDLA TODD J 209 E. VINE DRIVE PROPOSED 88.5' ROW ELECTRIC METER STORM DRAIN G STORM DRAIN F STORM DRAIN E PROPOSED UNDERDRAIN CONNECT UNDERDRAIN TO STORM DRAIN C CONNECT TO EXISITNG OVAL VAULT INTERCEPT EXISTING ELECTRICAL LINE CONDUIT ACROSS VINE. 5.15' DRAINAGE EASEMENT PROPOSED FORBAY SEE SHEET D11 EXISTING SANITARY MANHOLE TO BY REPLACE WITH A 5' MANHOLE RELOCATED FIRE HYDRANT 30" FROM TOP BACK OF CURB OR RAMP EXISTING ELCO FoCO ELEC. EXISTING 12" VCP SANITARY SEWER EXISTING 12" VCP SANITARY SEWER PROPOSED UNDERGROUND ELECTRICAL LINE PROPOSED OVERFLOW SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 OU1 UTILITY PLAN6 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS UTILITIES WATER AND WASTEWATER DESIGN CRITERIA MANUAL. 3.ALL SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS SANITARY SEWER DESIGN TECHNICAL CRITERIA MANUAL, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.ALL WATERLINES SHALL HAVE A MINIMUM OF 4.5' AND MAXIMUM OF 5.5' WATER LINE COVER FROM FINISHED GRADE TO TOP OF PIPE. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 9.ALL MANHOLE RIM ELEVATIONS (EXISTING & PROPOSED) ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 10.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11.APPLICANT AND STAFF HAVE DETERMINE AN IMPROVEMENT OF THE EXISTING SEWER LINE THAT WOULD HAVE LESS IMPACT ON EXISTING FACILITIES INCLUDING OPTIONS THAT WOULD REDUCE THE TOTAL LENGTH OF THE NEW 12” PVC PIPE. IT HAS BEEN INCORPORATED IN THE FINAL DESIGN. EXISTING LOT LINE EASEMENT LINE SPROPOSED SEWER SERVICE WPROPOSED WATER SERVICE EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPERTY BOUNDARY EXISTING TELEPHONE PEDESTAL PROPOSED STREET LIGHT W SS PROPOSED LOT LINE PROPOSED ROW EXISTING ROW EXISTING CABLE CTV PROPOSED UNDERDRAIN UD PROPOSED UNDERGROUND ELECTRICAL UGE UGE SWALE FLOW LINE PROPOSED LANDSCAPING ROCK & ROCK WALL NATURAL HABITAT BUFFER ZONE (NHBZ) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R FDC S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSWWWWWWWWEEEEEE FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T WWW W W W W W W W FO FO FO FO FO FO FO FOGGGG XXE WWSWO S S/ / / / / / / /D GCTV CTV CTV CTV CTV G G G G G CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEEAST VINE DRIVE EX-SANITARY MH RIM=4961.65 INV IN=4955.31 (NW) INV OUT=4955.27 (S) EX - 18" FES FL ELEV. = 4956.64 EX-SANITARY MH RIM=4960.52 INV IN=4955.14 (W) INV IN=4955.20 (N) INV OUT=4955.12 (E) UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE POND OUTFALL A SEE SHEET ST1 EXISTING 6" WATER EXISTING ELCO WATER MAIN 15' UTILITY EASEMENT PROPOSED TYPE R INLET W/SNOUT & SUMP PROPOSED ROW 88.5' 15' UTILITY EASEMENT 20' UTILITY AND DITCH PERMANENT EASEMENT (ANDERSON WHITEWATER PLAT) CONNECTION B1 STA 13+24.29 N: 134316.78 E: 195609.98 40.00 LF 12" PVC @ 0.20% SSMH B2 STA 13+64.29 N: 134317.30 E: 195569.98 EXISTING 12" VCP @ 0.20% EXMH B STA 10+00.00 N: 134312.61 E: 195934.24 324.29 LF EXISTING 12" VCP @ 0.20% EXISTING 30' GAS LINE EASEMENT 15' UTILITY EASEMENT 96.53' EXISTING ROWJEROME STREETEXISTING GAS LINE EXISTING UNDERGROUND ELECTRICAL LINE PROPOSED TYPE R INLET EXISTING UNDERGROUND DUCT BANK 4940 4945 4950 4955 4960 4965 4970 4975 4980 4940 4945 4950 4955 4960 4965 4970 4975 4980 9+5010+0011+0012+0013+0014+0015+00 EXISTING 12" VCP @ 0.20%SSMH B2STA 13+64.29RIM 4960.1±INV. IN 4955.32 (W)INV. OUT 4955.32 (E)40.00 LF 12" PVC @ 0.20%CONNECTION B1 (SEE NOTE 8)STA 13+24.29RIM 4956.3±INV. IN 4955.24 (W)INV. OUT 4955.24 (E)324.29 LF EXISTING 12" VCP @ 0.20%EXMH BSTA 10+00.00RIM 4961.1±INV. IN 4954.60 (W)INV. OUT 4954.46 (E)36" RCP STORM STA.=13+46.60 INV.=4948.97 EXISTING 21" PVC EXISTING GROUND 2.96' SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 SS2 PLAN & PROFILESANITARY SEWER B8 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROFILE SCALE: SANITARY SEWER B EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL SANITARY CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS UTILITIES WATER AND WASTE WATER DESIGN CRITERIA MANUAL, LATEST EDITION. 3.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STROM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 6.ALL SANITARY MANHOLES TO BE 4'Ø UNLESS NOTED OTHERWISE. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.CONNECTION B1 BETWEEN VCP AND PVC SHOULD BE; FERNCO FLEXIBLE BOOT COUPLING. W EXISTING STORM SEWER SPROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED AREA STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY W EASEMENT LINE PROPOSED RIGHT OF WAY PROPOSED COMBO STORM INLET PROPOSED TYPE-R STORM INLET PROPOSED WATER SERVICE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS SS2 SSSSSSSSWWWWWEEEEEFOFOFOFOFOTTTTTTTTTWWWWWFOFOFOFOFOGGGGGGGGX X X XEWWSWO G CTVCTVCTVGGGCTVCTVCTVCTVCTVCONTROLIRRCONTROLIRRCONTROLIRRCONTROLIRRCONTROLIRRIRUDUDUGEUGEUGEUGEUGEUGEUGEFES A STA 10+00.00 N: 134264.05 E: 195586.82 EX - 18" FES FL ELEV. = 4956.64EAST VINE DRIVEINLET A1 WITH TWO (2) 48F SNOUTS w/ EXTENDER STA 10+30.64 N: 134294.69 E: 195587.43 EXISTING 12" VCP SANITARY SEWER EXISTING 12" CITY OF FORT COLLINS WATER MAIN EXISTING 12" PVC ELCO WATER MAIN INLET A2 STA 10+93.50 N: 134357.54 E: 195588.11 30.64 LF 2-24" RCP @ 0.40% 62.86 LF 36" RCP @ 2.00% 39.89 LF 24" RCP @ 2.00% OUTLET A STA 11+33.39 N: 134394.83 E: 195573.94 EAST VINE DRIVEPROPOSED UNDERDRAIN PROPOSED OVERFLOW 4940 4945 4950 4955 4960 4965 4970 4975 4940 4945 4950 4955 4960 4965 4970 4975 9+5010+0011+0012+00 INLET A2STA 10+93.50FL. EL 4959.7±INV. IN 4955.26 (N)INV. OUT 4949.78 (S)FES ASTA 10+00.00INV. 4956.65 (N)12" WATER STA.=10+62.47 TOP=4956.33 12" WATER STA.=10+78.24 TOP=4955.58 INLET A1STA 10+30.64FL. EL 4959.8±INV. IN 4948.53 (N)INV. OUT 4956.77 (S)PROPOSED GROUND EXISTING GROUND 18" MIN. INSTALL TWO (2) 48F SNOUTS w/ EXTENDER 48" DEEP SUMP 39.89 LF 24" RCP @ 2.00%OUTLET ASTA 11+33.39RIM 4959.4±INV. IN 4956.28 (N)INV. OUT 4956.06 (S)62.86 LF 36" RCP @ 2.00% 30.64 LF 2-24" RCP @ 0.40% STA.=10+75.25 TOP=4958.20 FoCO ELEC. STA.=10+68.99 TOP=4958.31 DUCT BANK100-YEAR HGL 12" PVC SANITARY STA.=10+53.03 INV.=4955.29 35.4" SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 ST1 PLAN & PROFILEPOND OUTFALL A9 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROFILE SCALE: POND OUTFALL A EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY INLET SCHEDULE: INLET ID TYPE A1 10' TYPE R A2 15' TYPE R C1 TYPE D D1 TYPE C D2 NYLOPLAST 15" STANDARD D3 NYLOPLAST 15" STANDARD D4 NYLOPLAST 15" STANDARD D5 NYLOPLAST 15" STANDARD D6 NYLOPLAST 15" STANDARD D7 NYLOPLAST 15" STANDARD G1 COMBINATION INLET KEYMAP T GAS OUTFALL A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SSSSSSSSSSWWWWWEFOFOFOFOFOTTTTTTTTTTWWWWWFOFOFOFOFOWSWO DG CTVCTVCTVGGGCTVCTVCTVVAULTCABLEUDUDUDUDUDUDUDUGEUGEUGEUGEUGEUGEUGEHEADWALL C STA 10+00.00 N: 134438.84 E: 195432.62 141.59 LF 2 - 14" x 23" HEP CLASS 4 RCP @ 0.25% INLET C1 STA 11+41.59 N: 134579.95 E: 195444.34 24' EMERGENCY ACCESS EASEMENT PROPOSED SCOUR-STOP NATURAL HABITAT BUFFER ZONE DRAINAGE EASEMENT (WIDTH VARIES) PROPOSED UNDERDRAIN STORM DRAIN D SEE SHEET ST3 SANITARY SEWER B SEE SHEET SS2 EAST VINE DRIVE15' UTILITY EASEMENTPROPOSED DETENTION POND 6' PED. ACCESS EASEMENT4945 4950 4955 4960 4965 4970 4975 4980 4985 4945 4950 4955 4960 4965 4970 4975 4980 4985 9+5010+0011+0012+00 HEADWALL CSTA 10+00.00INV. 4959.29 (N)141.59 LF 2 - 14" x 23" HEP, CLASS 4 RCP @ 0.25%INLET C1STA 11+41.59RIM 4962.0±INV. OUT 4959.65 (S)INV. OUT 4959.65 (N)EXISTING GROUND PROPOSED GROUND 100-YR HGL SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 ST2 PLAN & PROFILESTORM DRAIN C10 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROFILE SCALE: STORM DRAIN C EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY INLET SCHEDULE: INLET ID TYPE A1 10' TYPE R A2 15' TYPE R C1 TYPE D D1 TYPE C D2 NYLOPLAST 15" STANDARD D3 NYLOPLAST 15" STANDARD D4 NYLOPLAST 15" STANDARD D5 NYLOPLAST 15" STANDARD D6 NYLOPLAST 15" STANDARD D7 NYLOPLAST 15" STANDARD G1 COMBINATION INLET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS ST2 ST3 S SS SS SS SS SS SS SS SS SSSST VAULT F.O.F.O. W W W W W W W W W W W E EEEEEEEEEEEFOFOFOFOFOFOGGGWWWFOFOFOFOFO FO FO FO FO FO FO FO FOTTTTTTTTT TTTTT T T T T T T T TT TTT W W W W W W W W W W W W WFOFOFOFOFOFOFOFOFOFOFOFOFOEEEEFO FO FO WSWO WSSSSD D GCTV CTV CTVGGG CTV CTV CTV CTV VAULT CABLE SFW UD UD UD UD UDUDUD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE FES D STA 10+00.00 N: 134396.94 E: 195351.90 95.63 LF 15" PERFORATED HDPE @ 0.50% 27.84 LF 12" HDPE @ 0.50% 70.96 LF 12" PERFORATED HDPE @ 0.50% 70.96 LF 12" PERFORATED HDPE @ 0.50% 33.57 LF 12" HDPE @ 0.50% 43.52 LF 12" PERFORATED HDPE @ 0.50% 56.64 LF 23"x14" HEP CLASS 4 RCP @ 0.50% 59.35 LF 6" HDPE @ 0.50% 24.19 LF 6" HDPE @ 0.50% 20.30 LF 6" HDPE @ 0.50% DRAINA BASIN D10 (6'' Ø) STA 15+02.95 N: 134479.29 E: 194929.49 INLET D6 STA 13+55.60 N: 134398.90 E: 194996.32 INLET D7 STA 13+99.11 N: 134399.38 E: 194952.80 INLET D5 STA 13+22.03 N: 134398.54 E: 195029.88 INLET D3 STA 11+80.11 N: 134396.98 E: 195171.80 INLET D4 STA 12+51.07 N: 134397.76 E: 195100.84 DRAIN BASIN D8 (8'' Ø) STA 14+23.30 N: 134399.65 E: 194928.62 INLET D2 STA 11+52.27 N: 134396.68 E: 195199.63 INLET D1 STA 10+56.64 N: 134397.13 E: 195295.26 ROOF DRAIN CONNECTION D9 STA 14+43.60 N: 134419.94 E: 194928.84 15' UTILITY EASEMENT EXISTING 6" WATER EXISTING ELCO WATER MAIN EXISTING 8" WATER EXISTING 18" STORM EAST VINE DRIVE PROPOSED CURB CUT 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) PROPOSED ROW PROPOSED SCOUR-STOP PROPOSED FH ASSEMBLY APPROXIMATELY 12' OF 12" PVC SLEEVE 5.15' DRAINAGE EASEMENT 5.15' DRAINAGE EASEMENT 4.65' DRAINAGE EASEMENT PROPOSED UNDERDRAIN 4945 4950 4955 4960 4965 4970 4975 4980 4985 4945 4950 4955 4960 4965 4970 4975 4980 4985 9+5010+0011+0012+0013+0014+0015+0016+00 56.64 LF 23"x14" HEP CLASS 4 RCP @ 0.50%INLET D1STA 10+56.64FL. EL 4964.9±INV. IN 4960.94 (W)INV. OUT 4960.13 (E)95.63 LF 15" PER FORATED HDPE @ 0.50%INLET D2STA 11+52.27FL. EL 4964.9±INV. IN 4961.67 (W)INV. OUT 4961.42 (E)27.84 LF 12" HDPE @ 0.50% 70.96 LF 12" PER FORATED HDPE @ 0.50%INLET D3STA 11+80.11FL. EL 4967.8±INV. IN 4962.73 (W)INV. OUT 4961.81 (E)INLET D4STA 12+51.07FL. EL 4967.8±INV. IN 4963.08 (W)INV. OUT 4963.08 (E)70.96 LF 12" PER FORATED HDPE @ 0.50%INLET D5STA 13+22.03FL. EL 4967.8±INV. IN 4963.43 (W)INV. OUT 4963.43 (E)33.57 LF 12" HDPE @ 0.50%INLET D6STA 13+55.60FL. EL 4968.6±INV. IN 4963.60 (W)INV. OUT 4963.60 (E)43.52 LF 12" PER FORATED HDPE @ 0.50% 24.19 LF 6" HDPE @ 0.50%INLET D7STA 13+99.11FL. EL 4968.6±INV. IN 4965.06 (W)INV. OUT 4963.82 (E)DRAIN BASIN D8 (8'' Ø)STA 14+23.30FL. EL 4966.8±INV. IN 4965.18 (N)INV. OUT 4965.18 (E)20.30 LF 6" HDPE @ 0.50%ROOF DRAIN CONNECTION D9STA 14+43.60INV. 4965.28 (N)INV. 4965.28 (S)59.35 LF 6" HDPE @ 0.50%DRAINA BASIN D10 (6'' Ø)STA 15+02.95RIM 4967.8±INV. OUT 4965.58 (S)FES DSTA 10+00.00INV. 4959.84 (W)PROPOSED GROUND EXISTING GROUND S. RG 1 S. RG 2 S. RG 3 100-YEAR HGL SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 ST3 PLAN & PROFILESTORM DRAIN D11 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROFILE SCALE: STORM DRAIN D EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM DRAINS LABELED AS HDPE SHALL BE HP STORM BY ADS (OR APPROVED EQUAL) 6.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). PROPOSED RIGHT OF WAY INLET SCHEDULE: INLET ID TYPE A1 10' TYPE R A2 15' TYPE R C1 TYPE D D1 TYPE C D2 NYLOPLAST 15" STANDARD D3 NYLOPLAST 15" STANDARD D4 NYLOPLAST 15" STANDARD D5 NYLOPLAST 15" STANDARD D6 NYLOPLAST 15" STANDARD D7 NYLOPLAST 15" STANDARD G1 COMBINATION INLET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T GAS ST2 ST3 STT D GAS XOHUOHUD FE S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SFE SFE SST STST STST STFESFE S FE SGAS / / / / / / / /D EM GMTFTF JEROME STREET LLC, 216 E OAK ST EAST VINE DRIVENORTH COLLEGE AVENUEJEROME STREETJEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE PROPOSED BUILDING (SEE SHEET G1 - G2 FOR DETAILED GRADING) PROPOSED POND OUTLET STRUCTURE A CITY OF FORT COLLINS, 740 N COLLEGE AVE G S UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD EXISTING 30' GAS LINE EASEMENT EXISTING 30' UTILITY & DRAINAGE EASEMENT LAKE CANAL EASEMENT 15' UTILITY EASEMENT LAKE CANAL EASEMENT DETENTION POND PROPERTY BOUNDARY 30' LAKE CANAL EASEMENT PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 24' EMERGENCY ACCESS EASEMENT 24.1' CITY TRAIL & UTILITY EASEMENT 15' CITY TRAIL & UTILITY EASEMENT15' UTILITY EASEMENT100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE)100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) NATURAL HABITAT BUFFER ZONE 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) PROPOSED 50' LAKE CANAL EASEMENT PROPOSED 30' UTILITY EASEMENT PROPOSED 4' CURB CUT PROPOSED COMBINATION INLET POND OUTFALL A SEE SHEET ST1 RAIN GARDEN 1 SEE SHEET RG1 STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 STORM DRAIN C SEE SHEET ST3 STORM DRAIN E SEE SHEET OU1 STORM DRAIN G SEE SHEET OU1 UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE PROPOSED 88.5' ROW 15' UTILITY EASEMENT 1 1 100-YR WATER SURFACE ELEVATION. 4960.18 PROPOSED OVERFLOW SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 OG1 OVERALL GRADING PLAN12 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE FLOW LINE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 6.ALL ITEMS REQUIRING FLOOD PROTECTION (TRANSFORMERS, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, MECHANICAL EQUIPMENT, ETC.) MUST BE ELEVATED OR FLOODPROOFED AS REQUIRED BY CHAPTER 10 OF CITY OF FORT COLLINS MUNICIPAL CODE A MINIMUM OF 24" ABOVE BASE FLOOD ELEVATION (ALSO KNOWN AS REGULATORY FLOOD PROTECTION ELEVATION) OF 4966.61 NAVD 88. 7.GROUND WATER ELEVATION WAS MEASURED AT APPROXIMATELY ELEV = 4957.025', ON JULY 29, 2022 NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED UNDERDRAIN UD NATURAL HABITAT BUFFER ZONE (NHBZ) SWALE SECTIONS SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)S2 (n:1)Q 1 - 1 1.15 26.45 15.0 8.0 9.42 2 - 2 0.98 15.68 6.0 10.0 2.44 KEYMAP T GAS G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R GAS FE SFE S FE S ST ST ST ST ST ST ST ST ST ST ST STFE S FE S FE S ST ST ST GAS / / / / / / / // / / / / / / /CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD PROPOSED POND OUTLET STRUCTURE A EXISTING 30' GAS LINE EASEMENT PROPOSED 8' CONCRETE PAN AREA INLET PROPOSED TYPE R INLET 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 15' CITY TRAIL & UTILITY EASEMENT 15' UTILITY EASEMENT 24' EMERGENCY ACCESS EASEMENT 62.1762.6162.6062.1562.1462.5962.2262.582.6%2.6%1.3%1.3%1 . 5% 1 . 6%1.6%1.7%2.8% 2.8%3.8%2.5%2.2% 2.2%2.2% 1.5%2.4%1.8%1.6%1.8%0.8%1 . 4%2.6%3. 2 %1.4%1.9%3.1%2.1%0.8%62.14 62.5362.3162.3362.1062.1962.1562.1362.1562.1762.1162.04 61.8761.8661.8961.9661.55 61.566 1 . 6 0 61.89 62.0361.7962.1562.23 62.4962. 3 9 62.4862.2862.3562.4962.4662.4662.4861.7161.9862.0262.0061.9161.6361.3461.29 6 1 . 5 6 61.60 61.6561.6361.3561.536 1 . 5 4 61.5161.43 61.2561.1161.4061.5261.9962.9262.7362.7662.9262.03 62.44 62.81 62.9962.9762.6862.6662.1962.4260.7160.80 60. 9 1 61.2761.1858.1159.17 60.1861.4661.6361.66 61.5161.5760.6359.8660.44 60.30 59.4559.5659.7159.2560.3859.6660. 6 1 60.7761. 0 5 61. 3 5 6 1 . 7 2 61.21 60. 8 360.6860.5160.17 60.0660.14 60.25 63.0262.8763.4263.2659.60 61.0661.1161.1061. 1 1 60.10 60. 2 2 (62.97)(63.49)(62.68)(61.71)(60.63)(60.69)(60.41)60.1760.1060.21NATURAL HABITAT BUFFER ZONE 58.8658.5658.2658.1959.4259.8161.0260. 9 5 60.1959.31 PROPOSED 50' LAKE CANAL EASEMENT COMBINATION INLET 6.3%6.8%18.4%21.6%1.1% 1.0%59.95PROPOSED 4' CURB CUT 61.20NATURAL HABITAT BUFFER ZONE POND OUTFALL A SEE SHEET ST1 RAIN GARDEN 1 RG1 STORM DRAIN C SEE SHEET ST3 STORM DRAIN G SEE SHEET OU1 UD-S CO5 INV. OUT=4957.45 (E) 46.58 L F 4 " H D P E @ 0. 5 0 % UD-S CO4 INV. IN=4957.21 (W) INV. OUT=4957.21 (E) 54.59 LF 4" HDPE @ 0.50% UD-S CO3 INV. IN=4956.94 (W) INV. OUT=4956.94 (E) 52.69 L F 4 " H D P E @ 0 . 5 0 % 68.26 LF 4" HDPE @ 0.50% UD-S CO2 INV. IN=4956.68 (W) INV. OUT=4956.68 (E) UD-S CO1 INV. IN=4956.34 (W) INV. OUT=4956.34 (S) 10.84 LF 4" HDPE @ 0.50%61.4261. 4 4 61.49PROPOSED 2' CHASE 0.5% 1.3% 1.0% 2.5%1.0%0.5%60.8960.43100-YR WATER SURFACE ELEVATION ELEV. 4960.18 60.1825' POND OVERFLOW 59.2259.5259.4359.346 0 . 2 9 60.34 6 0 . 3 2 60.3361.2061.06 61.20 61. 2 0 61.11 61.15 61.86 62.11 62.33 62. 5 1 62.66 62.19 62.43 62.28 61.97 61.71 61.61 61.36 60.50 61.92 61.2661.6260.8261.0961.2061. 2 0 61.2061.2061. 0 2 60.7060.7061.2060.2560.204.7%5.1%SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 G2 GRADING PLAN14 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE FLOW LINE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 6.ALL ITEMS REQUIRING FLOOD PROTECTION (TRANSFORMERS, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, MECHANICAL EQUIPMENT, ETC.) MUST BE ELEVATED OR FLOODPROOFED AS REQUIRED BY CHAPTER 10 OF CITY OF FORT COLLINS MUNICIPAL CODE A MINIMUM OF 24" ABOVE BASE FLOOD ELEVATION (ALSO KNOWN AS REGULATORY FLOOD PROTECTION ELEVATION) OF 4966.61 NAVD 88. 7.GROUND WATER ELEVATION WAS MEASURED AT APPROXIMATELY ELEV = 4957.025', ON JULY 29, 2022 NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED UNDERDRAIN UD NATURAL HABITAT BUFFER ZONE (NHBZ) SWALE SECTIONS SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)S2 (n:1)Q 1 - 1 1.15 26.45 15.0 8.0 9.42 2 - 2 0.98 15.68 6.0 10.0 2.44 KEYMAP T GAS G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R UD UD UD UD UD UD UD UD UD UD UD UD TYPE D INLET PROPOSED OUTDOOR LANDSCAPED AMPHITHEATER 3.7%2.8%12.2%22.6%25.0%0.8%61.7161.3761.7760.63 60.79 60.72 60.58 60.52 60.50 60.5260.68NATURAL HABITAT BUFFER ZONE PROPOSED 50' LAKE CANAL EASEMENTDRAINAGE EASEMENT (WIDTH VARIES) STORM DRAIN C SEE SHEET ST2 STORM CULVERT F SEE SHEET OU1 UD-N CO4 INV. OUT=4957.64 (E) 77.35 LF 4" HD P E @ 0 . 2 0 % UD-N CO3 INV. IN=4957.49 (W) INV. OUT=4957.49 (E) 48.33 LF 4" HDPE @ 0.20% UD-N CO2 INV. IN=4957.39 (W) INV. OUT=4957.39 (E) 114.29 LF 4" HD P E @ 0 . 2 0 % 4.98 LF 4" HDPE @ 49.94% UD-N DRAIN BASIN 1 (8'' Ø) INV. IN=4957.16 (S) INV. IN=4957.16 (E) INV. IN=4957.16 (W) 7.04 LF 4" HDPE @ 0.55% UD-N CO1-1 INV. OUT=4957.20 (W) INLET C1 INV. OUT=4959.65 (S) INV. OUT=4959.65 (N) SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 RG1 PLAN & DETAILSNORTH RAIN GARDEN15 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 KEYMAP T GASRG1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH RAIN GARDEN PART 1 - GENERAL A.Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones, stumps, roots, or other similar objects larger than two inches. No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth or prove a hindrance to the facility's function and maintenance. B.BSM shall be free of plant or seed material of non-native, invasive species, or weeds. C.Fully mixed BSM shall be tested prior to installation and meet the following criteria: 1.P-Index of less than 30 2.pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed uniformly into the BSM prior to use in the bioretention facility. 3.Cation Exchange Capacity (CEC) greater than 10 4.Phosphorous (Phosphate, P2O5) not to exceed 69 ppm 5.BSM that fails to meet the minimum requirements shall be replaced at the Contractor's expense. D.BSM shall be delivered fully mixed in a drum mixer. Onsite mixing of piles will not be allowed. Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the Owner. PART 2 - SOIL MATERIALS A.Sand 1.BSM shall consist of 60-70% sand by volume meeting ASTM C-33. B.Shredded Paper 1.BSM shall consist of 5-10% shredded paper by volume. 2.Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY. 3.Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall be thoroughly and mechanically mixed to prevent clumping. C.Topsoil 1.BSM shall consist of 5-10% topsoil by volume. 2.Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle with less than 5% clay material. 3.Onsite, native material shall not be used as topsoil. 4.Textural analysis shall be performed on topsoil, preferably at its source, prior to including topsoil in the mix. Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any other material deleterious to plant health. 5.Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%. 6.Contractor shall certify that topsoil meets these specifications. D.Leaf Compost 1.BSM shall consist of 10-20% leaf compost by volume. 2.Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch resulting from biological degradation and transformation of plant-derived materials under controlled conditions designed to promote aerobic decomposition. 3.The material shall be well composted, free of viable weed seeds and contain material of a generally humus nature capable of sustaining growth of vegetation, with no materials toxic to plant growth. 4.Compost shall be provided by a local US Composting Council Seal of Testing Assurance (STA) member. A copy of the provider's most recent independent STA test report shall be submitted to and approved by the Owner prior to delivery of BSM to the project site. 5.Compost material shall also meet the following criteria: a.100 percent of the material shall pass through a 1/2 inch screen b.PH of the material shall be between 6.0 and 8.4 c.Moisture content shall be between 35 and 50 percent d.Maturity greater than 80 percent (maturity indicator expressed as percentage of germination/vigor, 80+/80+) e.Maturity indicator expressed as Carbon to Nitrogen ration < 12 f.Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4 g.Minimum organic matter shall be 40 percent dry weight basis h.Soluble salt content shall be no greater than 5500 parts per million or 0-5 mmhos/cm i.Phosphorus content shall be no greater than 325 parts per million j.Heavy metals (trace) shall not exceed 0.5 parts per million k.Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR 503.13, Tables 1 & 3 levels l.Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels PART 3 - EXECUTION A.General 1.Refer to project specifications for excavation requirements. B.Placement Method 1.BSM material shall be spread evenly in horizontal layers. 2.Thickness of loose material in each layer shall not exceed 9-inches. 3.Compaction of BSM material is not required. BIORETENTION SAND MEDIA100 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 6.REFER TO CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS ON BIORETENTION SAND MEDIA, DIAPHRAGM AGGREGATE, AND RESERVOIR AGGREGATE. PROPOSED RIGHT OF WAY PROPOSED SPOT ELEVATION 2.0% (47.45 ) EXISTING SPOT ELEVATION 33.43 NATURAL HABITAT BUFFER ZONE PROPOSED SLOPES FLAT BOTTOM AREA PROPOSED 6" PERFORATED PVC UD RG2 RG3 RG4 APPROVED: DRAWN BY:DETAILS CONSTRUCTION DATE REVISED: DETAILSTORMWATER BIORETENTION October 2022 SAA D-53 1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.PRE-CONSTRUCTION 2.1.CONTRACTOR SHALL AVOID COMPACTION OF THE BIORETENTION BASIN AREA TO PRESERVE EXISTING INFILTRATION RATES. 2.2.CONTRACTOR SHALL CALL FOR CITY INSPECTIONS AT THE INTERVALS STIPULATED IN THE "DURING CONSTRUCTION INSPECTION CHECKLISTS". 3.DURING CONSTRUCTION: 3.1.CONTRACTOR SHALL PROVIDE CONSTRUCTION OBSERVATION DURING CONSTRUCTION OF THE BIORETENTION BASIN TO ENSURE COMPLIANCE WITH THE APPROVED PLANS AND DESIGN SPECIFICATIONS. 3.2.LOOSE MATERIALS SHALL NOT BE STORED ON THE BIORETENTION AREA. 3.3.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS AND DIRT FROM ANY SOURCE FROM ENTERING THE BIORETENTION SYSTEM. 4.GEOTEXTILE LINERS: 4.1.WHERE USED, GEOTEXTILE LINERS (PERMEABLE OR IMPERMEABLE AS PER PLAN) SHALL BE INSTALLED ALONG PERIMETER OF CROSS-SECTION OF THE BIORETENTION CELL. 4.2.WHERE USED, GEOTEXTILE LINERS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS. ALL SEAMS AND OPENINGS IN THE LINER SHALL BE SEALED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. 4.3.WHERE USED, IMPERMEABLE GEOMEMBRANE SHEET / LINER SHALL BE 40 MIL THICK, HIGH-DENSITY POLYETHYLENE DESIGNED SPECIFICALLY FOR FLEXIBLE GEOMEMBRANE APPLICATIONS. ADJACENT STRIPS OF IMPERMEABLE LINER SHALL OVERLAP A MINIMUM OF 18", OR PER MANUFACTURER'S SPECIFICATION. 4.4.WHERE USED, CONTRACTOR TO PLACE LINER IN A WAY THAT ENSURES ENOUGH SLACK IN THE LINER TO ALLOW FOR BACKFILL AND SETTLING WITHOUT TEARING THE LINER. 5.AGGREGATES AND BSM: 5.1.ALL AGGREGATES SHALL BE ANGULAR, CRUSHED, WASHED ROCK, CLEAN OF DEBRIS AND WITH NO MORE THAN 1% FINES. 5.2.RESERVOIR AGGREGATE SHALL BE GRADATION ASTM #57 OR #67. 5.3.DIAPHRAGM AGGREGATE SHALL BE "PEA GRAVEL", WITH GRADATION ASTM #8, #89 OR #9. 5.4.THE BIORETENTION SOIL SHALL MEET THE CITY BIORETENTION SAND MEDIA ("BSM") SPECIFICATION FOUND AT:https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/ NOTES: 12" MAX 1 MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE TOP OF THE MULCH 4 MAX PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS OVERFLOW RISER OPTION (AS PER PLAN) 8" MIN DEPTH THICKENED CURB ADJACENT TO VEHICULAR PAVEMENTS STANDARD CROSS-SECTION 1 2 WALLED CROSS-SECTION PONDING DEPTH MUST NOT EXCEED FLOWLINE ELEVATION OF ADJACENT GUTTER 18" MIN 4" 12" MAX 30" MIN 36" MIN BASIN WIDTH COVER PLATE 8" SIDEWALK CHASE 18" MIN OVERFLOW RISER OPTION (AS PER PLAN) REINFORCED CONCRETE WALLS (AS PER PLAN) 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 18" MIN DEPTH OF BIORETENTION SAND MEDIA MAXIMUM ALLOWABLE PONDING DEPTH IS 12" FROM THE SURFACE OF THE MULCH 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 6.UNDERDRAIN: 6.1.UNDERDRAIN PIPE TO BE PERFORATED OR SLOTTED. PERFORATIONS OR SLOTS TO BE SMALLER THAN SURROUNDING AGGREGATE TO ENSURE AGGREGATE DOES NOT FALL INTO OR CLOG THE OPENINGS. 6.2.DO NOT WRAP UNDERDRAIN WITH GEOTEXTILE OR SOCK. 6.3.UNDERDRAIN PIPE MUST OUTFALL BY GRAVITY AND MUST TIE INTO A STORMWATER PIPE, INLET OR SYSTEM AND THE LOCATION MUST BE APPROVED BY THE CITY. THE UNDERDRAIN TIE-IN SHALL MEET ALL REQUIRED PIPE SIZE, TYPES, AND COVER REQUIREMENTS THAT MAY APPLY TO PIPING THAT EXTENDS BEYOND THE LIMITS OF THE BIORETENTION CELL AND ENCROACHES INTO PUBLIC RIGHT-OF-WAY OR OTHER PROPERTY. 7.OVERFLOW INLET: 7.1.A 100-YEAR OVERFLOW SPILLWAY OR INLET MUST BE PROVIDED. 7.2.ALL OVERFLOW INLETS SHALL BE CAPPED WITH A DOME-SHAPED GRATE, OR PER PLAN. 7.3.IN ALL CASES, AN EMERGENCY OVERFLOW ROUTE SHALL BE PROVIDED AND THE LOCATION SHALL BE IDENTIFIED ON THE PLANS (THIS MAY BE COINCIDENT WITH THE 100-YEAR OVERFLOW SPILLWAY). 8.CLEANOUTS: 8.1.PROVIDE CLEANOUTS (AS PER PLAN) TO ALLOW INSPECTION (BY CAMERA) OF THE UNDERDRAIN SYSTEM DURING AND AFTER CONSTRUCTION. 8.2.CLEANOUTS SHALL BE PROVIDED AT EACH BEND GREATER THAN OR EQUAL TO 90° AND EVERY 100' ALONG A STRAIGHT RUN. CLEANOUT SHALL BE INSTALLED PER THE APPROVED PLANS. 8.3.CLEANOUTS SHALL BE A SOLID WALL PVC STRUCTURE FOR ALL VERTICAL SECTIONS WITH FITTINGS TO CONNECT TO DISTRIBUTION AND UNDERDRAIN PIPING MATERIALS, AS REQUIRED. 9.FOREBAY: 9.1.THE FOREBAY SHALL BE EASILY ACCESSIBLE WITH A HARD SURFACED BOTTOM FOR MAINTENANCE PURPOSES. 10.LANDSCAPE MATERIALS 10.1.CONTRACTOR SHALL NOT PLACE WEED BARRIER ANYWHERE WITHIN THE BIORETENTION BASIN. IF MULCH IS PLACED IN THE BIORETENTION BASIN, IT MUST BE NON-FLOATABLE. 10.2.IF MULCH OR COBBLES ARE PLACED IN THE BIORETENTION BASIN, THE MAXIMUM ALLOWABLE WATER DEPTH OF 12" AND REQUIRED BASIN VOLUME MUST BE MEASURED FROM THE TOP SURFACE OF THE MULCH OR COBBLE. 10.3.ROLLED TURF OR SOD IS NOT AN ALLOWABLE LANDSCAPE MATERIAL FOR BIORETENTION BASINS. LOW WATER CONSUMPTION LANDSCAPE PLANTINGS ARE PREFERRED FOR BIORETENTION BASINS. 10.4.LANDSCAPE PLANTINGS SHALL NOT BE PLACED TO IMPEDE DRAINAGE INTO OR OUT OF THE BIORETENTION BASIN. 10.5.TEMPORARY IRRIGATION MAY BE INSTALLED TO ESTABLISH LANDSCAPING OR SEED IN THE BIORETENTION BASIN. 2" MIN 8" MIN 4" FLAT FOREBAY IS REQUIRED TO BE PLACED AT CONCENTRATED INFLOW LOCATIONS; PER PLANS AND SITE SPECIFIC DETAILS LANDSCAPING TO BE INSTALLED PER APPROVED LANDSCAPING PLAN 6"-12" 4" MIN DEPTH OF DIAPHRAGM AGGREGATE 8" MIN DEPTH OF RESERVOIR AGGREGATE 8" MIN 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 2" MIN 30" MIN GEOTEXTILE FABRIC OR LINER (AS PER PLAN)18" MIN DEPTH OF BIORETENTION SAND MEDIA NATIVE SOIL ZONE RUNDOWN OR SCOUR PROTECTION NEEDED ON SLOPES 8" FLAT AREA - SEE DESIGN PLANS FOR EXTENTS OF BIORETENTION FLAT SURFACES CLEANOUT101 UD UD 100 YR FLOOD PLAIN (CURRENT EFFECTIVE)500 YR FLOOD PLAIN (CURRENT EFFECTIVE)67.761.5%1.5%3.2% INLET D7 INV. IN=4965.06 (W) INV. OUT=4963.82 (E) INLET D6 INV. IN=4963.60 (W) INV. OUT=4963.60 (E) 43.52 LF 12" HDPE @ 0.50% STORM DRAIN D SEE SHEET ST3 4.65' DRAINAGE EASEMENET EAST VINE DRIVE UD UD UD UD UD UD EAST VINE DRIVE 15' UTILITY EASEMENT 68.7966.971.5%1.5%INV. OUT=4963.60 (E) 5.15' DRAINAGE EASEMENTINLET D5 INV. IN=4963.43 (W) INV. OUT=4963.43 (E) 70.96 LF 12" HDPE @ 0.50% INLET D3 INV. IN=4962.73 (W) INV. OUT=4961.81 (E)70.96 LF 12" HDPE @ 0.50% INLET D4 INV. IN=4963.08 (W) INV. OUT=4963.08 (E)68.7968.79STORM DRAIN D SEE SHEET ST3 UD UD UD UD PROPOSED 10'1.5%INLET D1 INV. IN=4960.94 (W) INV. OUT=4960.13 (E) 95.63 LF 15" HDPE @ 0.50% INLET D2 INV. IN=4961.67 (W) INV. OUT=4961.42 (E)68.7968.7968.7968.7964.09EAST VINE DRIVE STORM DRAIN D SEE SHEET ST3 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 RG2 PLANSOUTH RAIN GARDEN16 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 KEYMAP T GASRG1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SOUTH RAIN GARDEN 1 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 6.REFER TO CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS ON BIORETENTION SAND MEDIA, DIAPHRAGM AGGREGATE, AND RESERVOIR AGGREGATE. PROPOSED RIGHT OF WAY PROPOSED SPOT ELEVATION 2.0% (47.45 ) EXISTING SPOT ELEVATION 33.43 NATURAL HABITAT BUFFER ZONE PROPOSED SLOPES FLAT BOTTOM AREA PROPOSED 6" PERFORATED PVC UD RG2 RG3 RG4 SOUTH RAIN GARDEN 2 SOUTH RAIN GARDEN 3 A A SECTION A-A PLAN VIEW DIRECTION OF FLOW FLOWLINE OF NOTCH FINISH GROUND OF RAIN GARDEN L W 6.0" DIRECTION OF FLOW 6.0" TYP. 2" NOTCH 6.0"2"X6" NOTCH 12.0" STORM DRAIN BIO RETENTION SAND MEDIA HALF INCH EXPANSION JOINT TO BE INSTALLED BETWEEN CONCRETE RUNDOWN & FOREBAY 6.0" PROPOSED NATIVE MATERIAL SUBBASE STORM DRAIN SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 D12 DETAILSDRAINAGE28 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R DETAILS CONSTRUCTION DETAILSTORMWATER BIORETENTION - UPTURNED ELBOW OUTFALL D-53A TYPICAL BIORETENTION OR SAND FILTER CROSS-SECTION 18" MIN UPTURNED ELBOW DAYLIGHT ELEVATION MUST BE A MINIMUM OF 18" BELOW THE WATER SURFACE OF THE LID FEATURE UNDERDRAIN @ 0.50% MIN SLOPE 1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.THIS DETAIL SHALL BE USED IN CONJUNCTION WITH DETAIL D-53 OR D-54. 3.THIS OPTION IS ONLY FOR USE WITH SYSTEMS THAT DO NOT HAVE AN IMPERMEABLE LINER. NOTES: 30" MIN 12" MAX 604 FOREBAY DIMENSIONS 603 TYPICAL FOREBAY Forebay Summary Forebay ID DEPTH (in)Length (ft)Width (ft) RG 1 12 4 5 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 D14 DETAILSDRAINAGE30 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R CC A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE PLAN GENERAL NOTES SECTION D-D D D A A ABBREVIATIONS LEGEND Outlet Summary Pond 1 ELEV A.4958.11 ELEV B.4958.86 ELEV C.4959.86 ELEV D.4956.06 Dwq (FT.)0.75 Ls (FT.)4 Ws (FT.)4 Wo (IN.)6 WQ PLATE HOLE DIA. (IN.) 13/16 # OF ROWS 2 # OF COLUMNS 1 004 SCOUR STOP DETAIL SCOUR STOP SCHEDULE007 36" ANCHOR STRAP BULLET ANCHOR RECESSED LOCK WASHER TRANSITION MAT TURF REINFORCEMENT MAT ANCHOR PATTERN ANCHOR ILLUSTRATION MAX. 1"-2" DROP FROM CULVERT FLOWLINE ONTO SCOURSTOP MATS PROFILE VIEW SECTION VIEW AA OUTLET AND CHANNEL SCOUR PROTECTION (TRANSITION MATS) DIRECTION OF FLOW TURF REINFORCEMENT MAT WIDTH OF PROTECTION LENGTH OF PROTECTION D D= CULVERT DIAMETER TRAN SI TI O N M A T S SOIL C O V E R A A CULVERT OUTLET PROTECTION - PLAN VIEW INSTALL ANCHORS PER SCOURSTOP INSTALLATION GUIDELINES MINIMUM DEPTH 24" IN COMPACTED, COHESIVE SOIL. MINIMUM DEPTH 30" IN LOOSE, SANDY, OR WET SOIL EXTRA ANCHORS AS NEEDED TO SECURE MAT TIGHTLY OVER SOIL COVER ABUT TRANSITIONS MATS TO END OF CULVERT OR CULVERT APRON. ADJACENT MATS ABUT TOGETHER LATERALLY AND LONGITUDINALLY. MINIMUM 8 ANCHORS PER MAT. EXTRA ANCHORS AS NEEDED FOR LOOSE OR WET SOILS. PROTECT BARE/ DISTURBED DOWNSTREAM SOILS FROM EROSION WITH APPROPRIATE SOIL COVER. NOTE: 1.SCOUR STOP MAT PRODUCT UTILIZED FOR TURF REINFORCEMENT MAT DIMENSIONS. 2.SEEDING AT OUTFALL OF STORM SEWER SHALL BE COMPLETED PRIOR TO INSTALLATION OF TURF REINFORCEMENT MAT. SS SEEDING TO OCCUR PRIOR TO INSTALLATION Storm Drain/ Design Point W (FT)L (FT)Quantity of Mats Storm Drain a ( 2 - 24" RCP)16 8 8 Storm Drain C ( 2 - 14"x23" HEP RCP)8 8 4 Storm Drain D (14"x23" HEP RCP)8 8 4 Storm Drain G (12" HDPE)4 4 1 4' Curb Cut (DP 4 )4 4 1 D D D STT VAULT F.O.F.O. D GAS XXOHUOHUOHUD F E SLID MH / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /F E SFE SFE SST STST F E SFE SFE S GAS D CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV EM GMTFTF G UGEUGE UGE UGES UD UD UD UD UDUDUD UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE1 1 JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE FORT COLLINS 1d 4 3b 2 5 6 8 10 11 12 co1 w8 w10 w11 7 9 1d 1.94 ac 2 0.47 ac 6 0.36 ac 3b 0.39 ac W8 0.63 ac 12 0.14 ac 9 0.14 ac 11 0.05 ac Co1 0.43 ac 8 0.12 ac 10 0.03 ac 4 0.29 ac 5 0.16 ac 7 0.10 ac W10 1.50 ac W11 0.89 ac VINE DRIVECOLLEGE AVENUEJEROME STREET100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 1a 0.05 ac 1b 0.08 ac 1c 0.48 ac 3a 0.01 ac 3c 0.05 ac 1a 1b 1c 3a 3c PROPERTY BOUNDARY PROPERTY BOUNDARY WQ1 - OUTLET STRUCTURE A PROPOSED STORM LINE PROPOSED STORM INLET (TYP.) EXISTING STORM LINE EXISTING INLET PROPOSED STORM INLET (TYP.) DETENTION POND 1 WQCV VOLUME = 0.02 AC-FT TOTAL VOLUME REQUIRED = 0.22 AC-FT MAXIMUM RELEASE RATE = 12.99 CFS OUTLET IN. EL. = 4958.89 WQCV WATER SURFACE EL. = 4958.83 100-YR. WATER SURFACE EL. = 4960.18 FREEBOARD = 1.02 FT TOP OF BERM EL. = 4961.20 PROPOSED COMBINATION INLET PROPOSED OVERFLOW STRUCTURE POND OUTFALL A SEE SHEET ST1 RAIN GARDEN 1 SEE SHEET RG1 STORM DRAIN D SEE SHEET ST3 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 STORM DRAIN C SEE SHEET ST3 STORM DRAIN E SEE SHEET OU1 STORM DRAIN F SEE SHEET OU1 STORM DRAIN G SEE SHEET OU1 UPHAM FREDERICK M 207 E. VINE DRIVE KUNDLA TODD J 209 E. VINE DRIVE PROPOSED OVERFLOW STRUCTURE 2 2 PROPOSED 25' POND OVERFLOW SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 1.REFER TO THE FINAL DRAINAGE REPORT, DATED MARCH 1, 2023 FOR ADDITIONAL INFORMATION. 2.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100 YEAR AND 500 YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 3.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 4.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED_USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100_YEAR FLOODPLAIN. 5.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100_YEAR FLOODPLAIN. 6.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS. 6.CRITICAL FACILITIES ARE PROHIBITED IN THE FLOODPLAIN, INCLUDING HAZARDOUS MATERIAL, GOVERNMENT SERVICES, ESSENTIAL SERVICES AND AT-RISK POPULATION CRITICAL FACILITIES. THIS INCLUDES SCHOOLS AND AFTER SCHOOL PROGRAMS/DAY CAMPS FOR GRADES K-12. 7.THE QUANTITIES LISTED BELOW AND THE REMOVAL OF HYDROGEN STORAGE FROM THE SITE, WILL REMOVE THE DESIGNATION OF A “CRITICAL FACILITY', AS PER DEFINED BY CHAPTER 10 OF CITY CODE, FROM THE PROJECT. MATERIAL STORAGE RESTRICTIONS WILL BE REMOVED WITH THE APPROVAL OF THE LOMR. THE FOLLOWING OUTLINES THE HANDLING AND STORAGE PROCESSES OF HYDROGEN FOR RESEARCH PROCEDURES ANTICIPATED AT THE PROPOSED POWERHOUSE II FACILITY: ·HYDROGEN PRODUCED BY HYDROLYSIS OR SIMILAR METHOD WILL BE DISPOSED OF AS PRODUCED VIA VENTING OUTDOORS (AS PER ANY CODE REQUIREMENTS), BURNED IN OUTDOORS IN A NON-VISIBLE FLARE, CONSUMED BY FUEL CELL OR SIMILAR DEVICE. ·ONSITE STORAGE OF HYDROGEN WILL REMAIN AT OR BELOW QUANTITIES REGULATED BY INTERNATIONAL FIRE SAFETY CODE OR “HOUSEHOLD LEVELS” ·HYDROGEN FUELED VEHICLES, SUCH AS AUTOMOBILES, LIGHT AND MEDIUM DUTY TRUCKS, AND TRANSIT BUSES WILL BE TESTED ONSITE AND ADHERE TO ALL FIRE SAFETY CODES AND DOT REGULATIONS REGARDING HYDROGEN FUELED VEHICLES. NO VEHICLES WILL BE STORED OUTSIDE OVERNIGHT PER THE FLOATABLE MATERIALS REQUIREMENTS IN CHAPTER 10 OF CITY CODE. ·H2 STORAGE TANKS WILL REMAIN AT POWERHOUSE I UNTIL APPROVAL OF THE LOMR. FLAMMABLE MATERIALS: ·ACETYLENE : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. ·OXYGEN : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. NON-REACTIVE GASES: ·COMPRESSED AIR : 500 GAL. TANK ·COMPRESSED NITROGEN : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED ARGON : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED HELIUM : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED ARGON : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED CO2 : <20 - 300 STD. CU FT, STEEL CYLINDERS 8.THE PROPOSED POWERHOUSE II BUILDING IS PROJECTED TO HOUSE SEVERAL TYPES OF ORGANIZATIONS: RETAIL, PRIVATE COMPANIES WORKING IN ENERGY INDUSTRY, AND COLORADO STATE UNIVERSITY (CSU) FUNCTIONS RELATING TO SPONSORED RESEARCH. THE CSU SPACE WILL BE ASSIGNED TO RESEARCHERS TO CONDUCT SPONSORED RESEARCH FOR INDUSTRY AND GOVERNMENT (LOCAL, CITY, STATE AND FEDERAL) SPONSORS. THESE SPACES WILL NOT BE USED FOR TRADITIONAL EDUCATIONAL FUNCTIONS SUCH AS CLASSROOM INSTRUCTION OR LABORATORY INSTRUCTION. WHILE UNIVERSITY EMPLOYEES (RESEARCHERS, STAFF, AND STUDENT EMPLOYEES) WILL BE USING THE SPACE THEY WILL NOT BE ENGAGED IN INSTRUCTIONAL ACTIVITIES. 9.GOVERNMENT SERVICES FACILITIES INCLUDE ESSENTIAL STRUCTURES SUCH AS DORMITORIES, OFFICES, CLASSROOMS, AND LABORATORIES FOR PUBLIC HIGHER EDUCATION FACILITIES. POWERHOUSE II WILL NOT BE USED FOR DORMITORY HOUSING. NOR WILL IT HAVE INSTRUCTIONAL CLASSROOMS AND THE LABORATORY AND OFFICE SPACES WILL BE USED SOLELY FOR SPONSORED RESEARCH ACTIVITIES. GIVEN THIS DEFINITION AND PURPOSES, POWERHOUSE II SHOULD NOT BE CLASSIFIED AS A GOVERNMENT SERVICES FACILITY PER CHAPTER 10 OF CITY CODE AND THE RESTRICTIONS ASSOCIATED WITH THIS DESIGNATION. 10.ALL ITEMS REQUIRING FLOOD PROTECTION (TRANSFORMERS, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, MECHANICAL EQUIPMENT, ETC.) MUST BE ELEVATED OR FLOODPROOFED AS REQUIRED BY CHAPTER 10 OF CITY OF FORT COLLINS MUNICIPAL CODE A MINIMUM OF 24" ABOVE BASE FLOOD ELEVATION (ALSO KNOWN AS REGULATORY FLOOD PROTECTION ELEVATION) OF 4966.61 NAVD 88 DR1 DRAINAGE EXHIBITDEVELOPED36 NORTH SWALE SECTIONS PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: A LEGEND: NATURAL HABITAT BUFFER ZONE (NHBZ) PROPOSED POND WATER SURFACE ELEVATION CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) Historic Basins: Imp. Areas lot 2 & 3 0.70 0.95 1.00 5.71 5.00 1.84 6.99 Perv. Areas lot 2 & 3 0.46 0.41 0.51 12.48 12.48 0.39 1.68 Imp. Areas lot 4 0.62 0.95 1.00 5.00 5.00 1.67 6.12 Perv. Areas lot 4 3.20 0.49 0.61 11.62 9.57 3.27 15.40 Developed Basins: 1a 1a 0.05 0.95 1.00 5.00 5.00 0.13 0.46 1b 1b 0.08 0.95 1.00 5.00 5.00 0.22 0.81 1c 1c 0.48 0.95 1.00 5.00 5.00 1.31 4.80 1d 1d 1.94 0.58 0.72 11.75 10.91 2.36 10.67 2 2 0.47 0.90 1.00 5.00 5.00 1.20 4.63 3a 3a 0.01 0.95 1.00 5.00 5.00 0.02 0.06 3b 3b 0.39 0.90 1.00 5.00 5.00 1.01 3.92 3c 3c 0.05 0.87 1.00 5.00 5.00 0.12 0.49 4 4 0.29 0.53 0.67 5.00 5.00 0.44 1.94 6 6 0.36 0.20 0.25 7.66 7.34 0.18 0.79 DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) Basins Not Detain 5 5 0.16 0.53 0.66 5.00 5.00 0.24 1.05 7 7 0.10 0.64 0.80 5.00 5.00 0.19 0.81 8 8 0.12 0.45 0.56 5.00 5.00 0.15 0.67 9 9 0.14 0.20 0.25 7.21 6.82 0.07 0.31 10 10 0.03 0.20 0.25 5.00 5.00 0.02 0.07 11 11 0.05 0.20 0.25 5.00 5.00 0.03 0.13 12 12 0.14 0.60 0.74 5.00 5.00 0.23 1.01 co1 Co1 0.43 0.74 0.92 5.00 5.00 0.91 3.98 w8 W8 Information taken from "Drainage, Water Quality and Erosion Control Report for Poudre River Whitewater Park"1.50 6.90 w10 W10 Information taken from "Drainage, Water Quality and Erosion Control Report for Poudre River Whitewater Park"2.80 13.20 w11 W11 Information taken from "Drainage, Water Quality and Erosion Control Report for Poudre River Whitewater Park"1.80 8.10 Combined Basins 1a, 1b, 1c, 1d (North Rain Garden)2.55 0.67 0.84 11.47 9.83 3.64 16.80 3a, 3b, 3c (South Rain Garden)0.45 0.89 1.00 5.00 5.00 1.14 4.47 2, 4, 6 to Extended Detention Basin WQ 1.11 0.58 0.73 5.18 5.00 1.84 8.04 1a to 1d, 2, 3a to 3c, 4 and 6 to Detention Pond 4.12 0.67 0.84 11.46 9.82 5.87 27.12 SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)S2 (n:1)Q 1 - 1 1.15 26.45 15.0 8.0 9.42 2 - 2 0.98 15.68 6.0 10.0 2.44 E. VINE DRIVEN. COLLEGE AVENUECHERRY STREET CAC H E L A P O U D R E R I V E R SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 CS1 COVER SHEET1 MARCH 2023 CONTACT INFORMATION PROJECT TEAM: VICINITY MAP NORTH PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-00 ON A CATCH BASIN AT THE SOUTHEAST CORNER OF VINE DR. AND COLLEGE AVE. ELEV.=4968.74 CITY OF FORT COLLINS BENCHMARK 3-13 APPROX. 40 FT SOUTH OF THE LINDEN ST. BRIDGE OVER THE POUDRE RIVER, ON THE WEST SIDE OF LINDEN ST. , ON A STORM INLET. ELEV.=4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE WEST LINE LINE OF THE SOUTHWEST QUARTER OF SECTION 1-7-69 AS BEARING SOUTH 00° 38' 34" WEST (ASSUMED BEARING) AND MONUMENTED AS SHOWN ON PLAT. PROJECT BENCHMARKS: POWERHOUSE 2 PROJECT TEAM: Roger Sherman BHA Design Incorporated 1603 Oakridge Drive, Suite 100 Fort Collins, Colorado 80525 (970)223-7577 Colorado State University Bryan Willson Executive Director, CSU Energy Institute 450 N College Ave. Fort Collins, CO 80524 (970)227-5164 Northern Engineering Services, Inc. Andy Reese 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT OWNER/APPLICANT SITE ENGINEER SHEET INDEX A PARCEL OF LAND LOCATED IN THE SOUTHWEST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SITE SURVEYOR TYPICAL SECTIONS 1 CS1 COVER SHEET 2 CS2 GENERAL & CONSTRUCTION NOTES 3 CS3 EROSION CONTROL NOTES 4 EX1 EXISTING CONDITIONS & DEMOLITION PLAN 5 PV1 PAVING & SIGNAGE PLAN UTILITY SHEETS 6 OU1 UTILITY PLAN SANITARY SHEETS 7 SS1 OFFSITE SANITARY SEWER PLAN & PROFILE 8 SS2 SANITARY SEWER B PLAN & PROFILE STORM SHEETS 9 ST1 POND OUTFALL PLAN & PROFILE 10 ST2 STORM DRAIN C PLAN & PROFILE 11 ST3 STORM DRAIN D PLAN & PROFILE GRADING SHEETS 12 OG1 OVERALL GRADING PLAN 13 - 14 G1 - G2 GRADING PLAN RAIN GARDEN SHEETS 15 RG1 NORTH RAIN GARDEN PLAN & DETAILS 16 RG2 SOUTH RAIN GARDEN PLAN DETAIL SHEETS 17 - 21 D1 - D5 SITE DETAILS 22 - 24 D6 - D8 UTILITY DETAILS 25 - 30 D9 - D14 DRAINAGE DETAILS DRAINAGE SHEETS 31 EC1 INITIAL EROSION CONTROL PLAN 32 EC2 INTERIM EROSION CONTROL PLAN 33 EC3 FINAL EROSION CONTROL PLAN 34 - 35 EC4 - EC5 EROSION CONTROL DETAILS 36 DR1 DEVELOPED DRAINAGE EXHIBIT 37 FP1 FLOODPLAIN EXHIBIT FINAL CONSTRUCTION PLANS FOR E N G I N E E R N GI EHTRON R N E N G I N E E R N GI EHTRON R N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R PROJECT LOCATION UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER APPROVED: City Engineer:Approved Sheets Date Water & Wastewater Utility Approved Sheets Date Stormwater Utility Approved Sheets Date Park Planning and Development Approved Sheets Date Traffic Operations Approved Sheets Date Environmental Planner Approved Sheets Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: Field Survery: Northern Engineering Services, Inc. Date: October 25, 2019 FIELD SURVEY BY: These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CTL Thompson, Inc Geotechnical Investigation Proposed Improvements Powerhouse 2 Project No. FC10223-125 Date: March 14, 2022 SUBSURFACE EXPLORATION BY: Travel 69' ROW (min.) 42' Roadway 5' Walk (min.)(min.) Pkwy. 8.5' Pkwy. 5' (min.) 8.5' 11' Util. Esmt. 9' Esmt. Util. 9' (min.) Walk Travel 11' 7' Lane Bike 3'7' Lane Bike 3' Bike Lane Buffer Bike Lane Buffer 2 LANE ARTERIAL w/ PARALLEL PARKING (EAST VINE DRIVE) 2 LANE COLLECTOR (JEROME STREET) (min.) Walk 84' ROW (min.) 52' Roadway 7' Pkwy. 6' (min.) 8' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer Bike Lane Buffer Lane Bike (min.) Walk 84' ROW (min.) 52' Roadway 7' Walk (min.) (min.) Pkwy. 10' Pkwy. 6' (min.) 10' Util. Esmt. 15' Esmt. Util. 15' Center 10' Travel 11' Travel 11' 3' Lane Bike 7'3' Bike Lane Buffer 6' Bike Lane Buffer Lane Bike 8' Parallel Parking (min.) Walk Pkwy. 6' (min.) 8' Esmt. Util. 15' 8' Parallel Parking 2 LANE ARTERIAL (EAST VINE DRIVE) Pedestrain Access Easement Pedestrain Access Easement LAKE CANAL GAS-----------------Xcel Energy-----------------------------Cory Thelen (970) 225-7843 ELECTRIC--------City of Fort Collins Light & Power--Cody Snowdon (970) 416-2306 CABLE-------------Comcast----------------------------------Don Kapperman (970) 567-0425 TELECOM.--------Lumen-------------------------------Brady Craddock (970) 342-3431 WATER------------City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 WASTEWATER--City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 STORMWATER-City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 UTILITY PLAN APPROVAL BOXELDER SANITATION DISTRICT CACHE LA POUDRE RESERVOIR COMPANY UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT Does not match the most current format. See written comments. 3/28/2023 SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 CS2 CONSTRUCTION NOTESGENERAL &2 A. GENERAL NOTES 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the Final Drainage Report, dated March 1, 2023 by Northern Engineering shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 City of Fort Collins Benchmark 1-00 On a catch basin at the southeast corner of Vine Dr. and College Ave. ELEV.=4968.74 City of Fort Collins Benchmark 3-13 Approx. 40 ft south of the Linden St. bridge over the Poudre River, on the west side of Linden St. , on a storm inlet. ELEV.=4962.27 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.18' Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. 41.All stationing is based on centerline of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48.Approved Variances are listed as follows: 1) N/A CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1.The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3.All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4.At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a.Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b.Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c.Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9.The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10.All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12.The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13.City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14.A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15.Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16.For additional information see separate Stormwater Management Plan / Erosion Control Report for Powerhouse 2. B. Street Improvement Notes 1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5.All lane lines for concrete pavement should be epoxy paint. 6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8.Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10.All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12.The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13.Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the Final Drainage Report, dated March 1, 2023 by Northern Engineering shall be followed and implemented. 3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1.All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3.Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4.HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal valve box and "water" lid per City Water Detail 11A. INFILL AND REDEVELOPMENT NOTE A.Despite everyone's best efforts, it is impossible to fully display subsurface information prior to excavation. This is especially true in areas of infill and redevelopment. Unknown subsurface conditions can have cost and schedule implications. Prior to finalizing contract terms, it is strongly recommended that the Owner and General Contractor have a candid discussion to formulate a strategy for dealing with such circumstances when they arise. The process and procures should be in place prior to excavation. Allowances and contingencies can address the cost implications, but additional measures are required to deal with scheduling and factors impacting sequence of work. The Architect, Engineer(s), and Construction Surveyor should be made aware of the protocol for dealing with such unknown subsurface conditions prior to starting work. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R 3/28/2023 Does not match the most current format. See written comments. LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLOD LODLODLODLODLODLODLODLODLODS S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSSS VAULT ELEC GGGSSSSSSSS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T SGGGGGGGG GGGGGGGGGGGGGGGXSSS SSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSOHUOHUD FE SGGGG G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE S FE SST STST STST STFESFESFES VAULT ELEC GASSSSS / / / / / / / /S D GCTV CTV CTV CTV CTVGGGGG CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSFSFSFSF SF SF SF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF CF CF C F CF CF CF CF CF CF CF CF CF CF EAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE C A N A L JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF SF SFNORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER LEGEND: SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC1INITIAL EROSION CONTROL PLAN37 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: POWERHOUSE 2 CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap Construction Fence* EROSION CONTROL NOTES: 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE RAIN GARDEN SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THE BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND THE BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE RAIN GARDEN SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE RAIN GARDEN AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE RAIN GARDEN AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE RAIN GARDEN. LIMITS OF DISTURBANCE ROCK SOCK SCOUR-STOP WATTLE DIKE CONCRETE WASH AREA BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD LOD AREA INLET PROTECTION CONSTRUCTION FENCE CF STAGING AREA BENCHMARK/BASIS OF BEARING: 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE FINAL DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. GENERAL NOTES: BENCHMARK: #1 CITY OF FORT COLLINS BENCHMARK 1-00 Elevation=4968.74 BENCHMARK: #2 CITY OF FORT COLLINS BENCHMARK 3-13 Elevation=4962.27 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. IRRIGATED TURF NATIVE SEED SILT FENCE SF 3/28/2023 Does not match the required format. See written comments. Incorrect Sheet Numbering G UGEUGE UGE UGE UGES UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEVAULT ELEC GGGVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T SGGGGGGGG GGGGGGGGGGGGGGGXOHUOHUD FE SGGGG G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE S FE SST STST STST STFESFESFES VAULT ELEC GAS / / / / / / / /D GCTV CTV CTV CTV CTVGGGGG CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR EM GMTFTF SFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFEAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE C A N A L JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE DETENTION POND 25:17:18:127:142:138:166:145:135:173:174:177: 1 29:1 48:149:14:16:122:124:1 17:1 21:1 11:16:11 1 2 : 15:165:152:1SF SFRAIN GARDEN 1 SEE SHEET RG1 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2SFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF CF CF C F CF CF CF CF CF CF CF CF CF CF SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLOD LODLODLODLODLODLODLODLODLODNORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER ROCK SOCK SCOUR-STOP WATTLE DIKE CONCRETE WASH AREA BALE OUTLET PROTECTION LEGEND: INLET PROTECTION VEHICLE TRACKING CONTROL PAD SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC2INTERIM EROSION CONTROL PLAN37 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R AREA INLET PROTECTION TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: POWERHOUSE 2 CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap Construction Fence* EROSION CONTROL NOTES: 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE RAIN GARDEN SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THE BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND THE BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE RAIN GARDEN SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE RAIN GARDEN AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE RAIN GARDEN AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE RAIN GARDEN. CONSTRUCTION FENCE CF STAGING AREA BENCHMARK/BASIS OF BEARING: 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE FINAL DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. GENERAL NOTES: BENCHMARK: #1 CITY OF FORT COLLINS BENCHMARK 1-00 Elevation=4968.74 BENCHMARK: #2 CITY OF FORT COLLINS BENCHMARK 3-13 Elevation=4962.27 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. IRRIGATED TURF NATIVE SEED LIMITS OF DISTURBANCE LOD SILT FENCE SF 3/28/2023 Does not match the required format. See written comments. Incorrect Sheet Numbering G UGEUGE UGE UGE UGES UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEVAULT ELEC GGGVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T SGGGGGGGG GGGGGGGGGGGGGGGXOHUOHUD FE SGGGG G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE S FE SST STST STST STFESFESFES VAULT ELEC GAS / / / / / / / /D GCTV CTV CTV CTV CTVGGGGG CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR EM GMTFTF EAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE C A N A L JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE 24:1 9:16:131:111:129:144:138:1122:157:153:144:155:16 8 : 174:136:1 65 : 1 46:15:145:124:1 87:15 0 : 1 19:15:15:111:124:1 17:1 21:1 12:1 5:16:11 1 2 : 1 POND OUTLET STRUCTURE A TYPE D INLET TYPE R INLET COMBINATION INLET RAIN GARDEN EMERGENCY SPILLWAY RAIN GARDEN EMERGENCY SPILLWAY RAIN GARDEN EMERGENCY SPILLWAYRAIN GARDEN EMERGENCY SPILLWAY LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLOD LODLODLODLODLODLODLODLODLODDETENTION POND RAIN GARDEN 1 SEE SHEET RG1 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2 NORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER LEGEND: SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC3FINAL EROSION CONTROL PLAN37 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: POWERHOUSE 2 CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap Construction Fence* EROSION CONTROL NOTES: 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE RAIN GARDEN SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THE BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND THE BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE RAIN GARDEN SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE RAIN GARDEN AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE RAIN GARDEN AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE RAIN GARDEN. ROCK SOCK SCOUR-STOP WATTLE DIKE CONCRETE WASH AREA BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD AREA INLET PROTECTION CONSTRUCTION FENCE CF STAGING AREA BENCHMARK/BASIS OF BEARING: 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE FINAL DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. GENERAL NOTES: BENCHMARK: #1 CITY OF FORT COLLINS BENCHMARK 1-00 Elevation=4968.74 BENCHMARK: #2 CITY OF FORT COLLINS BENCHMARK 3-13 Elevation=4962.27 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. IRRIGATED TURF NATIVE SEED LIMITS OF DISTURBANCE LOD SILT FENCE SF 3/28/2023 Does not match the required format. See written comments. Incorrect Sheet Numbering Line Over Text SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC4EROSION CONTROL DETAILS37 VTC ROCK SOCK SECTION ROCK SOCK PLAN ROCK SOCK JOINTING GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2"100 1-1/2"90-100 1"20-55 3/4"0-15 3/8"0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES RS 001 CONCRETE WASHOUT AREA 002 ROCK SOCK 003 VEHICLE TRACKING PAD 004 SILT FENCE SF CWA 005 CURB INLET PROTECTION IP POSTS PREASSEMBLED SILT FENCE POSTS SHALL OVERLAP AT JOINTS SO THAT NO GAPS EXIST IN SILT FENCE. NOTE: THICKNESS OF GEOTEXTILE HAS BEEN EXAGGERATED.POST SHALL BE JOINED AS SHOWN, THEN ROTATED 180° IN DIRECTION SHOWN AND DRIVEN INTO THE GROUND. SILT FENCE JOINTS DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18". EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE. NO ROAD GRADERS, BACKHOES, ETC. SHALL BE USED. NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE BURIED IN THE TRENCH. THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY WHEEL ROLLING. COMPACTION SHALL BE SUCH THAT THE SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND. SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY. INSTALLATION NOTES: 1. 2. 3. 4. 5. 6. 7. THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM SEDIMENT REACHES A DEPTH OF 6". SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. IF ANY DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. MAINTENANCE NOTES: 1. 2. 3. 4" MIN. 4" MIN. 1 12" x 1 12" WOODEN FENCE POSTS SF 006 SWALE WATTLE DIKE 007 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R WITH NO GAPS (TYP.) TIGHTLY ABUTTING ENTRENCH 3"FLOWFLOWNOTE: ENTRENCH WATTLE 3" INTO NATURAL GROUND AT THE OUTSIDE EDGE OF CONCRETE APRON WATTLE WATTLE OR NOTE: INSTALLATION OF WATTLE STAKES MAY VARY (10" MIN. DIAMETER) IPA DROP INLET WATTLE FILTER 008 CALCULATION TABLE PER FCSCM CH. 2, SEC. 6.1.3.1 Description Estimated Quantity Units Total Disturbed Project Area 5.6 Acre Total "Onsite" Area of Disturbance 4.73 Acre Total "Offsite" Area of Disturbance 0.87 Acre Total Storage/Staging Area 1 Acre Total Haul Roads Area N/A Construction vehicle traffic Area N/A Est. Percent of Project Area Exposed 100 % Est. Percent Vegetation Cover 5 % Existing Soil Type B Table Mountain loam, 0 to 1% slopes Groundwater Depth 8 Feet Number of Phases w/Project N/A Total volume of imported (+) / exported (-) materials 8,900 Cubic Yds. Total area of stockpilling of fill or borrow areas off site 0 Sq. feet Steepest Slope 8:1 H:V Distance from riparian area or sensitive area 0 Feet 3/28/2023 Incorrect Sheet Numbering SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC5EROSION CONTROL DETAILS37 001 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SECTION G-G G PLAN G BOP BALE OUTLET PROTECTION 3/28/2023 Incorrect Sheet Numbering D STT VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS XOHUOHUOHUD FE S/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE SFE SST STST STST ST F E SFE SFE SGAS / / / / / / / /D CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRFLOODWAY ZONE AE 930 72312351341 4964.34966.04967.64964.2 FFE=69.00 JEROME STREET LLC, 216 E OAK ST FORT COLLINS JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE EM GMTFTF 68.8968.85JEROME STREETCOLLEGE AVENUEVINE DRIVE 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) 500 YR FLOOD PLAIN (CURRENT EFFECTIVE) 100 YR FLOOD PLAIN (CURRENT EFFECTIVE) SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 FP1FLOODPLAIN EXHIBIT37 NORTH LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPOSED STORM INLET PROPOSED CONCRETE CROSS PAN (TYP.) PEDESTRIAN ACCESS RAMPS PROPERTY BOUNDARY CROSS-SECTION (CSU CLOMR) 2446 NOTES: 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION 2.THIS PROJECT IS LOCATED WITHIN A FEMA DESIGNATED 100-YEAR FLOODPLAIN FRINGE AND MUST COMPLY WITH CHAPTER 10 OF THE CITY CODE. 3.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NAVD 88). 4.ANY ITEMS LOCATED IN THE FLOODPLAIN ON THE POUDRE RIVER THAT CAN FLOAT (E.G., PICNIC TABLES, BIKE RACKS, ETC.) MUST BE ANCHORED. 5.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION. 6.A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODPLAIN (I.E., CURB CUT REMOVAL, LANDSCAPING). 7.NO OVERNIGHT STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODPLAIN, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODPLAIN. 8.REFER TO THE FINAL DRAINAGE REPORT, DATED MARCH 1, 2023 FOR ADDITIONAL INFORMATION. 9.A POST-CONSTRUCTION ELEVATION CERTIFICATE INCLUDING COMPONENTS LIKE TRANSFORMER, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, ELEVATOR, HVAC EQUIPMENT, EMERGENCY VEHICLE ACCESS GATE, OTHER ELECTRICAL AND MECHANICAL SYSTEMS, ETC. MUST BE APPROVED BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. 10.TRANSFORMER, YARDS, EV CHARGING STATIONS, SOLAR PANEL COMPONENTS, ELEVATOR, HVAC EQUIPMENT, EMERGENCY VEHICLE ACCESS GATE, OTHER ELECTRICAL AND MECHANICAL SYSTEMS ARE TO BE PLACED AT OR ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. 11.FURNITURE OR SITE COMPONENTS WILL BE SECURELY ANCHORED TO GRADE WITH A SYSTEM TO BE 4" LAGS BOLTS EPOXIED INTO GROUND BASE CONCRETE OR STONE WITH STRAPS AND/OR CHAINS SECURED TO ELEMENTS TO PREVENT FLOTATION. ANCHORING DETAILS WILL BE SUPPLIED AT THE TIME OF THE FLOODPLAIN USE PERMIT. 12.ALL ELEVATORS INSTALLED BELOW THE RFPE IN THE PROJECT WILL COMPLY WITH FEMA NFIP TECHNICAL BULLETIN 4 JUNE, 2019 AND THE 2021 IBC. 13.HORIZONTAL CONTROL: CITY OF FORT COLLINS GROUND MASTER CONTROL. 14.CRITICAL FACILITIES ARE PROHIBITED IN THE FLOODPLAIN, INCLUDING HAZARDOUS MATERIAL, GOVERNMENT SERVICES, ESSENTIAL SERVICES AND AT-RISK POPULATION CRITICAL FACILITIES. THIS INCLUDES SCHOOLS AND AFTER SCHOOL PROGRAMS/DAY CAMPS FOR GRADES K-12. 15.AN EMERGENCY RESPONSE AND PREPAREDNESS PLAN (ERPP) WILL BE REQUIRED BY THE CITY OF FORT COLLINS PRIOR TO A FLOODPLAIN OR BUILDING PERMIT BEING ISSUED. 16.OUTDOOR CLASSROOM AS AN INFORMAL OUTDOOR GATHERING SPACE TO BE USED FOR SITE TOURS AND OUTDOOR LEARNING. THESE SPACES WILL BE CONSTRUCTED USING LARGE BOULDERS AND CRUSHED-FINE SURFACING. 17.THE QUANTITIES LISTED BELOW AND THE REMOVAL OF HYDROGEN STORAGE FROM THE SITE, WILL REMOVE THE DESIGNATION OF A “CRITICAL FACILITY', AS PER DEFINED BY CHAPTER 10 OF CITY CODE, FROM THE PROJECT. MATERIAL STORAGE RESTRICTIONS WILL BE REMOVED WITH THE APPROVAL OF THE LOMR. THE FOLLOWING OUTLINES THE HANDLING AND STORAGE PROCESSES OF HYDROGEN FOR RESEARCH PROCEDURES ANTICIPATED AT THE PROPOSED POWERHOUSE II FACILITY: ·HYDROGEN PRODUCED BY HYDROLYSIS OR SIMILAR METHOD WILL BE DISPOSED OF AS PRODUCED VIA VENTING OUTDOORS (AS PER ANY CODE REQUIREMENTS), BURNED IN OUTDOORS IN A NON-VISIBLE FLARE, CONSUMED BY FUEL CELL OR SIMILAR DEVICE. ·ONSITE STORAGE OF HYDROGEN WILL REMAIN AT OR BELOW QUANTITIES REGULATED BY INTERNATIONAL FIRE SAFETY CODE OR “HOUSEHOLD LEVELS” ·HYDROGEN FUELED VEHICLES, SUCH AS AUTOMOBILES, LIGHT AND MEDIUM DUTY TRUCKS, AND TRANSIT BUSES WILL BE TESTED ONSITE AND ADHERE TO ALL FIRE SAFETY CODES AND DOT REGULATIONS REGARDING HYDROGEN FUELED VEHICLES. NO VEHICLES WILL BE STORED OUTSIDE OVERNIGHT PER THE FLOATABLE MATERIALS REQUIREMENTS IN CHAPTER 10 OF CITY CODE. ·H2 STORAGE TANKS WILL REMAIN AT POWERHOUSE I UNTIL APPROVAL OF THE LOMR. FLAMMABLE MATERIALS: ·ACETYLENE : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. ·OXYGEN : 1 COMMERCIAL CYLINDER AT 300 OR LESS STD. CU. FT. VOLUME. NON-REACTIVE GASES: ·COMPRESSED AIR : 500 GAL. TANK ·COMPRESSED NITROGEN : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED ARGON : 2000 L. CRYOGENIC TANK, LIQUID ·COMPRESSED HELIUM : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED ARGON : <20 - 300 STD. CU FT, STEEL CYLINDERS ·COMPRESSED CO2 : <20 - 300 STD. CU FT, STEEL CYLINDERS 18.THE PROPOSED POWERHOUSE II BUILDING IS PROJECTED TO HOUSE SEVERAL TYPES OF ORGANIZATIONS: RETAIL, PRIVATE COMPANIES WORKING IN ENERGY INDUSTRY, AND COLORADO STATE UNIVERSITY (CSU) FUNCTIONS RELATING TO SPONSORED RESEARCH. THE CSU SPACE WILL BE ASSIGNED TO RESEARCHERS TO CONDUCT SPONSORED RESEARCH FOR INDUSTRY AND GOVERNMENT (LOCAL, CITY, STATE AND FEDERAL) SPONSORS. THESE SPACES WILL NOT BE USED FOR TRADITIONAL EDUCATIONAL FUNCTIONS SUCH AS CLASSROOM INSTRUCTION OR LABORATORY INSTRUCTION. WHILE UNIVERSITY EMPLOYEES (RESEARCHERS, STAFF, AND STUDENT EMPLOYEES) WILL BE USING THE SPACE THEY WILL NOT BE ENGAGED IN INSTRUCTIONAL ACTIVITIES. GOVERNMENT SERVICES FACILITIES INCLUDE ESSENTIAL STRUCTURES SUCH AS DORMITORIES, OFFICES, CLASSROOMS, AND LABORATORIES FOR PUBLIC HIGHER EDUCATION FACILITIES. POWERHOUSE II WILL NOT BE USED FOR DORMITORY HOUSING. NOR WILL IT HAVE INSTRUCTIONAL CLASSROOMS AND THE LABORATORY AND OFFICE SPACES WILL BE USED SOLELY FOR SPONSORED RESEARCH ACTIVITIES. GIVEN THIS DEFINITION AND PURPOSES, POWERHOUSE II SHOULD NOT BE CLASSIFIED AS A GOVERNMENT SERVICES FACILITY PER CHAPTER 10 OF CITY CODE AND THE RESTRICTIONS ASSOCIATED WITH THIS DESIGNATION. BENCHMARKS: 5000ELEVATION NGVD 88 100-YR FLOODPLAIN - (PER CSU CLOMR) PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 1-00 ON A CATCH BASIN AT THE SOUTHEAST CORNER OF VINE DR. AND COLLEGE AVE. ELEV.=4968.74 CITY OF FORT COLLINS BENCHMARK 3-13 APPROX.40 FT SOUTH OF THE LINDEN ST. BRIDGE OVER THE POUDRE RIVER, ON THE WEST SIDE OF LINDEN ST. , ON A STORM INLET. ELEV.=4962.27 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.18' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE WEST LINE LINE OF THE SOUTHWEST QUARTER OF SECTION 1-7-69 AS BEARING SOUTH 00° 38' 34" WEST (ASSUMED BEARING) AND MONUMENTED AS SHOWN ON PLAT. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MINIMUM FINISHED FLOOR ELEVATION (RFPE) ELEVATION = C BASE FLOOD ELEVATION (BFE) = A MINIMUM MECH./ELEC. EQUIPMENT ELEVATION = B (RFPE) BASE FLOOD ELEVATION (BFE) = A MECH. / ELEC. EQUIPMENT FLOOD ELEVATION DETAIL NTS SLAB-ON-GRADE BUILDING SUMMARY ELEV. DESIGNATION PROJECT ELEV. (NAVD 88) A 4966.44 FT B 4968.44 FT C 4968.44 FT FINISHED FLOOR ELEVATION 4969.00 FT FIELD SURVEY BY: NORTHERN ENGINEERING DATED: OCTOBER 25, 2019 3/28/2023 Does not match the required format. See written comments. G UGEUGE UGE UGE UGES UD UD UD UD UD UD UDUDUDUD UD UD UD UD UD UD UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEVAULT ELEC GGGVAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC ELEC T VAULT F.O.F.O. D CONTROL IRR CONTROL IRR GAS ELEC BRKR T SGGGGGGGG GGGGGGGGGGGGGGGXOHUOHUD FE SGGGG G/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE S FE S FE SST STST STST STFESFESFES VAULT ELEC GAS / / / / / / / /D GCTV CTV CTV CTV CTVGGGGG CTV CTV CTV CTV CTV CTV CTV CTV VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR EM GMTFTF SFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFEAST VINE DRIVECOLLEGE AVENUEJEROME STREETLAKE C A N A L JEROME STREET LLC, 216 E OAK ST JEROME STREET STATION LLC, 742 N COLLEGE AVE LMC VENTURES LLC, 742 N COLLEGE AVE CITY OF FORT COLLINS 405 N COLLEGE AVE MORAK KAREN LLC 622 N COLLEGE AVE CITY OF FORT COLLINS, 740 N COLLEGE AVE DETENTION POND 25:17:18:127:142:138:166:145:135:173:174:177: 1 29:1 48:149:14:16:122:124:1 17:1 21:1 11:16:11 1 2 : 15:165:152:1SF SFRAIN GARDEN 1 SEE SHEET RG1 SOUTH RAIN GARDEN 1 SEE SHEET RG2 SOUTH RAIN GARDEN 2 SEE SHEET RG2 SOUTH RAIN GARDEN 3 SEE SHEET RG2SFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF CF CF C F CF CF CF CF CF CF CF CF CF CF SF SF SF SF SF SF SF SF SF SFCF CF CF CF CF CF LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLOD LODLODLODLODLODLODLODLODLODNORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER ROCK SOCK SCOUR-STOP WATTLE DIKE CONCRETE WASH AREA BALE OUTLET PROTECTION LEGEND: INLET PROTECTION VEHICLE TRACKING CONTROL PAD SheetPOWERHOUSE 2These drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 37 EC2INTERIM EROSION CONTROL PLAN37 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R AREA INLET PROTECTION TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: POWERHOUSE 2 CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING BEST MANAGEMENT PRACTICES (BMPS) STRUCTURAL "INSTALLATION" Silt Fence Barriers * Flow Barriers (Wattles) * Inlet Filter Bags * Vegetative Temporary Seeding Planting Mulching / Sealant Permanent Seeding Planting Sod Installation Rolled Products : Netting / Blankets / Mats Contour Furrows (Ripping / Disking) Rock Bags * UTILITIES INSTALLATION FLAT WORK INSTALLATION VERTICAL INSTALLATION LANDSCAPE DEMOBILIZATION Vehicle Tracking Pad * * All Temporary BMPs to be Removed once Construction is Complete Any prior inlets that could use protecting Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Anytime the site will sit dormant longer than 30 Days Riprap Construction Fence* EROSION CONTROL NOTES: 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE RAIN GARDEN SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THE BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND THE BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE RAIN GARDEN SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE RAIN GARDEN AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE RAIN GARDEN AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE RAIN GARDEN. CONSTRUCTION FENCE CF STAGING AREA BENCHMARK/BASIS OF BEARING: 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone ________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE FINAL DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. GENERAL NOTES: BENCHMARK: #1 CITY OF FORT COLLINS BENCHMARK 1-00 Elevation=4968.74 BENCHMARK: #2 CITY OF FORT COLLINS BENCHMARK 3-13 Elevation=4962.27 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on Plat. IRRIGATED TURF NATIVE SEED LIMITS OF DISTURBANCE LOD SILT FENCE SF